Search Results

Primary view of Investigations of Radioactive Fuel-Bearing Glasses
Lockwood, P. A.
July 31, 1961
Primary view of Pressure Pulses in Rapid Transient Boiling
Wright, R. W.
July 31, 1963
Primary view of Temperature Dependence of the Ferromagnetic Resonance Linewidth
Leichner, Peter K.
July 31, 1969
Primary view of Large Bridgman - type unit for preparing large and small diameter single crystals
Slonaker, Jr., Robert E. & Smutz, Morton
July 31, 1962
Primary view of Irradiation performance of an NIN-1 fuel element in the Engineering Test Reactor, GEH-10-43, (RM-596). Final report
Call, R. L.
July 31, 1962
Primary view of N-Reactor shutdown for fuel rupture indications - tube 3361
Renberger, D. L.
July 31, 1964
Primary view of Monthly record report, Research and Engineering Operation N-Reactor Department
Leverett, M. C.
July 31, 1965
Primary view of Appendix H: Tritium production capability. Draft
unknown creator
July 31, 1963
Primary view of TISR-288 data
DeMers, A. E.
July 31, 1967
Primary view of An evaluation of simple iron-water radiation shields and radiation measurements within concrete-lined and -capped pits
Muckenthaler, F. J.; Jung, L.; Blosser, T. V.; Freestone, R. M. Jr. & Miller, J. M.
July 31, 1964
Primary view of Hydrologic test program, Tatum salt dome Lamar County, Mississippi. Technical letter: Dribble-3. [Data needs and acquisition plans]
unknown creator
July 31, 1961
Primary view of Radiation Synthesis Involving Halogenated Compounds : Progress Report No. 2 (Covering the Period From May 1, 1960 to July 31, 1960)
Schmude, K. E. & Feng, P. Y.
July 31, 1960
Primary view of EXPERIMENTAL INVESTIGATION OF THE EFFECTS OF ULTRASONIC VIBRATION ON BURNOUT HEAT FLUX WITH BOILING WATER. Final Summary Report, October 3, 1960-July 31, 1961
Romie, F.E. & Aronson, C.A.
July 31, 1961
Primary view of Fuel Cycles and Loading Programming for Water-Cooled Research Reactors
Colomb, A. L. & Cavin, D.
July 31, 1962
Primary view of PERSONNEL-EXPOSURE AND CONTAMINATION CONTROL IN THE ROUTINE OPERATION OF THE ORNL RESEARCH REACTORS
Sims, T.M.
July 31, 1962
Primary view of SNAP-23A PROGRAM, PHASE 1. THERMOELECTRIC CONVERTER DEVELOPMENT PROGRAM. Quarterly Report No. 10, April 1--June 30, 1969.
unknown creator
July 31, 1969
Primary view of An Operating Transcurium Element Radiochemistry Facility
Coops, M. S.; Scribner, V. E. & Hanson, C. L.
July 31, 1964
Primary view of Research Studies on Analysis of Ionized Gases. Final Report
Snow, W. R.
July 31, 1962
Primary view of Equipment for Hardness Testing at Elevated Temperatures
Hallerman, G. & Gray, R.J.
July 31, 1963
Primary view of Mound Laboratory Progress Report, July 1962
Grove, G. R.; Jones, L. V. & Eichelberger, J. F.
July 31, 1962
Primary view of Acoustic Noise Tests of Accelerometers and Amplifiers
Loftus, W. D.
July 31, 1964
Primary view of Flexure test of thin wall tubing
Brickman, E.L.
July 31, 1967
Primary view of Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960
Aerojet-General Corporation
July 31, 1960
Primary view of Experimental Beryllium Oxide Reactor Program. Quarterly Progress Report for the Period Ending June 30, 1963
unknown creator
July 31, 1963
Back to Top of Screen