Search Results

open access

Core Parameter Study for a 300-Mw Sodium Graphite Reactor

Description: A core parameter study of the operating costs was performed for a 300- Mwe sodium graphite reactor, a scale-up of the Hallam Power Reactor. The results of the study indicate that the core design is nsar optimum and that core modifications would reduce the power costs by less than 5%. The lattice spacing, fuel rod diameter, and sodium flow can be varied within a rather broad range without significant changes in power generation costs. The effect of the fuel cladning thickness is more significant… more
Date: October 22, 1959
Creator: Corcoran, W.P.
Partner: UNT Libraries Government Documents Department
open access

Survey of the Radiation Levels in the Containment Vessel of the Enrico Fermi Atomic Power Plant. Part 5. Gamma Radiation Levels on the Operating Floor of the Containment Building. A. Levels Above the Equipment Compartment. Technical Memorandum No. 16

Description: The results are presented of a survey of calculated gamma-ray levels at many points on the surface of the operating floor of the containment building for the Enrico Fermi reactor. That portion of the floor surveyed lies directly above the equipment compartment. The calculations were made with the aid of an IBM-650 electronic computer. The main source of radioactivity which gives rise to gamma radiation above the floor is the radioactive sodium-24 in the primary coolant system. This system was c… more
Date: December 22, 1959
Creator: Chaltron, W.F. & Hungerford, H.E.
Partner: UNT Libraries Government Documents Department
open access

Internally Cooled Molten-Salt Reactors

Description: The initial and long-term nuclear characteristics of two internally cooled heteroingeneous graphite-moderated two-region molten-salt reactors were studied. The reactors have doubling times of 22.5 and 27.5 years. Methods of decreasing the doubling times by removing the Pa/sup 233/ from the core and by increasing the specific power of the reactor are described. (auth)
Date: June 22, 1959
Creator: Lackey, M. E.
Partner: UNT Libraries Government Documents Department
open access

Modified Zirflex Process for Dissolution of Zirconium-and Niobium-Bearing Nuclear Fuels in Aqueous Fluoride Solutions: Laboratory Development

Description: Modified Zirflex process flowsheets were developed for recovering uranium from the newer power reactor fuel alloys after discharge from the reactor. The STR (1% U97% Zr-2% Sn) and EBWR Core-1 (93.5% U-5% Zr-1.5% Nb clad in Zircaloy-2) fuels are used as examples of low- and high-uranium fuels, respectively. A dissolvent of 6 M NH/sub 4/F yields a solution of zirconium and a precipitate of ammonium uranous fluoride. In one process, ammonium hydroxide is added to produce insoluble hydrous oxides o… more
Date: December 22, 1959
Creator: Gens, T. A. & Baird, F. G.
Partner: UNT Libraries Government Documents Department
open access

Hexone Extraction-Coulometric Titration of Uranium

Description: Samples containing 5 to 10 mg of uranium were extracted with hexone (methyl isobutyl ketone) and titrated coulometrically in sulfate media. Relative standard deviations of 0.43% for samples containing 5 mg and 0.56% for 10 mg were determined by precision studies. (auth)
Date: June 22, 1959
Creator: Blevins, E. L.
Partner: UNT Libraries Government Documents Department
open access

PRELIMINARY REPORT ON 2% U$sup 235$-ENRICHED UF$sub 4$-C$sub 25$H$sub 52$ CRITICAL ASSEMBLIES

Description: A series of critical experiments with blocks of 2% U/sup 235/--enriched UF/sub 4/-C/sub 25/sub 5/H/sub 52/ was initiated at the ORN L Critical Experiments Facility. Thus far assemblies with H:U/sup 235/ atomic ratios of 195 and 294 were built in parallelepipedal and simulated cylindrical geometries, both reflected and unreflected. From the results the minimum critical masses for reflected spheres were determined to be 16.3 and 8.5 kg of U/sup 235/ for fuel mixtures with H:U atomic ratios of 195… more
Date: April 22, 1959
Creator: Mihalczo, J T; Lynn, J J; Scott, D & Connolly, W C
Partner: UNT Libraries Government Documents Department
open access

THE THEORY AND DESIGN OF THE TRIGGERED SPARK GAP

Description: The basic theory of operation of the triggered spark gap is established, and qualitative and quantitative engineering design data are given. From the basic twoelectrode gap, a three-electrode or triggered gap model is established with its static and dynamic triggering characteristics shown. Several geometry conditions such as gap spacings trigger electrode hole sizes and insulator effects are discussed, showing their influence upon the triggering mechanism. A suggested trigger mechanism is give… more
Date: May 22, 1959
Creator: Williams, T.J.
Partner: UNT Libraries Government Documents Department
open access

Description of a capsule for irradiation of fuel specimens at high temperatures

Description: A controlled-temperature irradiation capsule was operated containing small fueled specimens at 160O to 1650 F. The design involved calculating the specimen heat-generation rate and designing an insulating gas gap around the specimens to achieve the desired temperature. Electric heaters were inserted to help control temperature. The thickness and composition of the gas gap were modified prior to operation on the basis of information on probable neutron flux obtained from a nuclear mock-ups and o… more
Date: April 22, 1959
Creator: Basham, S. J.; Stang, J. H.; Goldthwaite, W. H. & Dunnington, B. W.
Partner: UNT Libraries Government Documents Department
open access

Pilot Plant Preparation of Thorium and Thorium-Uranium Oxides

Description: Thorium oxide is formed by the calcination of thorium oxalate precipitated under carefully controlled conditions. Material is produced with mean particle diameters of 1 to 5 mu . Some of the thorium oxide had uranium added to it by decomposing uranyl carbonate on the thorium oxide followed by calcination. Most of the oxides prepared were calcined to 1000 deg C or more and size classified to remove particles greater than 10 mu . The oxides were prepared in 150-lb batches, with a complete cycle r… more
Date: December 22, 1959
Creator: Johnsson, K. O. & Winget, R. H.
Partner: UNT Libraries Government Documents Department
open access

Control of Thorium Oxide Particle Size

Description: By carefully controlling the agitation, temperature, concentrations, and reagent addition rate, it was possible to produce a thorium oxide product within 0.3 mu of any selected size between 2.0 and 3.0 mu . The rate of addition of oxalic acid to a thorium nitrate solution was the variable used in the current series of tests. (auth)
Date: January 22, 1959
Creator: Johnsson, K. O. & Ellison, C. V.
Partner: UNT Libraries Government Documents Department
open access

LIMITATIONS FOR EXISTING STORAGE TANKS FOR RADIOACTIVE WASTES FROM SEPARATIONS PLANTS

Description: The physical limitations of existing storage tanks for radioactive wastes from separations plants are defined as a guide for preparing process and operating criteria for the existing tank forms to assure continued integrity of the tanks. A "safe-load" curve for each of the four groups of tanks based on current technology is presented. Loading conditions, operation procedures, and thermal stresses are discussed. (M.C.G.)
Date: October 22, 1959
Creator: Doud, E. & Stivers, H.W.
Partner: UNT Libraries Government Documents Department
open access

A Wide-Range Neutron Detector and Monitoring Instrument : Final Report

Description: This is the final report on the progress, "A Wide-Range Neutron Detector and Monitoring Instrument," ARF 1118-6. This report covers activities from May 8, 1958 to May 8, 1959. This report describes the basic design principles of a proportional counter that has been constructed whose cathode diameter increases towards one end.
Date: April 22, 1959
Creator: Porges, K. G.
Partner: UNT Libraries Government Documents Department
open access

High Current Electron Accelerator

Description: The following report describes the investigations of the microwave solution and the Astron solution, to produce high current electron beams.
Date: January 22, 1959
Creator: Christofilos, Nicholas C.
Partner: UNT Libraries Government Documents Department
open access

Temperatures and Thermal Stresses in Hexagonal Tubes and Pierced Plates With Internal Heat Sources

Description: From abstract: "Steady temperatures and thermal stresses are determined for long hexagonal tubes having round holes for the case of uniform internal heat generation and a fluid-cooled inside surface. Thermal stresses are also determined for thick plates pierced by holes on an equilateral triangular pattern and for hexagonal tubes having a hexagonal hole with rounded inside corners. Stresses in the end regions of tubes are also investigated."
Date: September 22, 1959
Creator: Meuser, Robert B.
Partner: UNT Libraries Government Documents Department
open access

190-C pump capacity

Description: The purpose of this document is to update 190-C pump capacity information previous released in HW-52449{sup 1} and HW-58580{sup 2}. Improvements in motor cooling has resulted in raising the previous 3500 HP limit to 3660 HP{sup 3} thus increasing total pumping capacity.
Date: June 22, 1959
Creator: Watson, D. F.
Partner: UNT Libraries Government Documents Department
open access

Hanford Atomic Products Operation annual report 1958

Description: This annual report (1958) from the Hanford Atomic Products Operation. Various programs are briefly described including irradiation processing, fuels preparation, chemical processing, research and development, and supporting operations.
Date: April 22, 1959
Partner: UNT Libraries Government Documents Department
open access

Design of production test IP-297-A-FP, The effect of autoclave film damage on the incidence of groove pitting on X-8001 alloy fuel jackets

Description: The recent increase in the incidence of groove pitting on X-8001 clad fuel elements in the old reactors apparently refutes the earlier hypothesis that surface segregation of the secondary phase of this alloy was the primary cause of the unique, preferential attack sustained during irradiation. Components received within the past fifteen months have exhibited essentially none of the segregation. On the other hand, recent evidence suggests that localized penetration of the autoclave film on X-800… more
Date: December 22, 1959
Creator: Hall, R. E. & Hodgson, W. H.
Partner: UNT Libraries Government Documents Department
open access

Revised recommendations for the 100-K Area Project CG-775 raw water requirements

Description: As a part of Project CG-775, 100-K Area Water Plant Expansion, the capacity of the 181-K river pump installations will be increased. Recommendations for the raw water requirements based on a reactor flow of 175,000 gpm were presented in document HW-55877. Since then a new fuel element has been developed for the K reactors, resulting in a lower reactor system curve. It is recommended that the design criteria for the 181-K river pumps be based on a total raw water flow of 213,000 gpm with spare p… more
Date: June 22, 1959
Creator: Fifer, N. F.
Partner: UNT Libraries Government Documents Department
open access

Irradiation Processing Department Monthly Record Report: September 1959

Description: This document details activities of the irradiation processing department during the month of September, 1959. A general summary is included at the start of the report, after which the report is divided into the following sections: Research and Engineering Operations; Production and Reactor Operations; Facilities Engineering Operation; Employee Relations Operation; and Financial Operation.
Date: October 22, 1959
Creator: Greninger, A. B.
Partner: UNT Libraries Government Documents Department
open access

Chemical Processing Department monthly report, June 1959

Description: Production of Pu from separations plants and output of unfabricated Pu exceeded commitments. Purex plant set a new record high for U processed. Production and shipments of UO{sub 3} met schedules. Purex solvent extraction battery performed below normal, probably because of poor solvent quality. NaOH addition to Redox coating removal waste is being reduced. A 3fold improvement in Recuplex product Al impurity was achieved by means of a specific gravity difference > 0.15 between dilute aqueous fee… more
Date: July 22, 1959
Creator: MacCready, W. K.
Partner: UNT Libraries Government Documents Department
open access

Composition of Solids from Purex LWW

Description: The solids in Purex lww were first observed during flowsheet tests for recovery of fission products from plant wastes. Since the nature of this solid was not apparent from the flowsheet composition of lww, some work was performed to characterize this material. Although this work has been conducted over a period of about one year, it has been subordinate to the main one of testing flowsheets for fission product recovery. The solids have been observed in each of about six samples of plant lww tha… more
Date: January 22, 1959
Creator: Van Tuyl, H.H.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen