Addendum 3 to CSAR 80-027, Use of calorimeter 109B for fissile material measurement
Description:
This modification to the Plutonium Finishing Plant (PFP) calorimeter system involves removing current calorimeter No. 3 from the water bath and replacing it with a calorimeter that can accommodate larger diameter items (an oversize can). The inside diameters of both the sample and the reference cells will be increased to 5.835 inches at the top opening and to 5.22 inches at the bottom, the 8 inch high measurement zone. This Addendum 3 to Criticality Safety Analysis Report 80-027 examines critic…
more
Date:
December 5, 1994
Creator:
Chiao, T.
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department