Search Results

open access

Electromagnetic Research Division Quarterly Progress Report: Part I for Period Ending December 31, 1951

Description: From abstract: "Operation of the 86-inch cyclotron has been continuous except for a three-day interruption caused by a water leak inside the vacuum chamber; monthly output has averaged over 210,000 [mu]a-hr; the average continuous (168-hour week) beam power has been approximately 5.5 kw; and the energy of the beam has been determined to be ~19.4 Mev. No changes due to radiation damage have been detected in Inconel tubes containing UF4-NaF-KF eutectic which were irradited in the 96-inch cyclotro… more
Date: January 15, 1952
Creator: Livingston, Robert S. & Howard, F. T.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen