Search Results

Primary view of D-0 End Calorimeter Warm Tube/TeV Dry Air Purge
Leibfritz, J. R.
August 14, 1991
Primary view of D-0 North End Cap Calorimeter Cold Test Results
Michael, J.
August 2, 1990
Primary view of A 1-kW power demonstration from the advanced free electron laser
Sheffield, R. L.; Conner, C. A. & Fortgang, C. M.
August 1997
Primary view of 1: Mass asymmetric fission barriers for {sup 98}Mo; 2: Synthesis and characterization of actinide-specific chelating agents
Veeck, A. C.
August 1, 1996
Primary view of 2 Hz, 30 T Split Pulse Water Cooled Magnet for Neutron Scattering Experiments (Materials Characterization and Design Options)
Eyssa, Y. M.; Walsh, R. P.; Miller, J. R.; Miller, G. E.; Pernambuco-Wise, P.; Bird, M. D. et al.
August 26, 1997
Primary view of 3-D Characterization of the Structure of Paper and Paperboard and Their Application to Optimize Drying and Water Removal Processes and End-Use Applications
Shri Ramaswamy, University of Minnesota & B.V. Ramarao, State University of New York
August 29, 2004
Primary view of 4-D High-Resolution Seismic Reflection Monitoring of Miscible CO2 Injected into a Carbonate Reservoir
Miller, Richard D.; Raef, Abdelmoneam E.; Byrnes, Alan P. & Harrison, William E.
August 31, 2006
Primary view of THE (5-PHENYL-2-OXAZOLYL)PYRIDINES AS FLUORESCENT pH INDICATORS. AN APPLICATION TO CHEMICAL RADIATION DOSIMETRY
Ott, Donald G.
August 1, 1958
Primary view of 6-D weak-strong beam-beam simulation study of proton lifetime in presence of head-on beam-beam compensation in the RHIC
Luo, Y. & Fischer, W.
August 1, 2010
Primary view of The 6-Foot-4-Inch Wind Tunnel at the Washington Navy Yard
Desmond, G. L. & McCrary, J. A.
August 1935
Primary view of 9/11 and Terrorist Travel: Staff Report of the National Commission on Terrorist Attacks Upon the United States
Eldridge, Thomas R.; Ginsburg, Susan; Hempel, Walter T., II; Kephart, Janice L. & Moore, Kelly
August 21, 2004
Primary view of 9/11 Commission Recommendations: A Civil Liberties Oversight Board
Relyea, Harold C.
August 9, 2004
Primary view of 9/11 Commission Recommendations: Joint Committee on Atomic Energy - A Model for Congressional Oversight?
Davis, Christopher M.
August 20, 2004
Primary view of 9-Zoom : A One-Dimensional, Multigroup, Neutron Diffusion Theory Reactor Code for the IBM 709
Stone, S. P.; Collins, E. T. & Lenihan, S. R.
August 25, 1959
Primary view of 10 kW SOFC POWER SYSTEM COMMERCIALIZATION
Norrick, Dan; Palmer, Brad; Romine, Todd; Vesely, Charles; Barringer, Eric; DeBellis, Cris et al.
August 1, 2003
Primary view of 10-Megawatt Aqueous Homogeneous Circulating Solution Reactor for Producing Electrical Power in Remote Locations
Montgomery, D. W.; Dodson, W. J.; Kaiser, F. F.; Luckow, W. K. & Pashos, T. J.
August 1, 1953
Primary view of 10-MWe pilot-plant-receiver panel test requirements document solar thermal test facility
unknown creator
August 25, 1978
Primary view of 10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual
unknown creator
August 1, 1979
Primary view of 10-MWe solar-thermal central-receiver pilot plant. Phase II. Planning
unknown creator
August 1, 1979
Primary view of S-11 and S-20 photocathode research activity. Rev. 1
Gex, F.; Huen, T. & Kalibjian, R.
August 27, 1984
Primary view of The 12-GeV/c beam transfer and absorber lines for the Superconducting Super Collider
Mao, N.; McGill, J.; Gerig, R. & Brown, K.
August 1994
Primary view of 12" SODIUM FLOW CONTROLLER. PERMANENT MAGNET COUPLING. MAGNETIC CALCULATION MANUFACTURE AND TEST RESULTS
Flator, H.E.
August 18, 1961
Primary view of 13-Watt Curium-Fueled Thermoelectric Generator for Hard Lunar Impact Mission. Final Report-Subtask 5.8
Bloom, J. L.
August 1, 1960
Primary view of 20-ton and 1/2-ton High Explosive Cratering Experiments in Basalt Rock: Final Report, August 1962
Vortman, L. J.; MacDougall, H. R. & Rauber, D. F.
August 1962
Back to Top of Screen