Search Results

Primary view of Results of Shear Fatigue Tests of Joints With 3/16-Inch-Diameter 24S-T31 Rivets in 0.064-Inch-Thick Alclad Sheet: Addendum No. 1
Holt, Marshall
February 1950
Primary view of Basic Radio Propagation Predictions for December 1959 Three Months in Advance
Central Radio Propagation Laboratory (U.S.)
September 1959
Primary view of Basic Radio Propagation Predictions for September 1959 Three Months in Advance
Central Radio Propagation Laboratory (U.S.)
June 1959
Primary view of Basic Radio Propagation Predictions for October 1959 Three Months in Advance
Central Radio Propagation Laboratory (U.S.)
July 1959
Primary view of Basic Radio Propagation Predictions for November 1959 Three Months in Advance
Central Radio Propagation Laboratory (U.S.)
August 1959
Primary view of TTA Extraction Curves
Sheperd, E. & Meinke, W. W.
October 24, 1958
Primary view of Boundary Layer Control Applied to Tail Surfaces of Aircraft, Part 2. Final Report
Gertsen, W. M. & Wise, W. D.
December 1957
Primary view of Boundary Layer Control Applied to Tail Surfaces of Aircraft, Part 1. Wind Tunnel Report
Leisher, L. L. & Gertsen, W. M.
December 1957
Primary view of Steam-Cooled Reactor Feasibility Study: Steam Water Reactor (SWR), Volume 2 (Sections 7 and 8)
East Central Nuclear Group
August 15, 1958
Primary view of Steam-Cooled Reactor Feasibility Study: Steam Water Reactor (SWR), Volume 1 (Sections 1-6)
East Central Nuclear Group
August 15, 1958
Primary view of Survey of Human Dynamics Data and a Sample Application
Senders, John W., 1920-
November 1959
Primary view of Technical Information, Preliminary Hazards Summary Report, Volume 2, Part B: License Application
Carolinas Virginia Nuclear Power Associates, Inc.
July 15, 1959
Primary view of Allis-Chalmers Critical Facility: Final Safeguards Report
Allis-Chalmers Manufacturing Company
May 1, 1959
Primary view of Electrochemical Stabilization Experiment Station 2056+50 to 2065+00, Friant-Kern Canal, Central Valley Project, California
Gibbs, H. J.
June 19, 1958
Primary view of Laboratory Studies on Subgrade and Embankment Soils for the Main Canal and Laterals, Hammond Project, New Mexico
Ellis, Willard
February 18, 1958
Primary view of Evaluation of Earth Lining Materials Courtland Canal, Bostwick Division, Missouri River Basin Project, Nebraska
Lowitz, C. A.
July 16, 1959
Primary view of Aspects of Pilot Decision Making
Williams, Alexander Coxe & Hopkins, C. O.
December 1958
Primary view of Laboratory Tests on Proposed Subgrade and Canal Lining Materials -- Seedskadee Project, Wyoming
Ellis, W.
June 28, 1957
Primary view of Laboratory Studies on Embankment Materials, Main Canal East -- Michaud Flats Project, Idaho
Snively, R. C.
June 8, 1957
Primary view of Laboratory Tests on Proposed Embankment and Subgrade Materials, Hanover Main Canal No. 2, Hanover Bluff Unit, Missouri River Basin Project
Ellis, W.
May 18, 1955
Primary view of An Investigation of Strain - Energy Absorption Potential as the Criterion for Determining Optimum Reactor - Vessel Containment Design
Wise, Walter R., Jr.
June 30, 1958
Primary view of Development and Evaluation of Insulating Type Ceramic Coatings
Blocker, E. W.; Hauck, C. A.; Sklarew, S. & Levy, A. V.
November 1959
Primary view of Modification of a Bausch & Lomb Spectronic 20 Colorimeter-Spectrophotometer For In-Line Applications
Gayle, T. M. (Tom M.)
December 29, 1959
Primary view of Chemistry of Pu(IV) Polymer
Rainey, R. H.
December 30, 1959
Back to Top of Screen