Search Results

open access

Operation of Pilot Plant LTV Evaporator at Wrightsville Beach, North Carolina

Description: From Introduction: "The primary objective in the development of the W. L. Badger Long Tube Vertical Multiple Effect Evaporator for saline water conversion is to minimize the ultimate cost of producing potable water. To accomplish the primary objective, it is necessary to (1) prevent formation of scale on heating surfaces, and (2) minimize corrosion to permit use of inexpensive materials of construction. The work done leading to this report was guided in the direction of accomplishing the two se… more
Date: December 1959
Creator: W. L. Badger and Associates, Inc.
Partner: UNT Libraries Government Documents Department
open access

VTE Pilot Plant Annual Report for the Period Ending July 1, 1968

Description: From Summary and Conclusions: "After a period of tests at the Oak Ridge National Laboratory in 1966 and 1967, the Vertical Tube Evaporator (VTE) Pilot Plant was moved to the OSW's East Coast Test Station at Wrightsville Beach, N.C. In the summer of 1967 it was installed and was started in upflow operation with seawater feed, using stem and other services provided by the station. The operation of the Pilot Plant at Wrightsville Beach was performed by Stearns-Roger Corporation under subcontract t… more
Date: December 1970
Creator: Hill, John W. & Hise, Eugene C.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen