19,231 Matching Results

Search Results

D-0 End Calorimeter Warm Tube/TeV Dry Air Purge, 1991, August 14

Description: This Engineering Note studies the design of the Dry Air Purge that is going to flow through the Warm Tube of the End Calorimeter of the D-O Calorimeter. The Tev tubes through the E.C. can be thought of as a cluster of concentric tubes: The Tev tube, the warm (vacuum vessel) tube, 15 layers of superinsulation, the cold (argon vessel) tube, and the Inner Hadronic center support tube. The Dry Air Purge will involve flowing Dry Air through the annular region between the Warm Tube and the Tev Beam Pipe. This air flow is intended to prevent condensation from forming in this region which could turn to ice under cryogenic temperatures. Any ice formed in this gap, could cause serious problems when these tubes are moved. The Air will flow through a Nylon Tube Fitting -1/4-inch I.D. to 1/8-inch male pipe thread (Cole Palmer YB-06465-15) see Drawing MC-295221 (Appendix A). This fitting will be attached to the Nylon 2-inch Tube-Wiper and Seal Assembly which is clamped to the ends of the Warm Tube (Appendix A). This note includes drawings and calculations that explain the setup of the Dry Air Purge and give the required information on the pressure drops through the setup. The Equations and properties used in the calculations were obtained from the Applied Fluid Dynamics Handbook by Robert D. Blevins and Fluid Dynamics Second Edition by Frank M. White.
Date: August 14, 1991
Creator: Leibfritz, J. R.
Partner: UNT Libraries Government Documents Department

D-0 North End Cap Calorimeter Cold Test Results, 1990, August 2

Description: The North endcap calorimeter vessel was recieved on July 1, 1990. A cooldown of the pressure vessel with liquid nitrogen was performed on July 10-11 to check the vessel's integrity. With the pressure vessel cold, the insulating vacuum was monitored for leaks. Through out the testing, the insulating vacuum remained good and the vessel passed the test. The cold test was carried out per the procedures of D-Zero engineering note 3740.220-EN-250. The test was very similar to the cold test performed on the Central Calorimeter in October of 1987. Reference D-Zero engineering notes 3740.210-EN-122, 3740.000-EN107, and 3740.210-EN-110 for information about the CC cold test. The insulating vacuum space was pumped on while equipment was being connected to the pressure vessel. Two hours after starting to pump with the blower the vacuum space pressure was at about 210 microns. Pumping on the vacuum space for the next 15 hours showed no progress and a leak detector was connected to the pumping line. A leak check showed a leak in a thermocouple feedthru on the vacuum space relief plate. After fixing the leak, the pressure dropped to 16 microns in less than one hour. A rate of rise test was performed starting at a pressure of 13 microns. The pressure rose to 39 microns within 8 minutes and then only rose to 43 microns in 2.5 hours (1.6 microns/hour). After all connections were made to the pressure vessel, a vacuum pump with an estimated effective pumping speed of about 70 scfm was valved on. The lowest pressure achieved after 2 days of pumping was 80 microns. Valving out the pump for 30 minutes resulted in a 5 micron per minute rate of rise. The rate of rise was considered acceptable since there were known leak paths through the bolts of the signal ...
Date: August 2, 1990
Creator: Michael, J.
Partner: UNT Libraries Government Documents Department

A 1-kW power demonstration from the advanced free electron laser

Description: This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The main objective of this project was to engineer and procure an electron beamline compatible with the operation of a 1-kW free-electron laser (FEL). Another major task is the physics design of the electron beam line from the end of the wiggler to the electron beam dump. This task is especially difficult because electron beam is expected to have 20 kW of average power and to simultaneously have a 25% energy spread. The project goals were accomplished. The high-power electron design was completed. All of the hardware necessary for high-power operation was designed and procured.
Date: August 1997
Creator: Sheffield, R. L.; Conner, C. A. & Fortgang, C. M.
Partner: UNT Libraries Government Documents Department

1: Mass asymmetric fission barriers for {sup 98}Mo; 2: Synthesis and characterization of actinide-specific chelating agents

Description: Excitation functions have been measured for complex fragment emission from the compound nucleus {sup 98}Mo, produced by the reaction of {sup 86}Kr with {sup 12}C. Mass asymmetric fission barriers have been obtained by fitting the excitation functions with a transition state formalism. The extracted barriers are {approximately} 5.7 MeV higher, on average, than the calculations of the Rotating Finite Range Model (RFRM). These data clearly show an isospin dependence of the conditional barriers when compared with the extracted barriers from {sup 90}Mo and {sup 94}Mo. Eleven different liquid/liquid extractants were synthesized based upon the chelating moieties 3,2-HOPO and 3,4-HOPO; additionally, two liquid/liquid extractants based upon the 1,2-HOPO chelating moiety were obtained for extraction studies. The Pu(IV) extractions, quite surprisingly, yielded results that were very different from the Fe(III) extractions. The first trend remained the same: the 1,2-HOPOs were the best extractants, followed closely by the 3,2-HOPOs, followed by the 3,4-HOPOs; but in these Pu(IV) extractions the 3,4-HOPOs performed much better than in the Fe(III) extractions. 129 refs.
Date: August 1, 1996
Creator: Veeck, A. C.
Partner: UNT Libraries Government Documents Department

3-D Characterization of the Structure of Paper and Paperboard and Their Application to Optimize Drying and Water Removal Processes and End-Use Applications

Description: The three dimensional structure of paper materials plays a critical role in the paper manufacturing process especially via its impact on the transport properties for fluids. Dewatering of the wet web, pressing and drying will benefit from knowledge of the relationships between the web structure and its transport coefficients. The structure of the pore space within a paper sheet is imaged in serial sections using x-ray micro computed tomography. The three dimensional structure is reconstructed from these sections using digital image processing techniques. The structure is then analyzed by measuring traditional descriptors for the pore space such as specific surface area and porosity. A sequence of microtomographs was imaged at approximately 2 m intervals and the three-dimensional pore-fiber structure was reconstructed. The pore size distributions for both in-plane as well as transverse pores were measured. Significant differences in the in-plane (XY) and the transverse directions in pore characteristics are found and may help partly explain the different liquid and vapor transport properties in the in-plane and transverse directions. Results with varying sheet structures compare favorably with conventional mercury intrusion porosimetry data. Interestingly, the transverse pore structure appears to be more open with larger pore size distribution compared to the in plane pore structure. This may help explain the differences in liquid and vapor transport through the in plane and transverse structures during the paper manufacturing process and during end-use application. Comparison of Z-directional structural details of hand sheet and commercially made fine paper samples show a distinct difference in pore size distribution both in the in-plane and transverse direction. Method presented here may provide a useful tool to the papermaker to truly engineer the structure of paper and board tailored to specific end-use applications. The difference in surface structure between the top and bottom sides of the porous material, i.e. ...
Date: August 29, 2004
Creator: Shri Ramaswamy, University of Minnesota & B.V. Ramarao, State University of New York
Partner: UNT Libraries Government Documents Department

4-D High-Resolution Seismic Reflection Monitoring of Miscible CO2 Injected into a Carbonate Reservoir

Description: The objective of this research project is to acquire, process, and interpret multiple high-resolution 3-D compressional wave and 2-D, 2-C shear wave seismic data in an attempt to observe changes in fluid characteristics in an oil field before, during, and after the miscible carbon dioxide (CO{sub 2}) flood that began around December 1, 2003, as part of the DOE-sponsored Class Revisit Project (DOE DE-AC26-00BC15124). Unique and key to this imaging activity is the high-resolution nature of the seismic data, minimal deployment design, and the temporal sampling throughout the flood. The 900-m-deep test reservoir is located in central Kansas oomoldic limestones of the Lansing-Kansas City Group, deposited on a shallow marine shelf in Pennsylvanian time. After 30 months of seismic monitoring, one baseline and eight monitor surveys clearly detected changes that appear consistent with movement of CO{sub 2} as modeled with fluid simulators and observed in production data.
Date: August 31, 2006
Creator: Miller, Richard D.; Raef, Abdelmoneam E.; Byrnes, Alan P. & Harrison, William E.
Partner: UNT Libraries Government Documents Department

THE (5-PHENYL-2-OXAZOLYL)PYRIDINES AS FLUORESCENT pH INDICATORS. AN APPLICATION TO CHEMICAL RADIATION DOSIMETRY

Description: The three isomeric (5-phenyl-2-oxazolyl)pyridines have been shown to be sensitive fluorescent pH indicators which show a pronounced change to increased visible fluorescence as the pH is lowered. Absorption and fluorescence spectral data and pK values are given. Selective excitation of fluorescence from the conjugate acid in the presence of the free base was found possible. The sensitivity of the 4-isomer was demonstrated to be adequate for determining the small amounts of acid produced in certain chemical dosimeter systems. (auth)
Date: August 1, 1958
Creator: Ott, D.G.
Partner: UNT Libraries Government Documents Department

6-D weak-strong beam-beam simulation study of proton lifetime in presence of head-on beam-beam compensation in the RHIC

Description: In this note we summarize the calculated particle loss of a proton bunch in the presence of head-on beam-beam compensation in the Relativistic Heavy Ion Collider (RHIC). To compensate the head-on beam-beam effect in the RHIC 250 GeV polarized proton run, we are introducing a DC electron beam with the same transverse profile as the proton beam to collide with the proton beam. Such a device is called an electron lens (e-lens). In this note we first present the optics and beam parameters and the tracking setup. Then we calculate and compare the particle loss of a proton bunch with head-on beam-beam compensation, phase advance of k{pi} between IP8 and the center of the e-lens and second order chromaticity correction. We scanned the proton beam's linear chromaticity, working point and bunch intensity. We also scanned the electron beam's intensity, transverse beam size. The effect of the electron-proton transverse offset in the e-lens was studied. In the study 6-D weak-strong beam-beam interaction model a la Hirata is used for proton collisions at IP6 and IP8. The e-lens is modeled as 8 slices. Each slice is modeled with as drift - (4D beam-beam kick) - drift.
Date: August 1, 2010
Creator: Luo, Y. & Fischer, W.
Partner: UNT Libraries Government Documents Department

The 6-Foot-4-Inch Wind Tunnel at the Washington Navy Yard

Description: Report discussing the 6-foot-4-inch wind tunnel and its auxiliary equipment has proven itself capable of continuous and reliable output of data. The real value of the tunnel will increase as experience is gained in checking the observed tunnel performance against full-scale performance. Such has been the case of the 8- by 8-foot tunnel, and for that reason the comparison in the calibration tests have been presented.
Date: August 1935
Creator: Desmond, G. L. & McCrary, J. A.
Partner: UNT Libraries Government Documents Department

9/11 and Terrorist Travel: Staff Report of the National Commission on Terrorist Attacks Upon the United States

Description: Report of the National Commission on Terrorist Attacks Upon the United States (9-11 Commission) describing research into the events of September 11, 2001. It contains the Commission's findings based on the thousands of documents and hundreds of interviews collected during the course of the investigations.
Date: August 21, 2004
Creator: Eldridge, Thomas R.; Ginsburg, Susan; Hempel, Walter T., II; Kephart, Janice L. & Moore, Kelly
Partner: UNT Libraries Government Documents Department

9/11 Commission Recommendations: A Civil Liberties Oversight Board

Description: Among the recommendations made by the National Commission on Terrorist Attacks Upon the United States (9/11 Commission) in its final report is the creation of a board within the executive branch to oversee adherence to guidelines on, and the commitment to defend, civil liberties by the federal government. This report examines this recommendation and its implications, and will be updated as events warrant.
Date: August 9, 2004
Creator: Relyea, Harold C.
Partner: UNT Libraries Government Documents Department

9/11 Commission Recommendations: Joint Committee on Atomic Energy - A Model for Congressional Oversight?

Description: This report focuses on that portion of the 9/11 Commission recommendation that urges Congress to consider the model of the Joint Committee on Atomic Energy (JCAE). It provides an outline of the history, structure, and powers of the JCAE and analyzes a number of issues that might be considered by policymakers as they weigh the suitability of the JCAE as a possible model when crafting congressional oversight mechanisms for intelligence.
Date: August 20, 2004
Creator: Davis, Christopher M.
Partner: UNT Libraries Government Documents Department

9-Zoom : A One-Dimensional, Multigroup, Neutron Diffusion Theory Reactor Code for the IBM 709

Description: The following document describes the usage and purpose of the neutron diffusion theory reactor program 9-Zoom, a memory-contained program that takes advantage of 709 features such as, for example, preferential order of multiply by zero, and for small problems approaches input-output limitations with excellent convergence properties.
Date: August 25, 1959
Creator: Stone, S. P.; Collins, E. T. & Lenihan, S. R.
Partner: UNT Libraries Government Documents Department

10 kW SOFC POWER SYSTEM COMMERCIALIZATION

Description: The program is organized into three developmental periods. In Phase 1 the team will develop and demonstrate a proof-of-concept prototype design and develop a manufacturing plan to substantiate potential producibility at a target cost level of $800/kW factory manufacturing cost. Phase 2 will further develop the design and reduce the manufacturing cost to a level of $600 kW. Depending on an assessment of the maturity of the technology at the end of Phase 1, Phase 2 may be structured and supplemented to provide a limited production capability. Finally, in Phase 3, a full Value Package Introduction (VPI) Program will be integrated into the SECA program to develop a mass-producible design at a factory cost of $400/kW with full cross-functional support for unrestricted commercial sales. The path to market for new technology products in the Cummins system involves two processes. The first is called Product Preceding Technology, or PPT. The PPT process provides a methodology for exploring potentially attractive technologies and developing them to the point that they can be reliably scheduled into a new product development program with a manageable risk to the product introduction schedule or product quality. Once a technology has passed the PPT gate, it is available to be incorporated into a Value Package Introduction (VPI) Program. VPI is the process that coordinates the cross-functional development of a fully supported product. The VPI Program is designed to synchronize efforts in engineering, supply, manufacturing, marketing, finance, and product support areas in such a way that the product, when introduced to the market, represents the maximum value to the customer.
Date: August 1, 2003
Creator: Norrick, Dan; Palmer, Brad; Romine, Todd; Vesely, Charles; Barringer, Eric; DeBellis, Cris et al.
Partner: UNT Libraries Government Documents Department

10-MWe pilot-plant-receiver panel test requirements document solar thermal test facility

Description: Testing plans for a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally, the design planned for the Barstow Solar Pilot Plant are presented. Testing is to include operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the panel's transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. Test hardware are described, including the pilot plant receiver, the test receiver assembly, receiver panel, flow control, electrical control and instrumentation, and structural assembly. Requirements for the Solar Thermal Test Facility for the tests are given. The safety of the system is briefly discussed, and procedures are described for assembly, installation, checkout, normal and abnormal operations, maintenance, removal and disposition. Also briefly discussed are quality assurance, contract responsibilities, and test documentation. (LEW)
Date: August 25, 1978
Partner: UNT Libraries Government Documents Department

10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual

Description: Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repair description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)
Date: August 1, 1979
Partner: UNT Libraries Government Documents Department

10-MWe solar-thermal central-receiver pilot plant. Phase II. Planning

Description: The various considerations related to the Phase II schedules, material control and personnel training required to effectively implement the program are presented. The flow charts and schedules required to accomplish fabrication, installation, checkout, and personnel training to support the Pilot Plant schedule are identified. The planning addresses receiving, storage and shipment of raw materials, subassemblies, component, subsystems, and complete assemblies. The vendor activities and the major Martin Marietta facilities are included. These are the Mirror Assembly activities at Pueblo, Colorado and the heliostat assembly and installation activities at the Barstow-Daggett Airport and the solar plant. (LEW)
Date: August 1, 1979
Partner: UNT Libraries Government Documents Department

S-11 and S-20 photocathode research activity. Rev. 1

Description: The S-1 semi-transparent photocathode is the only one that can be used to study the 1.06 ..mu..m neodynium laser pulses of less than 10 ps duration. We first reviewed the recent results obtained at the Paris Observatory (research sponsored by the CEA), and then we tried to determine the role of the main constituents and their contributions in photoemission.
Date: August 27, 1984
Creator: Gex, F.; Huen, T. & Kalibjian, R.
Partner: UNT Libraries Government Documents Department

The 12-GeV/c beam transfer and absorber lines for the Superconducting Super Collider

Description: The beam optics of the 12-GeV/c proton beam transfer line between the Low Energy Booster (LEB) and the Medium Energy Booster (MEB) at the Superconducting Super Collider is presented. The beam is extracted from the LEB vertically and is injected into the MEB through a vertical Lambertson magnet and a horizontal kicker. The beamline has high flexibility for amplitude and dispersion function matching. Effects of various errors in the transfer line are studied, and a beam position correction scheme is proposed. The beam optics of the 12-GeV/c absorber line transporting the beam from the LEB to an absorber during the LEB commissioning is also presented.
Date: August 1, 1994
Creator: Mao, N.; McGill, J.; Gerig, R. & Brown, K.
Partner: UNT Libraries Government Documents Department

12" SODIUM FLOW CONTROLLER. PERMANENT MAGNET COUPLING. MAGNETIC CALCULATION MANUFACTURE AND TEST RESULTS

Description: In order to retain the hermetic feature of the sodium flow controller, magnetic flux linkage of a permanent magnet coupling is used to transmit the torque produced by the operator through the pressure wall. Magnetic calculations, manufacture, and testing of this magnet coupling are described. (M.C.G.)
Date: August 18, 1961
Creator: Flator, H.E.
Partner: UNT Libraries Government Documents Department

13-Watt Curium-Fueled Thermoelectric Generator for Hard Lunar Impact Mission. Final Report-Subtask 5.8

Description: Results of a conceptual design study for a curium powered thermoelectric generator of minimum size and weight which is capable of sustaining hard impact is presented. The generator produces a minimum of 13 watts of d-c power at 3 volts, and weighs 6.2 pounds excluding shielding. (J.R.D.)
Date: August 1, 1960
Creator: Bloom, J. L.
Partner: UNT Libraries Government Documents Department