Surveyor VI Mission Report: Part 2 - Science Results
Description:
Report discussing the Surveyor VI mission, the sixth in a series of seven unmanned spacecraft designed to soft-land on the moon and return engineering and scientific data. This part presents the scientific data derived from the mission, and the scientific analyses conducted by the Surveyor Scientific Evaluation Advisory Team, the Surveyor Investigator Teams, and the Associated Working Groups.
Date:
January 10, 1968
Creator:
Jet Propulsion Laboratory (U.S.)
Partner:
UNT Libraries Government Documents Department