Search Results

Primary view of Specifications for WAPD Loop
Berberet, J. A.
February 16, 1955
Primary view of Automatic In-Line Monitor for pH, Gamma Activity and Uranium in the Metal Recovery Plant
Reas, W. H.; Connally, R. E.; Koyama, K.; Michelson, C. E. & Van Meter, W. P.
February 18, 1955
Primary view of Examination of Irradiated Uranium-Chromium Alloy Slugs
Kratzer, W. K.
February 14, 1955
Primary view of Penetration of Respiratory Protective Equipment by Ruthenium at Building 202-S
Gill, W. E.
February 21, 1955
Primary view of Examination of Zirconium Exposed to 190 MWD/AT
Kelly, W. S.
February 11, 1955
Primary view of The Alpha Half-Life of the Isotope Pu-241
Gift, M. W.
February 15, 1955
Primary view of Examination of Donut on Rupture Slug No. 14
O'Keefe, D. P.
February 19, 1957
Primary view of Elastic Analysis of Stress Conditions in a Reduction Bomb (Task III Replacement Pressure Vessel Model-1302)
Merckx, K. R.
February 19, 1954
Primary view of A comparison of two methods for the spectrochemical analysis of plutonium
Van Tuyl, H. H.
February 1, 1950
Primary view of The Determination of Total Plutonium in the Presence of Aluminum
Burns, R. E. & Barton, G. B.
February 10, 1950
Primary view of Chemical Research Section Progress Report for January 1950
Albaugh, F. W.
February 15, 1950
Primary view of Corrosion of Austenitic Stainless Steel Type 347 in Redox Process Stream : (ORNL #1 Flowsheet)
Koenig, W. W.
February 23, 1950
Primary view of Diameter Measurements of Slugs Before and After Prolonged Heat Treatment
Bennett, Carl A. & Lane, J. J.
February 16, 1948
Primary view of Correlation of Chemical Analyses on Graphite Bars and Test Pile Results
Lane, J. J.
February 5, 1948
Primary view of A Microdetermination of Uranium by Ferric Sulfate Titration
Christopherson, E. W.
February 16, 1949
Primary view of Corrosion Tests on Tantalum, Hastelloy C and Duriron in 234-5 Project Solutions
Work, J. B. & Koenig, W. W.
February 25, 1949
Primary view of The Valve Actuated Pulse Column Design
Burger, L. L. & Clark, L. H.
February 16, 1953
Primary view of Production Test 235-5 Plant Process Evaluation Reduction of Plutonium Tetrafluoride With Calcium and Sulfur
Kerr, W. B.
February 10, 1953
Primary view of The formation of chemical film deposits on aluminum surfaces
Andrews, R. V.
February 1952
Primary view of A Report of Particle Contamination, October-December 1951
Paas, H. J. & Thomas, C. W.
February 15, 1952
Primary view of Process Tube Pressure - Stress Factors
Reinker, P. H.
February 21, 1952
Primary view of Reactivity Effects of Very Inhomogeneous Enriched Loadings
Neumann, H.
February 24, 1953
Primary view of Preliminary Results of the Ratio of PU²³⁹ Fission Cross Section to U²³⁵ Fission Cross Section
Leonard, B. R.
February 20, 1953
Primary view of Hanford Works Analytical Manual for Reactor Process Water
Hanford Works
February 13, 1953
Back to Top of Screen