Drilling and early testing of a sidetrack from the slant hole completion test well
Description:
During the winter of 1990 to 1991, the Department of Energy evaluated several options to completing the originally-planned slant hole production tests. A decision was made to sidetrack the original hole and to redrill the 60 and 90{degrees} sections. The objectives for drilling the sidetrack to the original slant hole wellbore are as follows: (1) Test high angle and horizontal drilling and completion technologies as an alternative to vertical wells and hydraulic fracture treatments in tight, na…