This system will be undergoing maintenance July 25th between 9:00AM and 12:00PM CDT.

Search Results

Primary view of The Design of a Mediumenergy Pion Beam (4-16 Gev/C) for the Brookhaven A. G. S.
Read, A. L. & Rubinstein, R.
January 1, 0196
Primary view of Two-Phase Flow Through Apertures
Isbin, H. S.
January 1, 0196
Primary view of Vapor pressure of various compounds at low temperatures
Burrell, G. A. & Robertson, I. W.
January 1, 1916
Primary view of Methods of shutting off water in oil and gas wells
Tough, F. B.
January 1, 1918
Primary view of CORROSION OF THORIUM AND RELATED MATERIALS
Feibig, J. G.
January 1, 1940
Primary view of THE RECOVERY OF URANIUM FROM BYPRODUCT SCRAP MATERIALS
Spiegler, L.
January 1, 1940
Primary view of The Precipitation of Uranium Peroxide in the Presence of Fluorides
King, Edward J.
January 1, 1941
Primary view of The Production of Uranium Metal by Metal Hydrides Incorporated
Alexander, P. P.
January 1, 1943
Primary view of Retention basins---Building 107, 100 Areas
Lauder, D. H. & Gross, C. N.
January 23, 1943
Primary view of Quality of Columbia River water
Acken, M. F.
January 27, 1943
Primary view of Tolerance concentration of radioactive gases in air
Failla, G.
January 1, 1944
Primary view of Turbidity Flocculation in Columbia River Water
Frank, R. D. & Conley, W. R.
January 9, 1944
Primary view of Casting Uranium Bars as a Substitute for the Extrusion Process
Lindlief, W. Earl
January 1, 1945
Primary view of Progress Report for Month of December 1944
unknown creator
January 1, 1945
Primary view of PROGRESS REPORT ON METALLURGY OF TUBALLOY TO UNIVERSITY OF CHICAGO
unknown creator
January 1, 1945
Primary view of Thermal Stresses and Strains in a Finite Cylinder With No Surface Forces
Murray, F. H.
January 1, 1945
Primary view of The Control of the HF Concentration of Electrolyte by Electrical Conductance Measurements. Problem Report for Period February 23, 1944 to November 27, 1944
Turnbull, S. G., Jr.
January 11, 1945
Primary view of METALLURGY DIVISION PROGRESS REPORT FOR THE PERIOD DECEMBER 30 1944 TO JANUARY 6, 1945
unknown creator
January 11, 1945
Primary view of Rough notes, coefficient tests, original data
Menegus, R. L.
January 11, 1945
Primary view of The Solvent Extraction of Pu(Iv) by Trifluoroacetylacetone
Crandall, H. W.; Thomas, J. R. & Reid, J.C.
January 15, 1945
Primary view of Technical Department report on Production Test No. 313-58-M: Recovery of lead dipped slugs
Eubank, L. D.
January 17, 1945
Primary view of DIFFUSION OF ELECTROPLATES. Final Report on a Part of Problem Assignment No. 381-ML-54-3, F.S. 17. Section T-IV
Foote, F.; Clark, J.R.; Nelson, B.J. & Morris, H.
January 19, 1945
Primary view of Technical Department report on Production Test No. 313-40-M: Machinability of heavy metal
Grills, R. C.
January 19, 1945
Primary view of DEVELOPMENT OF SHIPPING CYLINDERS FOR C-216 F$sub 2$ . Problem Report JWD-43
Froning, J.F. & Richards, M.K.
January 20, 1945
Back to Top of Screen