Search Results

Advanced search parameters have been applied.
open access

Electric load monitoring to support a shared energy savings procurement at the US Maritime Administration Merchant Marine Academy

Description: Equipment from the Mobile Energy Laboratory (MEL) testing and application program supported by the US Department of Energy Federal Energy Management Program (DOE-FEMP) was applied to measure three-phase power demand of three large buildings at the US Merchant Marine Academy (MMA) on Long Island, New York. The selected buildings were Bowditch Hall, Fulton-Gibbs Hall, and the Library. The MEL equipment was installed on March 17, 1991. Instruments to monitor the Bowditch Hall chiller as a separate… more
Date: June 1, 1992
Creator: Armstrong, P. R. & Parker, G. B.
Partner: UNT Libraries Government Documents Department
open access

Statistical model for assessing the risk of hail damage to any ground installation. Technical report, June 1978-March 1979

Description: This report describes a statistical model which has been developed to determine the risk of damage by large hail to any ground installation (such as a solar flat plate collector). The model is based on data for the number of haildays per year, hailstone size distribution, and storm severity (expressed in number of hailstones per square meter per storm). Other than parameters derived from the raw meteorological data available, the parameters of the model are the number of years of surface exposu… more
Date: September 1, 1979
Creator: Cox, M & Armstrong, P R
Partner: UNT Libraries Government Documents Department
open access

Development of a gas backup heater for solar domestic hot-water systems. Final report, April 1978-April 1980

Description: A comprehensive program was undertaken to develop a unique gas fired backup for solar domestic hot water systems. Detailed computer design tools were written. A series of heat transfer experiments were performed to characterize the performance of individual components. A full scale engineering prototype, including the solar preheat tank and solar heat exchanger, was designed, fabricated and subjected to limited testing. Firing efficiency for the backup system was found to be 81.4% at a firing r… more
Date: June 1, 1980
Creator: Morrison, D. J.; Grunes, H. E.; de Winter, F. & Armstrong, P. R.
Partner: UNT Libraries Government Documents Department
open access

Need for and evaluation of hail protection devices for solar flat plate collectors. Final report, June 1978-March 1980

Description: A brief summary of the hail risk work previously done under this contract is given, and a summary evaluation of hail impact resistance standards currently being developed is presented. Simulated hail impact test data, field data, and the impact resistance of commercially available glazings are discussed. The use of screens for protection against hail and the threat of vandalism to solar flat plate collectors are discussed. (WHK)
Date: March 1, 1980
Creator: Armstrong, P R; Cox, M & de Winter, F
Partner: UNT Libraries Government Documents Department
open access

Performance and evaluation of gas engine driven rooftop air conditioning equipment at the Willow Grove (PA) Naval Air Station

Description: In a field evaluation conducted for the US Department of Energy (DOE) Office of Federal Energy Management Program (FEMP), the Pacific Northwest Laboratory (PNL) examined the performance of a new US energy-related technology under the FEMP Test Bed Demonstration Program. The technology was a 15-ton natural gas engine driven roof top air conditioning unit. Two such units were installed on a naval retail building to provide space conditioning to the building. Under the Test Bed Demonstration Progr… more
Date: May 1, 1993
Creator: Armstrong, P. R. & Conover, D. R.
Partner: UNT Libraries Government Documents Department
open access

Waste water heat recovery appliance. Final report

Description: An efficient convective waste heat recovery heat exchanger was designed and tested. The prototype appliance was designed for use in laundromats and other small commercial operations which use large amounts of hot water. Information on general characteristics of the coin-op laundry business, energy use in laundromats, energy saving resources already in use, and the potential market for energy saving devices in laundromats was collected through a literature search and interviews with local laundr… more
Date: November 21, 1983
Creator: Chapin, H. D.; Armstrong, P. R. & Chapin, F. A. W.
Partner: UNT Libraries Government Documents Department
open access

Griffiss AFB integrated resource assessment

Description: The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-ef… more
Date: February 1, 1993
Creator: Dixon, D. R.; Armstrong, P. R. & Keller, J. M.
Partner: UNT Libraries Government Documents Department
open access

Aquifer thermal energy storage at Mid-Island postal facility: Phase 1 final report

Description: The successful widespread commercialization of aquifer thermal energy storage (ATES) in the United States will depend on how experiences gained from early full-scale projects are used as guides in the design, installation, and operation of future projects. One early system, built in the mid-1980s, is the US Postal Service (USPS) Mid-Island Mail Processing Facility (MPF), in Melville, New York. The heating, ventilation, and air conditioning (HVAC) of the MPF's workroom is provided by an ATES sys… more
Date: May 1, 1993
Creator: Marseille, T. J.; Armstrong, P. R.; Brown, D. R.; Vail, L. W. & Kannberg, L. D.
Partner: UNT Libraries Government Documents Department
open access

Fort Drum integrated resource assessment

Description: The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective… more
Date: December 1, 1992
Creator: Dixon, D. R.; Armstrong, P. R.; Daellenbach, K. K.; Dagle, J. E.; Di Massa, F. V.; Elliott, D. B. et al.
Partner: UNT Libraries Government Documents Department
open access

Fort Drum integrated resource assessment. Volume 3, Resource assessment

Description: The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective… more
Date: December 1, 1992
Creator: Dixon, D. R.; Armstrong, P. R.; Daellenbach, K. K.; Dagle, J. E.; Di Massa, F. V.; Elliott, D. B. et al.
Partner: UNT Libraries Government Documents Department
open access

Inspection and assessment of energy conservation opportunities at Ellis Island National Park, Ellis Island, New York

Description: Ellis Island is a National Park Service (NPS) facility located in New York Harbor that hosts two million visitors per year. The main building houses exhibits and artifacts, food and gift concessions, and staff work and office spaces in a 200,000-square-foot floor area. Heating and cooling of the main building are provided by a central heating and cooling plant, housed in an adjacent 20,000-square-foot building, with distribution by nine main fan systems and perimeter radiators. Energy end-use e… more
Date: December 1, 1992
Creator: Armstrong, P. R.; Parker, G. B. & Richman, E. E.
Partner: UNT Libraries Government Documents Department
open access

Performance and evaluation of gas engine driven rooftop air conditioning equipment at the Willow Grove (PA) Naval Air Station. Interim report, 1992 cooling season

Description: In a field evaluation conducted for the US Department of Energy (DOE) Office of Federal Energy Management Program (FEMP), the Pacific Northwest Laboratory (PNL) examined the performance of a new US energy-related technology under the FEMP Test Bed Demonstration Program. The technology was a 15-ton natural gas engine driven roof top air conditioning unit. Two such units were installed on a naval retail building to provide space conditioning to the building. Under the Test Bed Demonstration Progr… more
Date: May 1, 1993
Creator: Armstrong, P. R. & Conover, D. R.
Partner: UNT Libraries Government Documents Department
open access

Electric load monitoring to support a shared energy savings procurement at the US Maritime Administration Merchant Marine Academy

Description: Equipment from the Mobile Energy Laboratory (MEL) testing and application program supported by the US Department of Energy Federal Energy Management Program (DOE-FEMP) was applied to measure three-phase power demand of three large buildings at the US Merchant Marine Academy (MMA) on Long Island, New York. The selected buildings were Bowditch Hall, Fulton-Gibbs Hall, and the Library. The MEL equipment was installed on March 17, 1991. Instruments to monitor the Bowditch Hall chiller as a separate… more
Date: June 1992
Creator: Armstrong, P. R. & Parker, G. B.
Partner: UNT Libraries Government Documents Department
open access

Aquifer Thermal Energy Storage at Mid-Island Postal Facility: Phase 1 Final Report

Description: The successful widespread commercialization of aquifer thermal energy storage (ATES) in the United States will depend on how experiences gained from early full-scale projects are used as guides in the design, installation, and operation of future projects. One early system, built in the mid-1980s, is the US Postal Service (USPS) Mid-Island Mail Processing Facility (MPF), in Melville, New York. The heating, ventilation, and air conditioning (HVAC) of the MPF`s workroom is provided by an ATES sys… more
Date: May 1993
Creator: Marseille, T. J.; Armstrong, P. R.; Brown, D. R.; Vail, L. W. & Kannberg, L. D.
Partner: UNT Libraries Government Documents Department
open access

Thermal Shock Experiment (TSEX): a ''proof-of-principle'' evaluation of the use of electron beam heating to simulate the thermal mechanical environment anticipated for the first wall of the Reference Theta-Pinch Reactor (RTPR)

Description: The results of a ''proof-of-principle'' Thermal Shock Experiment (TSEX), designed to simulate the thermal mechanical response of insulator-metal composite first walls anticipated for pulsed high-density fusion reactors, are given. A programmable 10-kV, 1.0-A electron beam was used to pulse repeatedly (0.30-mm)Al/sub 2/O/sub 3//(1.0-mm) Nb-1Zr composite samples 200 to 300 K, relative to a base-line temperature of 1000 K. The experimental goals of TSEX were established relative to the first-wall … more
Date: June 1, 1977
Creator: Armstrong, P. E. & Krakowski, R. A.
Partner: UNT Libraries Government Documents Department
open access

Griffiss AFB integrated resource assessment. Volume 2, Electric baseline detail

Description: The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-ef… more
Date: February 1, 1993
Creator: Dixon, D. R.; Armstrong, P. R. & Keller, J. M.
Partner: UNT Libraries Government Documents Department
open access

Market Brief: Status of the Voluntary Renewable Energy Certificate Market (2011 Data)

Description: This report documents the status and trends of U.S. 'voluntary' markets -- those in which consumers and institutions purchase renewable energy to match their electricity needs on a voluntary basis. Voluntary REC markets continue to exhibit growth and spur renewable energy development. Voluntary green power markets provide an additional revenue stream for renewable energy projects and raise consumer awareness of the benefits of renewable energy. Although a full estimate of the size of the volunt… more
Date: September 1, 2012
Creator: Heeter, J.; Armstrong, P. & Bird, L.
Partner: UNT Libraries Government Documents Department
open access

Fort Drum integrated resource assessment

Description: The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develo… more
Date: December 1, 1992
Creator: Dixon, D. R.; Armstrong, P. R.; Brodrick, J. R.; Daellenbach, K. K.; Di Massa, F. V.; Keller, J. M. et al.
Partner: UNT Libraries Government Documents Department
open access

Inspection and assessment of energy conservation opportunities at Ellis Island National Park, Ellis Island, New York

Description: Ellis Island is a National Park Service (NPS) facility located in New York Harbor that hosts two million visitors per year. The main building houses exhibits and artifacts, food and gift concessions, and staff work and office spaces in a 200,000-square-foot floor area. Heating and cooling of the main building are provided by a central heating and cooling plant, housed in an adjacent 20,000-square-foot building, with distribution by nine main fan systems and perimeter radiators. Energy end-use e… more
Date: December 1, 1992
Creator: Armstrong, P. R.; Parker, G. B. & Richman, E. E.
Partner: UNT Libraries Government Documents Department
open access

Energy end-use metering in two modular office buildings at Fort Irwin, California

Description: This report documents the application of the Mobile Energy Laboratory (MEL) at Fort Irwin for the period 21 December 1989 to 27 January 1992. The purpose of the test was to monitor electrical demands in Buildings 567 and 571 by end use and to monitor the response of the HVAC systems to internal and external loads. Results of two years of monitoring are summarized below. The observed energy-use intensities (EUIs) were 13.7 kWh/ft{sup 2}-yr for Building 567 and 10.4 kWh/ft{sup 2}-yr for Building … more
Date: January 1, 1994
Creator: Armstrong, P. R. & Keller, J. M.
Partner: UNT Libraries Government Documents Department
open access

Fort Drum integrated resource assessment. Volume 2, Baseline detail

Description: The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develo… more
Date: December 1, 1992
Creator: Dixon, D. R.; Armstrong, P. R.; Brodrick, J. R.; Daellenbach, K. K.; Di Massa, F. V.; Keller, J. M. et al.
Partner: UNT Libraries Government Documents Department
open access

Mobile Energy Laboratory Procedures

Description: Pacific Northwest Laboratory (PNL) has been tasked to plan and implement a framework for measuring and analyzing the efficiency of on-site energy conversion, distribution, and end-use application on federal facilities as part of its overall technical support to the US Department of Energy (DOE) Federal Energy Management Program (FEMP). The Mobile Energy Laboratory (MEL) Procedures establish guidelines for specific activities performed by PNL staff. PNL provided sophisticated energy monitoring, … more
Date: September 1, 1993
Creator: Armstrong, P. R.; Batishko, C. R.; Dittmer, A. L.; Hadley, D. L. & Stoops, J. L.
Partner: UNT Libraries Government Documents Department
open access

Griffiss Air Force Base integrated resource assessment. Volume 3, Electric resource assessment

Description: The US Air Force Air Combat Command (ACC) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP) to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). FEMP, with support from the Pacific Northwest Laboratory (PNL), is designing this model program for federal customers served by the Niagara Mohawk Power Company. The program with Griffiss AFB will (1) identify and evaluate all cost-effective electric ener… more
Date: September 1, 1993
Creator: Armstrong, P. R.; Shankle, S. A.; Elliott, D. B.; Stucky, D. J.; Keller, J. M.; Wahlstrom, R. R. et al.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen