Search Results

open access

Austenitic stainless steels for cryogenic service

Description: Presently available information on austenitic Fe-Cr-Ni stainless steel plate, welds, and castings for service below 77 K are reviewed with the intent (1) of developing systematic relationships between mechanical properties, composition, microstructure, and processing, and (2) of assessing the adequacy of these data bases in the design, fabrication, and operation of engineering systems at 4 K.
Date: September 19, 1985
Creator: Dalder, E.N.C. & Juhas, M.C.
Partner: UNT Libraries Government Documents Department
open access

Tiber winding pack design

Description: A preliminary winding pack design was performed with the goal of showing feasibility of producing 10-T maximum field with a pack current density of 40 A.mm/sup -2/ while accepting 2.7 kW per coil nuclear heating. A cable-in-conduit conductor design (CIC), reported at the 6th Topical Meeting on the Technology of Fusion Energy, was based on several key issues.
Date: August 19, 1985
Creator: Miller, J. R.
Partner: UNT Libraries Government Documents Department
open access

Photovoltaic research opportunities. Final report

Description: The purpose of this study is to identify opportunities for photovoltaic (PV) research projects to capitalize on related but non-PV research. The study is performed under the assumption that a considerable body of ongoing semiconductor research in non-PV areas could be of value to its PV Program and the PV community in general. Research related to III-V compounds, thin films, and crystalline silicon materials is included. Research that is known to be PV-related or sponsored by DOE was excluded f… more
Date: November 19, 1985
Creator: Macaleer, B.; Bowers, J. & Hurlburt, B.
Partner: UNT Libraries Government Documents Department
open access

Sector 1-LTR-RTL-Sector 2 treaty

Description: We have determined the location of the linac and damping ring interface. This treaty point serves as a pivot about which the optics for sector one, the Linac-To-Ring lines, Ring-To-Linac lines, and sector two have been designed. The treaty location is at Z = 98.7532 m from the beginning of the SLC linac sector one. Our choices of location and beam parameters are consistent with the verbal charter of Ecklund, Fieguth, and others.
Date: March 19, 1985
Creator: Woodley, M.D. & Sheppard, J.C.
Partner: UNT Libraries Government Documents Department
open access

Westinghouse Materials Company (WMCO). Final report, October 25, 1985--December 31, 1985

Description: This document summarizes the first two weeks of the transition plan for Westinghouse Materials Company (WMCO) to transition into management of the Feed Materials Production Center. The report presents accomplishments, planned activities, and percieved problems for the process, organized into 15 general areas: operations and maintenance; human resources; community involvement; environmental, safety and health; security and safeguards; finance; legal and contracts management; engineering and cons… more
Date: November 19, 1985
Creator: Boswell, B.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen