2 Matching Results

Search Results

Field Demonstration of Carbon Dioxide Miscible Flooding in the Lansing-Kansas City Formation, Central Kansas Progress Report

Description: A pilot carbon dioxide miscible flood was initiated in the Lansing Kansas City C formation in the Hall Gurney Field, Russell County, Kansas. Continuous carbon dioxide injection began on December 2, 2003. By the end of June 2004, 6.26 MM lb of carbon dioxide were injected into the pilot area. Carbon dioxide injection rates averaged about 250 MCFD. Carbon dioxide was detected in one production well near the end of May. The amount of carbon dioxide produced was small during this period. Wells in the pilot area produced 100% water at the beginning of the flood. Oil production began in February, increasing to an average of about 2.5 B/D in May and June. Operational problems encountered during the initial stages of the flood were identified and resolved.
Date: June 30, 2004
Creator: Byrnes, Alan; Willhite, G. Paul; Green, Don; Dubois, Martin; Pancake, Richard; Carr, Timothy et al.
Partner: UNT Libraries Government Documents Department

Field Demonstration of Carbon Dioxide Miscible Flooding in the Lansing-Kansas City Formation, Central Kansas Progress Report

Description: Progress is reported for the period from April 1, 2003 to June 30, 2003. The pilot water injection plant became operational 4/18/03 and began long-term injection in the CO2I No.1 on 4/23/03. The CO2I No.1 exhibits sufficient injectivity for pilot requirements with average absolute permeability surrounding this well equal to {approx}85 millidarcies. Response to injection in the CO2I No.1 has established that conductivity between CO2I No.1 and CO2 No.12, No.10, No.18 and TB Carter No.5 is sufficient for the demonstration. Workovers of the CO2 No.16 and CO2 No.13 were completed in April and May, respectively. Pressure response indicates No.16 communicates with the flood pattern area but core, swab-test, and pressure response data indicate permeability surrounding No.16 is not adequate to maintain the production rates needed to support the original pattern as the well is presently completed. Decisions concerning possible further testing and stimulation have been postponed until after testing of the No.13 is complete. Production rates for the No.13 are consistent with a surrounding reservoir average absolute permeability of {approx}80 md. However, pressure and rate tests results, partially due to the nature of the testing conducted to date, have not confirmed the nature of the CO2I No.1-CO2 No.13 conductivity. A build-up test and conductivity test are planned to begin the first weeks of the next quarter to obtain reservoir properties data and establish the connectivity and conductivity between CO2 I-1 and CO2 No.13. A new geomodel of the pattern area has been developed based on core from No.16 and the new wireline logs from the No.10, No.12, No.16, and No.13. The new geomodel is currently being incorporated into the basic calculations of reservoir volume and flood design and predicted response as well as the reservoir simulators. Murfin signed a letter agreement with FLOCO2 of Odessa, TX for supply of CO2 ...
Date: June 30, 2003
Creator: Byrnes, Alan; Willhite, G. Paul; Green, Don; Dubois, Martin; Pancake, Richard; Carr, Timothy et al.
Partner: UNT Libraries Government Documents Department