Search Results

Primary view of 1 mil gold bond wire study.
Huff, Johnathon; McLean, Michael B.; Jenkins, Mark W. & Rutherford, Brian Milne
May 1, 2013
Primary view of LES 8/9 vibration test on a multihundred watt FSA
Anderson, C.G. & Brewer, C.O.
May 1, 1974
Primary view of 10 CFR 830 Major Modification Determination for Advanced Test Reactor LEU Fuel Conversion
Christensen, Boyd D.; Lehto, Michael A. & Duckwitz, Noel R.
May 1, 2012
Primary view of 10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement
Korns, David E.
May 1, 2012
Primary view of 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement
Duckwitz, Noel
May 1, 2011
Primary view of 10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors
Duckwitz, Noel
May 1, 2011
Primary view of 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement
Duckwtiz, Noel
May 1, 2011
Primary view of 20% Wind Energy - Diversifying Our Energy Portfolio and Addressing Climate Change (Brochure)
unknown creator
May 1, 2008
Primary view of 26 - LMFBR flexible pipe joint development
Anderson, R.V.
May 1, 1978
Primary view of 45-Day safety screen results for Tank 241-B-112, auger samples 95-AUG-014 and 95-AUG-015
Conner, J.M.
May 1, 1995
Primary view of 60-day safety screen results for tank 241-BY-106, rotary mode, cores 64 and 65
Bell, Kevin E.
May 1, 1995
Primary view of 100-NR-2 Apatite Treatability Test: An update on Barrier Performance
Fritz, Brad G.; Vermeul, Vincent R.; Fruchter, Jonathan S.; Szecsody, James E. & Williams, Mark D.
May 1, 2011
Primary view of 100-Watt Curium-242 Fueled Thermoelectric Generator--Conceptual Design. SNAP Subtask 5.7 Final Report
Weddell, J. B. & Bloom, J.
May 1, 1960
Primary view of 324 and 325 Building Hot Cell Cleanout Program: Air lock cover block refurbishment
Katayama, Y.B.; Holton, L.K. Jr. & Gale, R.M.
May 1, 1989
Primary view of 10MW Class Direct Drive HTS Wind Turbine: Cooperative Research and Development Final Report, CRADA Number CRD-08-00312
Musial, W.
May 1, 2011
Primary view of 1170-MW(t) HTGR-PS/C plant application study report: Geismar, Louisiana refinery/chemical complex application
McMain, Jr., A. T. & Stanley, J. D.
May 1, 1981
Primary view of 1170-MW(t) HTGR-PS/C plant application study report: shale oil recovery application
Rao, R. & McMain, A.T. Jr.
May 1, 1981
Primary view of 1170-MW(t) HTGR-PS/C plant application study report: SRC-II process application
Rao, R. & McMain, A. T., Jr.
May 1, 1981
Primary view of 1170-MW(t) HTGR-PS/C plant application study report: tar sands oil recovery application
Rao, R. & McMain, Jr., A. T.
May 1, 1981
Primary view of 1559/RE: A CODE TO COMPUTE RESONANCE INTEGRALS IN MIXTURES
Kelber, C. N.
May 1, 1963
Primary view of 1965 audit of SRP radioactive waste
Ashley, C.
May 1, 1966
Primary view of 1972 environmental monitoring report
Hull, A. P.
May 1, 1973
Primary view of 1982 bibliography of atomic and molecular processes
Barnett, C. F.; Crandall, D. H.; Gilbody, H. B.; Gregory, D. C.; Kirkpatrick, M. I.; McDaniel, E. W. et al.
May 1, 1984
Primary view of 1985 Libby Reservoir Angler Census: May 13-October 31, 1987 [i.e. 1985] : Interim Report.
Chisholm, Ian & Hamlin, Paul
May 1, 1987
Back to Top of Screen