Search Results

Primary view of Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963
Aerojet-General Corporation
November 15, 1963
Primary view of Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963
Aerojet-General Corporation
November 15, 1963
Primary view of An Evaluation of the Substitution of Zircaloy for Stainless Steel in n.s. Savannah Fuel-Element Containers. Summary Report
Anderson, T. D.; Gross, E. E.; McCurdy, H. C.; Schaffer, L. D.; Shobe, L. R. & Whitmarsh, C. L.
November 1, 1963
Primary view of Piqua Nuclear Power Facility Operations Analysis Program Progress Report Number 2: 1963
Auleta, J. J.
November 30, 1963
Primary view of Energy Deposition by Fast Neutrons. [Part] II, Yield of the Fricke Dosimeter at 14.6 Mev
Axtmann, Robert C. & Licari, Joseph A.
November 1963
Primary view of Nuclear Analysis of PM Long Life Core 3
Bagley, Raymond. & George, Critz.
November 1963
Primary view of The Crosscorrelation Method of Measuring System Dynamic Response
Balcomb, J. D.
November 1, 1963
Primary view of Fabrication process test evaluation: Shipping, HI-74-SL
Barber, A. E.
November 8, 1963
Primary view of Effect of Eddy Diffusion on Temperatures in a Fixed Bed, Particulate-Fueled Nuclear Reactor
Barker, James J. & Benenati, Robert F.
November 1963
Primary view of Lens Opacification in Mice Exposed to Monoenergetic Fast Neutrons
Bateman, J. L.; Bond, V. P. & Rossi, H. H.
November 19, 1963
Primary view of Effect of Fluoride Ions on the Aqueous Corrosion of Zirconium Alloys
Berry, Warren E., 1922-
November 1963
Primary view of Esada Fuel Fabrication Development Program. Terminal Report. Volume 5. Process Analysis--Chemical, Metallographic, and Statistical. Part I. Chemical and Metallographic Analyses. Part Ii. Ststistical Analyses
Bingham, C. D.; Harlow, R. A.; Zonder, A.; Anderson, R. H.; Hicks, L. D. & Glass, D.N.
November 30, 1963
Primary view of Development status and incentives for the hot die sizing process
Blanton, W. A.
November 20, 1963
Primary view of Outline of the Geology of the U12i and the U12i.01 Tunnels and Lithology of the U12i.01 Drill Hole, Nevada Test Site
Bowers, W. E.
November 1963
Primary view of Outline of the geology of the U12i and U12i.01 tunnels and lithology of the U12i.01 drill hole, Nevada test site
Bowers, William E.
November 1963
Primary view of Support block and tie rod interaction flow tests with transparent plexiglas model
Burghardt, R.R.
November 11, 1963
Primary view of Feasibility of a Liquid Phase Chemonuclear Ozone Process
Cagnetta, J. P.; Goellner, D. & Steinberg, M.
November 19, 1963
Primary view of Selection of material, number and distribution of poison wires for the anticriticality poison system
Call, D.W. & Parker, G.E.
November 19, 1963
Primary view of Development of Fueled Graphite Containing Pyrolytic-Carbon Coated Carbide Particles for Nonpurged, Gas-Cooled Reactor Systems
Carlsen, F. L., Jr.; Bomar, E. S. & Harms, W. O.
November 1963
Primary view of Esada Fuel Fabrication Development Program. Terminal Report. Volume 2. UC Melt Stock--Development and Production
Carroll, J. W.
November 30, 1963
Primary view of Analysis of E-N target conversion data
Carter, R. D.
November 21, 1963
Primary view of A Sensitive Radiation Monitor for a Large Laboratory Area
Cathey, L. & Moyer, R. A.
November 1, 1963
Primary view of Feed system performance, NE8010E
Cemi, S.
November 14, 1963
Primary view of The Nuclear Reactor Comes of Age
Chernick, J.
November 13, 1963
Back to Top of Screen