This system will be undergoing maintenance April 18th between 9:00AM and 12:00PM CDT.

Search Results

Primary view of 13-Watt Curium Fueled Thermoelectric Generator for a Six-Month Space Mission. Final Report
Bloom, J. L.
July 1, 1960
Primary view of 13-Watt Curium-Fueled Thermoelectric Generator for Hard Lunar Impact Mission. Final Report-Subtask 5.8
Bloom, J. L.
August 1, 1960
Primary view of 14-Inch Swing Check Valve Test
Cygan, R.
February 10, 1960
Primary view of 40-MW(E) PROTOTYPE HIGH-TEMPERATURE GAS-COOLED REACTOR RESEARCH AND DEVELOPMENT PROGRAM. Summary Report for the Period January 1, 1959-December 31, 1959 and Quarterly Progress Report for the Period October 1, 1959-December 31, 1959
unknown creator
September 1, 1960
Primary view of 75,000 KILOWATTS OF ELECTRICITY BY NUCLEAR FISSION AT THE HALLAM NUCLEAR POWER FACILITY
Gronemeyer, F.C. & Merryman, J.W.
January 1, 1960
Primary view of 100-K Area electrical power system load and voltage study for project CG-775. Revision
Thorson, W. R.
February 22, 1960
Primary view of 100-Watt Curium-242 Fueled Thermoelectric Generator--Conceptual Design. SNAP Subtask 5.7 Final Report
Weddell, J. B. & Bloom, J.
May 1, 1960
Primary view of EEN-307, Irradiation of units at low temperature test
Guthrie, J.B.
April 13, 1960
Primary view of EN-318 evaluation of slow warm-up through special test of MC-890 type power supplies
Ling, R.F.
September 1, 1960
Primary view of EEN-333, revised getter flash procedure
Brown, W.C.
June 28, 1960
Primary view of 909B high energy gull generator
Stephens, W. H.
December 31, 1960
Primary view of ABRAC--AN IBM-704 THREE DIMENSIONAL NUCLEAR-THERMAL DEPLETION PROGRAM WITH DISTRIBUTED VOID EFFECTS
Jacobi, W. M.; Lawton, T. J.; Meanor, S. H. & Parrette, J. R.
March 1, 1960
Primary view of ABWR QUARTERLY PROGRESS REPORT, JANUARY 1 TO MARCH 31, 1960. VOLUME I. SL- 1 OPERATIONS AND EVALUATION . VOLUME II. SL-1 HEALTH PHYSICS AND SAFETY
Canfield, R. T.; Rausch, W. P.; Vallario, E. J.; Young, R. G. & Henderson, S. K.
May 25, 1960
Primary view of Accurate Micrometer for Corrosion Samples
Woodward, W. J.
June 1, 1960
Primary view of Active Metal Reduction of Plutonium Trichloride
Soine, T. S. & Hopkins, H. H., Jr.
May 1, 1960
Primary view of ACTIVITY DUE TO N$sup 16$ AND N$sup 17$ IN THE HFIR PRIMARY COOLANT
McLain, H. A.
May 25, 1960
Primary view of Activity in the HFIR Primary Coolant System After a Meltdown of the Fuel in Reactor
McLain, H. A.
June 10, 1960
Primary view of THE ADIABATIC ELASTIC MODULI OF SINGLE-CRYSTAL ALPHA URANIUM AT 25 C. Work completed: January 1958. Partial Report-Metallurgy Program 4.1.16
Fisher, E. S.
June 1, 1960
Primary view of ADVANCED CRITICAL EXPERIMENT SAFEGUARDS REPORT. SUPPLEMENT NO. 2. NUSU PHASE B AND C.
Harding, R S & Slater, M
January 1, 1960
Primary view of Advanced Once-Through Steam Generator for Sodium Application
Terpe, G.R.
September 19, 1960
Primary view of AN ADVANCED SODIUM-GRAPHITE REACTOR NUCLEAR POWER PLANT
Churchill, J. R. & Renard, J.
March 15, 1960
Primary view of THE ADVANCED TEST REACTOR-ATR FINAL CONCEPTUAL DESIGN
deBoisblanc, D.R. et al
November 1, 1960
Primary view of Advanced Thermoelectric Power System. Final Report
Harvey, R. J.
January 1, 1960
Primary view of Advantages of Glass Microballoons as Filler Material
Walterbach, F. R.
August 10, 1960
Back to Top of Screen