Search Results

Primary view of METEOROLOGICAL MONITORING PROGRAM, PARTICULATE MATTER AMBIENT AIR QUALITY MONITORING REPORT, JANUARY 1992 THROUGH DECEMBER 1995
/a, n
March 29, 1996
Primary view of Cost Effective Machining and Inspection of Structural Ceramic Components for Advanced High Temperature Application. Final CRADA Report for CRADA Number Y-1292-0151
Abbatiello, L. A. & Haselkorn, M.
November 29, 1996
Primary view of Development of a video-based slurry sensor for on-line ash analysis. Fifth quarterly technical progress report, October 1, 1995--December 31, 1995
Adel, G. T. & Luttrell, G. H.
January 29, 1996
Primary view of Safety evaluation for packaging (onsite) for concrete-shielded RHTRU waste drum for the 327 postirradiation testing laboratory
Adkins, H. E.
October 29, 1996
Primary view of Waste status and transaction record summary (WSTRS) for the northeast quadrant of the Hanford 200 area
Agnew, S. F.; Corbin, R. A.; Duran, T. B.; Jurgensen, K. A.; Ortiz, T. P. & Young, B. L.
January 29, 1996
Primary view of Conference Committee and Related Procedures: An Introduction
Bach, Stanley
July 29, 1996
Primary view of Ionization in liquids. Final technical report, November 1, 1993--December 31, 1995
Bakale, G.
March 29, 1996
Primary view of Tank characterization report for double-shell tank 241-AP-108
Baldwin, J. H.
July 29, 1996
Primary view of National Ignition Facility system design requirements NIF integrated computer controls SDR004
Bliss, E.
August 29, 1996
Primary view of Development and testing of a high efficiency advanced coal combustor phase III industrial boiler retrofit. Technical progress report No. 17, 18 and 19, September 30, 1991--December 31, 1996
Borio, R.W.; Patel, R.L. & Thornock, D.E.
July 29, 1996
Primary view of Hydraulic test unit and plugs. [Quarterly] technical progress report No. 16, October 1, 1995--December 31, 1995
Catapano, M.
February 29, 1996
Primary view of W-030, AY/AZ tank farm cooling and miscellaneous instrumentation
Cole, D. B.
April 29, 1996
Primary view of Final report for tank 241-BX-112, auger samples 95-Aug-047 and 95-Aug-048
Conner, J.M.
February 29, 1996
Primary view of Feasability of Optimizing Recovery and Reserves from a Mature and Geological Complex Multiple Turbidite Offshore California Reservoir Through the Drilling and Completion of a Trilateral Horizontal Well
Coombs, Steven F.
October 29, 1996
Primary view of Systems acceptance and operability testing for rotary mode core sampling in flammable gas tanks
Corbett, J.E., Westinghouse Hanford
July 29, 1996
Primary view of PCR detection of groundwater bacteria associated with colloidal transport
Cruz-Perez, Patricia; Stetzenbach, L. D. & Alvarez, A. J.
February 29, 1996
Primary view of Time, temperature, and compositional study of Am/Cm target glass durability
Daniel, W. E. & Best, D. R.
February 29, 1996
Primary view of Maintenance of the coal sample bank and database. Quarterly progress report, April 1, 1996--June 30, 1996
Davis, A. & Glick, D.C.
July 29, 1996
Primary view of DHLW Glass Waste Package Criticality Analysis (SCPB:N/A)
Davis, J. W.
March 29, 1996
Primary view of SAS2H Generated Isotopic Concentrations For B&W 15X15 PWR Assembly (SCPB:N/A)
Davis, J. W.
August 29, 1996
Primary view of Liaison activities with the Institute of Physcial Chemistry of the Russian Academy of Sciences: Midyear report
Delegard, C.H.
May 29, 1996
Primary view of Packaging design criteria for the MCO cask
Edwards, W. S.
April 29, 1996
Primary view of Advanced emissions control development project. Final report, November 1, 1993--February 29, 1996. Phase I
Farthing, G.A.
February 29, 1996
Primary view of Selenium emission control at high temperatures with mineral sorbents. Final report, September 1, 1994--February 29, 1996
Ghosh-Dastidar, Abhijit; Mahuli, Suhas; Agnihotri, Rajeev & Fan, Liang-Shih
February 29, 1996
Back to Top of Screen