Search Results

Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959
Aerojet-General Corporation
July 31, 1959
Primary view of Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Knecht, R. L.
July 31, 1959
Primary view of Reconnaissance for Uranium in Spain (1955-1957)
Keys, W. S. & Henderson, James G.
July 9, 1959
Primary view of In-Pile Loop Tests of GCRE Elements (I-IT and I-I'T)
Nakazato, S.; Williams, P. M. & Wilson, W. D.
July 2, 1959
Primary view of Advanced Pressurized Water Reactor Study [Part 1]: Phase 1 Report
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Advanced Pressurized Water Reactor Study [Part 3]: 235 Mw Coal-fired Generating Plant
U.S. Atomic Energy Commission. Division of Reactor Development.
July 1959
Primary view of Boiling Water Reactor Study [Part 1]: 306 Mw Power Reactor Conceptual Design
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 2]: Separate Studies
Ebasco Services Incorporated
July 1959
Primary view of Boiling Water Reactor Study [Part 3]: 306 Mw Coal-Fired Installation
Ebasco Services Incorporated
July 1959
Primary view of The Chattanooga Shale of Tennessee as a Source of Uranium: Final Report
Stockdale, Paris B. & Klepser, Harry J.
July 1, 1959
Primary view of Design and Test Analysis of the Magnetic Jacking Positive Latch Control Rod Drive Mechanism
Balog, L. J.; Bishop, A. A. & Widmer, Thomas F.
July 1959
Primary view of Hydrologic and Tracer Studies in Mohawk River at Knolls Atomic Power Laboratory
Simpson, Eugene Sidney; Beetem, W. A. & Ruggles, F. H., Jr.
July 1959
Primary view of Kinetics of the Alkylation and Acylation of Nickel Dipivaloyimethide
Johnson, Kenneth Eugene & Hammond, George Simms, 1921-2005
July 1959
Primary view of Organic Cooled Reactor Study [Part 3]: Reactor Concept Evaluation
Bechtel Corporation
July 1959
Primary view of Organic Cooled Reactor Study [Part 4]: 75 Mw Power Plant Conceptual Design
Bechtel Corporation
July 1959
Primary view of Possibilities for Additional Uranium in Belgian Congo
Judd, Edward K.
July 1959
Primary view of The Sayapullo Mine Area, Cajamarca Department, Peru
Gabelman, John W.
July 1959
Primary view of The applicability of resistivity, self-potential and radiometric logging techniques to stratigraphic and lithologic problems in the Ambrosia Lake area, New Mexico
Misz, J. B.
July 31, 1958
Primary view of Yankee Atomic Electric Company Research and Development Program: Quarterly Progress Report: April 1, 1958 to June 30, 1958
Coen, L. H. & Garbe, R. W.
July 30, 1958
Primary view of Reactor Analysis APPR-1 Core II
Williamson, T. G.; Leibson, M. J. & Bryne, B. J.
July 15, 1958
Primary view of Possibilities for Uranium in Indonesia
Judd, Edward K.
July 1958
Primary view of Summary Report on Thorium Metal Quality for Production Reactor Use
Hayes, Edgar E.
July 1958
Primary view of A Neutron Absorption Alignment Chart
Nisle, Robert G.
July 30, 1957
Primary view of HASL Aerial Survey System
Cassidy, M. E.; Graveson, R. T. & LeVine, H. D.
July 29, 1957
Back to Top of Screen