Search Results

Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960
Aerojet-General Corporation
July 31, 1960
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960
Aerojet-General Corporation
July 31, 1960
Primary view of Radiation Synthesis Involving Halogenated Compounds : Progress Report No. 2 (Covering the Period From May 1, 1960 to July 31, 1960)
Schmude, K. E. & Feng, P. Y.
July 31, 1960
Primary view of EXPERIMENTAL INVESTIGATION OF THE EFFECTS OF ULTRASONIC VIBRATION ON BURNOUT HEAT FLUX WITH BOILING WATER. Final Summary Report, October 3, 1960-July 31, 1961
Romie, F.E. & Aronson, C.A.
July 31, 1961
Primary view of Hydrologic test program, Tatum salt dome Lamar County, Mississippi. Technical letter: Dribble-3. [Data needs and acquisition plans]
unknown creator
July 31, 1961
Primary view of Investigations of Radioactive Fuel-Bearing Glasses
Lockwood, P. A.
July 31, 1961
Primary view of Results of Some Laboratory Water Vapor Corrosion Tests of Beo. Period Covered: January 1961-April 1961
Salyards, D. G.
July 31, 1961
Primary view of Fuel Cycles and Loading Programming for Water-Cooled Research Reactors
Colomb, A. L. & Cavin, D.
July 31, 1962
Primary view of Irradiation performance of an NIN-1 fuel element in the Engineering Test Reactor, GEH-10-43, (RM-596). Final report
Call, R. L.
July 31, 1962
Primary view of Large Bridgman - type unit for preparing large and small diameter single crystals
Slonaker, Jr., Robert E. & Smutz, Morton
July 31, 1962
Primary view of Mound Laboratory Progress Report, July 1962
Grove, G. R.; Jones, L. V. & Eichelberger, J. F.
July 31, 1962
Primary view of PERSONNEL-EXPOSURE AND CONTAMINATION CONTROL IN THE ROUTINE OPERATION OF THE ORNL RESEARCH REACTORS
Sims, T.M.
July 31, 1962
Primary view of Research Studies on Analysis of Ionized Gases. Final Report
Snow, W. R.
July 31, 1962
Primary view of Appendix H: Tritium production capability. Draft
unknown creator
July 31, 1963
Primary view of Equipment for Hardness Testing at Elevated Temperatures
Hallerman, G. & Gray, R.J.
July 31, 1963
Primary view of Experimental Beryllium Oxide Reactor Program. Quarterly Progress Report for the Period Ending June 30, 1963
unknown creator
July 31, 1963
Primary view of Fireball yield from fractional intensity diameters
Gellert, E. R.
July 31, 1963
Primary view of Maritime Gas-Cooled Reactor Program, Quarterly Progress Report: April-June 1961
unknown creator
July 31, 1963
Primary view of A Method of Continuous Shock Front Position Measurement
Heusinkveld, M. & Holzer, F.
July 31, 1963
Primary view of Pressure Pulses in Rapid Transient Boiling
Wright, R. W.
July 31, 1963
Primary view of Report of the Qualification Testing of Snap 10a Fusistors
Holtwick, J. S., III & Nowell, V. P.
July 31, 1963
Primary view of Acoustic Noise Tests of Accelerometers and Amplifiers
Loftus, W. D.
July 31, 1964
Primary view of Effect of orbital destruct of nuclear rockets on earth contamination
Hargrove, H.G. & Trammell, M.R.
July 31, 1964
Primary view of Epoxy Foams Resistant to High Temperatures
Brown, L. E. & Harshman, J. B., Jr.
July 31, 1964
Back to Top of Screen