Search Results

Advanced search parameters have been applied.
open access

Cold Vacuum Drying facility HVAC system design description

Description: This System Design Description (SDD) addresses the HVAC system for the CVDF. The CVDF HVAC system consists of five subsystems: (1) Administration building HVAC system; (2) Process bay recirculation HVAC system; (3) Process bay local exhaust HVAC and process vent system; (4) Process general supply/exhaust HVAC system; and (5) Reference air system. The HVAC and reference air systems interface with the following systems: the fire protection control system, Monitoring and Control System (MCS), elec… more
Date: September 22, 2000
Creator: Singh, G.
Partner: UNT Libraries Government Documents Department
open access

Environmental Management Performance Report May 2000

Description: The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, sche… more
Date: May 1, 2000
Creator: EDER, D.M.
Partner: UNT Libraries Government Documents Department
open access

SigmaPlot 2000, Version 6.00, SPSS Inc. Computer Software Project Management, Requirements, and Design Document

Description: SigmaPlot is a vendor software product that will be used to convert the area under an absorbance curve generated by a Fourier transform infrared spectrometer (FTIR) to a relative area. SigmaPlot will be used in conjunction with procedure ZA-565-301, ''Determination of Moisture by Supercritical Fluid Extraction and Infrared Detection.''
Date: October 24, 2000
Creator: Hurlbut, S. T.
Partner: UNT Libraries Government Documents Department
open access

Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

Description: The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.
Date: January 10, 2000
Creator: MITCHELL, R.L.
Partner: UNT Libraries Government Documents Department
open access

Fluor Hanford Nuclear Material Stabilization Project Welding Manual

Description: The purpose of this section of the welding manual is to: (1) Provide a general description of the major responsibilities of the organizations involved with welding. (2) Provide general guidance concerning the application of codes related to welding. This manual contains requirements for welding for all Fluor Hanford (FH) welding operators working on the W460 Project, in the Plutonium Finishing Plant (PFP) at the U. S. Department of Energy (DOE) Hanford facilities. These procedures and any addit… more
Date: October 20, 2000
Creator: BERKEY, J.R.
Partner: UNT Libraries Government Documents Department
open access

Environmental Management Performance Report September 2000

Description: The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance descri… more
Date: September 1, 2000
Creator: Eder, D. M.
Partner: UNT Libraries Government Documents Department
open access

Environmental Management Performance Report November 2000

Description: The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the… more
Date: November 1, 2000
Creator: EDER, D.M.
Partner: UNT Libraries Government Documents Department
open access

Central Waste Complex (CWC) Waste Analysis Plan

Description: The purpose of this waste analysis plan (WAP) is to document the waste acceptance process, sampling methodologies, analytical techniques, and overall processes that are undertaken for waste accepted for storage at the Central Waste Complex (CWC), which is located in the 200 West Area of the Hanford Facility, Richland, Washington. Because dangerous waste does not include the source special nuclear and by-product material components of mixed waste, radionuclides are not within the scope of this d… more
Date: January 6, 2000
Creator: ELLEFSON, M.D.
Partner: UNT Libraries Government Documents Department
open access

White paper updating conclusions of 1998 ILAW performance assessment

Description: The purpose of this document is to provide a comparison of the estimated immobilized low-activity waste (LAW) disposal system performance against established performance objectives using the beat estimates for parameters and models to describe the system. The principal advances in knowledge since the last performance assessment (known as the 1998 ILAW PA [Mann 1998a]) have been in site specific information and data on the waste form performance for BNFL, Inc. relevant glass formulations. The wh… more
Date: May 11, 2000
Creator: Mann, F. M.
Partner: UNT Libraries Government Documents Department
open access

Ashcroft Pressure Switch Monitor for Low SCHe Supply Bottle Pressure

Description: These pressure switches are located in the SCHe helium supply lines at the pressure bottles and upstream of the PRV. The switches monitor the SCHe supply bottle pressure and are set to alarm at 2200 psig. There is one switch for each SCHe supply (4). Electronic output signal is NON-SAFETY (GS).
Date: June 21, 2000
Creator: Van Katwijk, Carl
Partner: UNT Libraries Government Documents Department
open access

Total Measurement Uncertainty (TMU) for Nondestructive Assay of Transuranic (TRU) Waste at the WRAP Facility

Description: The Waste Receiving and Processing (WRAP) facility, located on the Hanford Site in southeast Washington, is a key link in the certification of Hanford's transuranic (TRU) waste for shipment to the Waste Isolation Pilot Plant (WIPP). Waste characterization is one of the vital functions performed at WRAP, and nondestructive assay (NDA) measurements of TRU waste containers is one of two required methods used for waste characterization (Reference 1). Various programs exist to ensure the validity of… more
Date: February 24, 2000
Creator: WILLS, C.E.
Partner: UNT Libraries Government Documents Department
open access

L-286 Acceptance Test Record

Description: This document provides a detailed account of how the acceptance testing was conducted for Project L-286, ''200E Area Sanitary Water Plant Effluent Stream Reduction''. The testing of the L-286 instrumentation system was conducted under the direct supervision
Date: January 14, 2000
Creator: Harmon, B. C.
Partner: UNT Libraries Government Documents Department
open access

Environmental Management Performance Report for December 1999

Description: The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National … more
Date: February 16, 2000
Creator: EDER, D.M.
Partner: UNT Libraries Government Documents Department
open access

SigmaPlot 2000, Version 6.00, SPSS Inc. Computer Software Test Plan

Description: SigmaPlot is a vendor software product used in conjunction with the supercritical fluid extraction Fourier transform infrared spectrometer (SFE-FTIR) system. This product converts the raw spectral data to useful area numbers. SigmaPlot will be used in conjunction with procedure ZA-565-301, ''Determination of Moisture by Supercritical Fluid Extraction and Infrared Detection.'' This test plan will be performed in conjunction with or prior to HNF-6936, ''HA-53 Supercritical Fluid Extraction System… more
Date: October 24, 2000
Creator: Hurlbut, S T.
Partner: UNT Libraries Government Documents Department
open access

Cold Vacuum Drying (CVD) Facility Technical Safety Requirements

Description: The Technical Safety Requirements (TSRs) for the Cold Vacuum Drying Facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt of multi-canister overpacks (MCOs) containing spent nuclear fuel. removal of free water from the MCOs using the cold vacuum drying process, and inerting and testing of the MCOs before transport to the Canister Storage Building. Controls required for public safety, sign… more
Date: August 8, 2000
Creator: KRAHN, D. E.
Partner: UNT Libraries Government Documents Department
open access

Environmental Management Performance Report July 2000

Description: The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.
Date: July 1, 2000
Creator: EDER, D.M.
Partner: UNT Libraries Government Documents Department
open access

Preparing for Implementation of DOE O 435.1 at Hanford

Description: Implementation of a new DOE Order at a complex site like Hanford is not as simple as just stating that the Order is to be followed. There are contractual changes, interface adjustments and institutional obstacles to overcome that all must be properly analyzed and dealt with before the actual physical changes embodied in the new requirements can be put into practice. In planning for these changes associated with the new DOE 0 435.1 ''Radioactive Waste Management'', the Richland Operations Office… more
Date: February 1, 2000
Creator: FRITZ, D.W.
Partner: UNT Libraries Government Documents Department
open access

Transuranic (TRU) Waste Phase I Retrieval Plan

Description: From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A1, the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for dis… more
Date: September 28, 2000
Creator: McDonald, Kent M.
Partner: UNT Libraries Government Documents Department
open access

Environmental Management Performance Report April 2000

Description: The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S … more
Date: April 1, 2000
Creator: EDER, D.M.
Partner: UNT Libraries Government Documents Department
open access

Radiological Work Planning and Procedure

Description: Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not… more
Date: January 1, 2000
Creator: KURTZ, J.E.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen