Search Results

Primary view of 0.351 micron Laser Beam propagation in High-temperature Plasmas
Froula, D.; Divol, L.; Meezan, N.; Ross, J.; Berger, R. L.; Michel, P. et al.
December 10, 2007
Primary view of 3-D Force-balanced Magnetospheric Configurations
Zaharia, Sorin; Cheng, C. Z. & Maezawa, K.
February 10, 2003
Primary view of A 3-year plan for beam science in the heavy-ion fusion virtual national laboratory
Logan, B. Grant
September 10, 2001
Primary view of 10-MWe pilot-plant-receiver-panel test-requirements document: Solar Thermal Test Facility
unknown creator
June 10, 1978
Primary view of 14-Inch Swing Check Valve Test
Cygan, R.
February 10, 1960
Primary view of 17 GHz High Gradient Accelerator Research
Temkin, Richard J. & Shapiro, Michael A.
July 10, 2013
Primary view of 25 Year Lifetime for Flexible Buildings Integrated Photovoltaics
Gross, Mark E.
July 10, 2010
Primary view of 40-kW field test power plant modification and development. Monthly technical status report No. 13, September 16, 1978-October 15, 1978
unknown creator
November 10, 1978
Primary view of 95-1 Campaign evaporator boildown results
Miller, G. L.
October 10, 1994
Primary view of 100 Area soil washing: Bench scale tests on 116-F-4 pluto crib soil
Field, J. G.
June 10, 1994
Primary view of 100 Areas: (For Technical Progress Letter No. 96), April 30--May 6
Jordan, W. E.
May 10, 1946
Primary view of 100 Areas technical activities report: Engineering, May 1947
Woods, W. K.
June 10, 1947
Primary view of 100-K Area Downcomer Test Data Project CGI-883
Hutton, P. H.
January 10, 1961
Primary view of AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)
Thomas, W. K.
January 10, 2000
Primary view of 105-KW Sandfilter Backwash Pit sludge volume calculation
Dodd, E.N. Jr.
February 10, 1995
Primary view of 200 area effluent treatment facilities configuration management plan
Sullivan, N. J.
October 10, 1995
Primary view of 200 Area effluent treatment facility process control plan 95-001
Sullivan, N. J.; Flyckt, D. L. & Peres, M. W.
October 10, 1995
Primary view of 200 area liquid effluent facility quality assurance program plan. Revision 1
Sullivan, N. J.
October 10, 1995
Primary view of 200 Area monthly report No. 4, April 1966
Christy, J. T.
May 10, 1966
Primary view of 200 Area weekly report
Christl, R. J.
March 10, 1955
Primary view of 200 area weekly report
unknown creator
November 10, 1955
Primary view of 224-UA continuous calciner trough examination
Kennedy, R. A.
March 10, 1958
Primary view of 234-5 Building RM line equipment tests, Task III mixer
Collins, P. E.
April 10, 1952
Primary view of 242-A Evaporator/plutonium uranium extraction (PUREX) effluent treatment facility (ETF) nonradioactive air emission test report
Hill, J. S.
May 10, 1996
Back to Top of Screen