Search Results

Primary view of 5.6 Mass Spectrographs
Evald, H. & Marschall, H.
unknown creation date
Primary view of 6.70 EV Resonance in U²³⁸
Levin, Jules S.
November 9, 1953
Primary view of 11,400 KW Nuclear Power Plant Employing an Organic Moderated Reactor: Preliminary Description
Wheelock, C. W.
1957
Primary view of 15 MW Gas-Cooled Closed-Cycle Reactor Power System Study: Final Report, Volumes 1-2
Ford Instrument Company
April 1, 1957
Primary view of 20,000 KW Nuclear Power Plant Study for United States Atomic Energy Commission
Gilbert Associates, Inc.
July 7, 1957
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System
Alco Products (Firm)
January 31, 1962
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 2, Chemical and Stress Analysis
Alco Products (Firm)
February 28, 1962
Primary view of 30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 4, Operation and Maintenance Procedures
Alco Products (Firm)
May 15, 1962
Primary view of A 37,500 KW Power Reactor with Competitive Possibilities
Thompson, W. I. & Cohen, Karl
February 26, 1954
Primary view of #85-Classical Model of a Light Source
Born, Max, 1882-1970
unknown creation date
Primary view of 100-Ton Test at Trinity: Report on Earth Velocity Measurements
Coon, J. H.; Houghton, H. M. & Nobles, Ralph
June 13, 1945
Primary view of 100-Ton Test : Measurement of the Velocity of Sound
Barschall, H. H. & Martin, G.
June 15, 1945
Primary view of 200-Mwe Prototype Large SGR: Reactor Structure Design and Evaluation
North American Aviation. Atomics International Division.
1965
Primary view of 300,000-KWE SGR Nuclear Power Plant of Current Technology
Renard, J.; Peckinpaugh, C. L. & Aronstein, R. E.
August 1, 1960
Primary view of 300-KV Pulser Transformer and Pulser.
Heller, R. E.
November 1951
Primary view of 568 Report
Pollard, Ernest C. (Ernest Charles), 1906-1997
1960
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 1
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 2
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 3
General Electric Company
February 14, 1964
Primary view of 1024 Channel Time-of-Flight Analyzer for MTR Fast Chopper - Operating Manual
Petree, F. L.
March 11, 1959
Primary view of 1950 Plans of the Academy of Sciences USSR
The General Assembly of the Academy of Sciences USSR
unknown creation date
Primary view of 1A Reactor Inlet Hydraulic Valve Position Detector Temperature. Section I. Core I, Seed 1. Test Results DL-S-258-S, RNI-3
unknown creator
November 20, 1959
Primary view of 6144-Channel Time-of-Flight Analyzer
Walker, R. A. & Russell, J. T.
September 1964
Primary view of 770MWe Central Station Power Plants Investment Cost Study: Volume 5, High Temperature Gas-Cooled Reactor Plant
United Engineers & Constructors, inc.
December 1973
Back to Top of Screen