Search Results

Primary view of Calibration of Control Drums in a Sub-Critical Assembly
Rothman, A. B.
February 28, 1963
Primary view of Control rod studies
Cole, A.
February 28, 1963
Primary view of The Diffusion of Lithium in Aluminum
Costas, L. P.
February 28, 1963
Primary view of Nucleon-Meson Cascade Calculations: Transverse Shielding for a 45-Gev Electron Accelerator. Part Ii
Alsmiller, R. G., Jr.; Alsmiller, F. S. & Murphy, J. E.
February 28, 1963
Primary view of A PRELIMINARY EXAMINATION OF THE FORMATION AND UTILIZATION OF TEXTURE AND ANISOTROPY IN ZIRCALOY-2
Picklesimer, M.L.
February 28, 1963
Primary view of Radiation Survey of the Reactor Vessel Head. Core 1, Seed 3. Test Evaluation
unknown creator
February 28, 1963
Primary view of Scattering of 14-Mev Neutrons From Nitrogen and Oxygen
Bauer, R. W.; Anderson, J. D. & Christensen, L. J.
February 27, 1963
Primary view of Development of Batch Formulation Equations for Graphite Fuel Elements
unknown creator
February 26, 1963
Primary view of Derivation of Linearized, Difference-Differential Equations for Analog Computer Studies of Gas-Flow Oscillations
Stubbs, G.S.
February 25, 1963
Primary view of Neutron Thermalization Programs for the IBM 7090
Preskitt, C.A.; Nephew, E.A. & Tsagaris, M.E.
February 25, 1963
Primary view of Three-Component Body Composition Analysis Based on Potassium and Water Determinations
Anderson, E. C.
February 25, 1963
Primary view of A TRANSFER FUNCTION FOR D.C. OPERATIONAL AMPLIFIERS WITH GENERALIZED EXTERNAL NETWORKS
Gossmann, S.R.
February 25, 1963
Primary view of Waste Management Program: Chemical Processing Department
Tomlinson, R. E
February 25, 1963
Primary view of Evaluation of ejector systems for ETS-1. Interim report, 1 October 1962-- 31 January 1963
Nelson, R. E. & Patmor, G. O.
February 22, 1963
Primary view of Chemical Processing Department Monthly Report: January 1963
Hanford Atomic Products Operation. Chemical Processing Department.
February 21, 1963
Primary view of Comments on E-MAD Phase II drawings received between 2/14/63 and 2/19/63
Svasek, A.J.
February 21, 1963
Primary view of Nucleon-Meson Cascade Calculations: Shielding Against an 800-Mev Proton Beam
Alsmiller, R. G., Jr. & Murphy, J. E.
February 21, 1963
Primary view of PHASE EQUILIBRIA IN THE SYSTEM NaF-UF$sub 4$
Thoma, R.E.; Insley, H.; Hebert, G.M.; Friedman, H.A. & Weaver, C.F.
February 21, 1963
Primary view of SNAP (SYSTEMS FOR NUCLEAR AUXILIARY POWER) TECHNICAL BRIEFS. PART 8. AEROSPACE SAFETY
unknown creator
February 21, 1963
Primary view of PRELIMINARY PLANS FOR USE OF HOUGH-POWELL BUBBLE DENSITY MEASUREMENTS
Strand, R.C.
February 19, 1963
Primary view of DEVELOPMENT OF A RELIABLE LINE DISCONNECT FOR THE TRANSURANIUM PROCESSING FACILITY
Mackey, T. S.
February 18, 1963
Primary view of The Large Component Test Loop-Description and Operating Capabilities
Atz, R. W.
February 18, 1963
Primary view of The mass spectra of the {alpha}-amino acids
Junk, Gregor & Svec, Harry
February 18, 1963
Primary view of POWER FLATTENING STUDIES FOR RADIOISOTOPE-THERMOELECTRIC GENERATORS. Final Report
Rush, R. E. & Belofsky, H.
February 18, 1963
Back to Top of Screen