Kilowatt Isotope Power System: component test report for the ground demonstration system pump. 77-KIPS-99
Description:
The purpose of this test was to demonstrate that the pump utilized for the developmental program to be conducted on the Kilowatt Isotope Power System (KIPS) fulfilled the requirements of Test Procedure 398A, Component Test Procedure for the Ground Demonstration System Pump. The results of the tests are reported. From these results it was concluded that the pump for the Kilowatt Isotope Power System has satisfactorily completed the requirements of Sundstrand Pump Test Procedure, TP 398A.
Date:
February 8, 1978
Creator:
Brainard, E.L.
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department