Search Results

Primary view of Hanford Laboratories Operation Monthly Activities Report: March 1957
Albaugh, E. W.
April 15, 1957
Primary view of HRT-CP: Results of H{sub 2}O-D{sub 2}O Separation Tests
Albrecht, W. L.
July 15, 1957
Primary view of Interim report on the development of a plastic bonded explosive
Archibald, P. B.
July 15, 1957
Primary view of Graphical Aids in the Calculation of the Shielding Requirements for Spent U²³⁵ Fuel
Ashley, R. L.
November 15, 1957
Primary view of Alternating Current Polarography: Determination of the Transfer Coefficient of Electrochemical Processes. Report No. 27
Bauer, H. H. & Elving, P. J.
July 15, 1957
Primary view of Irradiation Experiment on Aluminum Fuel Element Containing U$sub 3$O$sub 8$ Dispersion
Beaver, R. J.
July 15, 1957
Primary view of Monte Carlo Research Series: Gamma Heating Study No. 1: Gamma Heating Rate Density Radial Variation in a Core Cell for Three Fuel Cylinder Spacings
Beeler, J. R., Jr.; Nelson, R. H. & Herrmann, R. G.
October 15, 1957
Primary view of Experimental Investigation of Water Injection in Subsonic Diffuser of a Conical Inlet Operation at Free-Stream Mach Number of 2.5
Beke, Andrew
January 15, 1957
Primary view of Enrichment of Isotopes by the Difference in Rates of Isotopic Reactions
Bernstein, R. B.
April 15, 1957
Primary view of Geology of the Uniferous Bog Deposit at Pettit Ranch, Kern County, California
Bowes, William A.; Bales, W. E. & Haselton, G. M.
October 15, 1957
Primary view of Special hazards report - I E fuel loads
Brown, J.H.; Fullmer, G. C.; Trumble, R. E. & VanWormer, F. W.
October 15, 1957
Primary view of Sodium Graphite Reactor Quarterly Progress Report for October-December 1956
Carter, R. L.
May 15, 1957
Primary view of Research and Investigation Leading to Methods of Generating and Detecting Radiation in the 100 to 1000 Micron Wavelength Range of the Spectrum. Quarterly Progress Report No. 7 for September 1, 1957 to December 1, 1957
Coleman, P. D.; Becker, R. C.; Kenyon, R. J.; Spuhler, H. A.; Stafford, J. J. & Swago, A. W.
December 15, 1957
Primary view of Research and Investigation Leading to Methods of Generating and Detecting Radiation in the 100 to 1000 Micron Wavelength Range of the Spectrum. Technical Progress Report No. 2 (Quarterly Report No. 6) for June 1, 1957 to September 1, 1957
Coleman, P. D.; Sirkis, M. D.; Becker, R. C.; Kenyon, R. J.; Spuhler, H. A. & Swago, A. W.
September 15, 1957
Primary view of A STUDY OF ERROR EFFECTS IN MEASURING CYCLIC-TEMPERATURE HEAT-TRANSFER COEFFICIENTS
Dingee, D.A. & Chastain, J.W.
February 15, 1957
Primary view of Special Zirconium Alloys. Report No. 18 (Summary) for January 1, 1956- October 31, 1957
Domagala, R. F. & Levinson, D. W.
October 15, 1957
Primary view of Experimental Investigation of Diffuser Pressure Ratio Control With Shock Positioning Limit on 28 Inch Ram-Jet Engine
Dunbar, William R.; Wentworth, Carl B. & Crowl, Robert J.
January 15, 1957
Primary view of Experimental Investigation of Diffuser Pressure-Ratio Control With Shock-Positioning Limit on 28-Inch Ram-Jet Engine
Dunbar, William R.; Wentworth, Carl B. & Crowl, Robert J.
January 15, 1957
Primary view of A STUDY OF THE PRIMARY SHIELD FOR THE PRDC REACTOR
Epstein, H.M.; Dingee, D.A. & Chastain, J.W.
April 15, 1957
Primary view of Plating Thickness Tester
Fitch, C. E., Jr.
November 15, 1957
Primary view of Preliminary Design Requirements Argonne Boiling Reactor (ARBOR) Facility
Fromm, L. W.; Bernsen, S. A.; Bullinger, C. F. & Matousek, J. F.
July 15, 1957
Primary view of Preliminary Design Requirements Argonne Boiling Reactor (Arbor) Facility. Revision I
Fromm, L. W.; Bernsen, S. A.; Bullinger, C. F. & Matousek, J. F.
July 15, 1957
Primary view of The Time-Dependent Neutron Flux for a Pulsed Subcritical Assembly
Fults, Stanley C.
April 15, 1957
Primary view of Additional Measurements on the Army Package Power Reactor Zero Power Experiments: ZPE-1 and ZPE-2
Giesler, H. W.
November 15, 1957
Back to Top of Screen