This system will be undergoing maintenance October 10th between 9:00AM and 12:00PM CDT.

Search Results

Primary view of Mass Yields From Fission by Neutrons Between Thermal and 14.7 Mev
Ford, George P. & Gilmore, James S.
February 1965
Primary view of Photoelastic evaluation of Phoebus 2 main closure design
Fischer, M. A.
February 5, 1965
Primary view of Design and Operating Experience of the ESADA Vallecitos Experimental Superheat Reactor (EVESR)
Ianni, P. W.; Fritz, J. R. & Law, D. D.
February 1965
Primary view of Lithologic Log of the U12g.06-U1 Core Drill Hole, Area 12, Nevada Test Site
Emerick, W. L.
February 15, 1965
Primary view of River temperature fluctuation problem
Gustafson, L. D.
February 26, 1965
Primary view of Analysis of PT-684-A hot die size process parameters evaluation
unknown creator
February 4, 1965
Primary view of Technical feasibility of using uranium oxide fuels at Hanford
unknown creator
February 15, 1965
Primary view of Reactor Branch monthly report, January--December 1965
Plum, R. L.
February 9, 1965
Primary view of Pressure drop characteristics of solid aluminum dummy patterns in K Zircaloy-2 process tube
Angle, C. W.
February 16, 1965
Primary view of Vertical bowing measurements, C Reactor
Ferguson, J. H.
February 25, 1965
Primary view of Research and Engineering Operation Irradiation Processing Department monthly record report, January 1965
Greager, O. H.
February 3, 1965
Primary view of Status of special reactor process tube loadings February 1, 1965
Bown, R. W.
February 12, 1965
Primary view of Minutes: Graphite distortion, VSR, HCR serviceability program meeting, February 4, 1965
Peterson, R. S.
February 17, 1965
Primary view of Examination of furnace belt failure in 232-Z incinerator
Nelson, T. C.
February 11, 1965
Primary view of Radioactive Liquid Waste Disposal for December, 1964
Wilson, R. H.
February 17, 1965
Primary view of Production Test IP-719: The effect of water plant variables on effluent activity. Final report
Geier, R. G.
February 23, 1965
Primary view of Exposure data, Y test hole - C reactor
Ferguson, J. H.
February 25, 1965
Primary view of Chemical Processing Department Monthly Report: January 1965
Hanford Atomic Products Operation. Chemical Processing Department.
February 23, 1965
Primary view of Radiochemical analyses of water samples collected postshot in the vicinity of Tatum Dome, Mississippi. Technical letter: Dribble 42
Janzer, V. J. & Rucker, S. J.
February 8, 1965
Primary view of Computer calculation of angular momentum coupling coefficients and of (d,p) stripping reaction cross section. Technical report No. 14. [B53 DWC, B53GOR, B53RIM, B53SIX, in FORTRAN]
Strobel, G.L.
February 1, 1965
Primary view of Hazards Summary for the Accelerator Pulsed Fast Assembly
Crosbie, K. L. & Russell, J. L., Jr.
February 25, 1965
Primary view of Geologic Map and Sections of the Thirsty Canyon Southeast Quadrangle, Nye County, Nevada
Lipman, P. W.; Quinlivan, W. D.; Carr, W. J. & Anderson, R. E.
February 1965
Primary view of THE COMPRESSIBILITY OF GASEOUS MIXTURES OF HELIUM-NITROGEN AND HELIUM- DEUTERIUM AT HIGH PRESSURES
Cramer, J.D.
February 15, 1965
Primary view of IRRADIATION SWELLING, PHASE REVERSION, AND INTERGRANULAR CRACKING OF U-10 wt.% Mo FUEL ALLOY
Willard, R. M. & Schmitt, A. R.
February 1, 1965
Back to Top of Screen