Search Results

Advanced search parameters have been applied.
open access

Pneumatic ponton bridge M3

Description: Discusses the purpose and usage of the pneumatic pontoon bridge M3 by infantry in the field. Covers construction, deployment, and maintenance.
Date: April 19, 1943
Creator: United States. War Department.
Partner: UNT Libraries Government Documents Department
open access

AC-130H Gunship Armor Upgrade Project

Description: This report covers the test methods and equipment for testing aircraft armor both hard and soft. The hard armor are the typical ceramic type while the soft armor are various types of layered composite materials. 10 figs. (JEF)
Date: September 19, 1990
Creator: Shell, T. E. & Landingham, R. L.
Partner: UNT Libraries Government Documents Department
open access

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

Description: The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and … more
Date: September 19, 2006
Creator: Wells, R. P.
Partner: UNT Libraries Government Documents Department
open access

Teletypewriter switching and relay procedure.

Description: Describes Army procedures "for establishment, control, and termination of teletypewriter connections involving one more more manual switching centrals" as well as relaying sets of messages through reperforator centrals.
Date: September 19, 1944
Creator: United States. War Department.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen