Search Results

Primary view of Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1964
Aerojet-General Corporation
November 13, 1964
Primary view of Full Power and Limited Endurance Test of the ML-1 Nuclear Power Plant (ANSOP 16625A)
Aerojet-General Corporation
September 1964
Primary view of Solidification of High-Level Radioactive Fuel Reprocessing Wastes by Spray and Pot Calcination: Hot-Cell Pilot Plant Studies
Allemann, R. T.; Roberts, F. P. & Upson, U. L.
September 1964
Primary view of X-Ray Fluorescence Tables: Program Description
Amsbury, W. P.; Lee, W. W.; Rowan, J. H. & Walden, G. E.
July 20, 1964
Primary view of Analysis of Stresses in Bellows
Anderson, W. F.
October 15, 1964
Primary view of Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 3: July-December 1963
Auleta, J. J.
July 15, 1964
Primary view of Criticality-Accident Dosimetry Studies
Bailey, J. C.
October 15, 1964
Primary view of Evaluation of Coolant Impurity Removal Equipment at the OMRE
Barbour, P. & Davis, W. W.
October 15, 1964
Primary view of Gas-Cooled Fast Reactor Concepts: a Study
Bender, M.; Carlsmith, R. S.; Delene, J. G.; Gall, W. R.; Goldman, A. E.; Holcomb, R. S. et al.
September 1964
Primary view of Analog Computer Simulation of a Pulsed Extraction Column
Benham, R. D. & Wilburn, N. P.
September 1964
Primary view of The High Flux Isotope Reactor: Volume 1, A Functional Description
Binford, F. T. & Cramer, E. N.
May 1964
Primary view of The High Flux Isotope Reactor: Volume 2, Selected Construction Drawings
Binford, F. T.; Cramer, E. N. & Cramer, E. N.
August 1964
Primary view of QUICKIE: A Computer Program for Spatially Independent Multigroup Slowing-Down and Thermalization Calculations
Boling, M. & Rhoades, W.
April 15, 1964
Primary view of SNAP 10A Structural Analysis
Boulanger, J. R.
July 15, 1964
Primary view of Evaporation of Iron-, Nickel-, and Cobalt-Base Alloys at 760 to 980°C in High Vacuums
Bourgette, D. T.
November 1964
Primary view of Zirconium Processing Capability of the Idaho Chemical Processing Plant
Bower, J. R.
October 1964
Primary view of Molten-Salt Reactor Program Semiannual Progress Report for Period Ending July 31, 1964
Briggs, R. B.
November 1964
Primary view of Geophysical Seismic Evaluation Study at Hanford
Brown, Ruth E. & Raymond, John R.
December 1964
Primary view of In-Pile Test of Prototype ML-1 Fuel Elements
Brunhouse, J. S.; Burgess, A. B.; Geering, G. T.; Nakazato, S. & Titus, G. W.
June 1964
Primary view of Construction Completion Report: CAI-816, 100-N Reactor Plant
Buckner, C. L.
October 15, 1964
Primary view of A Nuclear Reactor System for Generating Power and Supplying Steam to a Water Desalination Plant in the Florida Keys
Burns and Roe
March 1964
Primary view of SNAP 2: Structural and Dynamic Analysis
Castle, R. A.
May 1, 1964
Primary view of A Study of Desalting Plants (15 to 150 mgd) and Nuclear Power Plants (200 to 1500 MWt) for Combined Water and Power Production: Final Report
Catalytic Construction Company
September 1964
Primary view of Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 4: January-June 1964
Cole, H. S.; Hausknecht, D. F.; Jenkins, O. G., Jr.; Lew, D. E.; Mandel, H.; Pearson, E. N. et al.
December 15, 1964
Back to Top of Screen