open access

Specifications for WAPD Loop

Description: Specifications for the proposed in-pile loop to be placed in the Hanford Reactor. The the purpose of the proposed installation of an irradiation facility accounting to a high pressure, high temperature recirculating loop for the Westinghouse Atomic Power Division (WAPD) is to test the integrity of fuel specimens. This report, in support of the feasibility study, cost estimates, and schedule, presents design specifications for the loop.
Date: February 16, 1955
Creator: Berberet, J. A.
Partner: UNT Libraries Government Documents Department

[Guidelines for a 2x2 slide]

Description: Photograph of a slide specification slide that provides guidelines for a 2x2 slide. There is a black square outline and inside of this is a black rectangle with a smaller rectangle in the middle of it. The short sides of the smaller rectangle are convex, making a round shape. Inside of this rectangle are three vertical and five horizontal grid lines. In the bottom right hand corner of the square outline is text that reads "2x2".
Date: March 11, 1959
Creator: WBAP-TV (Television station : Fort Worth, Tex.)
Partner: UNT Libraries Special Collections

[Slide specification guide]

Description: Photograph of a rectangle that has convex short sides and grid lines in the center. The grid lines are black and there are three vertical and five horizontal lines. All around the rectangle are lines of black dots and around these lines is a white background.
Date: March 11, 1959
Creator: WBAP-TV (Television station : Fort Worth, Tex.)
Partner: UNT Libraries Special Collections
open access

A Systematic Procedure for Preparing Specifications on Electronic Instrumentation and Control Systems

Description: Abstract. A systematic procedure for preparing purchase specification on electronic instrumentation or control systems has been developed. This procedure results in preparation of specifications which: 1) make it possible to find any particular specification requirement quickly; and 2) insure that no important requirement has been omitted. Details of this systematic specification preparing procedure presented.
Date: February 4, 1960
Creator: Olken, Hyman
Partner: UNT Libraries Government Documents Department
open access

Reactor Grade Zircaloy-2 Ingot

Description: Scope. This specification covers ingots of zirconium alloy designated as Zircaloy-2, and intended for the production of reactor components.
Date: July 15, 1960
Creator: Perryman, E. C. W.
Partner: UNT Libraries Government Documents Department
open access

Reactor-Grade Zircaloy-4 Ingot

Description: Scope. This specification covers ingots of zirconium alloy designated as Zircaloy-4, and intended for the production of reactor components.
Date: July 15, 1960
Creator: Perryman, E. C. W.
Partner: UNT Libraries Government Documents Department
open access

Zircaloy-2 Sheet and Strip Material

Description: Scope. This specification covers Zircalogy-2 sheet and strip material for reactor use where high integrity and satisfactory corrosion resistance at elevated temperatures are quired.
Date: July 15, 1960
Creator: Perryman, E. C. W.
Partner: UNT Libraries Government Documents Department
open access

Zircaloy-2 Tubing for Fuel Sheathing

Description: Scope. This specification covers Zircaloy-2 tubing, both seamless and welded, for reactor fuel rod sheathing where high integrity, and satisfactory corrosion resistance at elevated temperatures ae required.
Date: July 15, 1960
Creator: Perryman, E. C. W.
Partner: UNT Libraries Government Documents Department
open access

Zircaloy-2 Wire Material

Description: Scope. This specification covers Zircaloy-2 wire material for reactor use where high integrity and satisfactory corrosion resistance at elevated temperatures are required.
Date: July 15, 1960
Creator: Perryman, E. C. W.
Partner: UNT Libraries Government Documents Department
open access

Zircaloy-4 Sheet and Strip Material

Description: Scope. This specification covers Zircaloy-4 sheet and strip material for reactor use where high integrity and satisfactory corrosion resistance at elevated temperatures are required.
Date: July 15, 1960
Creator: Perryman, E. C. W.
Partner: UNT Libraries Government Documents Department
open access

Zircaloy-4 Wire Material

Description: Scope. This specification covers Zircaloy-4 wire material for reactor use where high integrity and satisfactory corrosion resistance at elevated temperatures are required.
Date: July 15, 1960
Creator: Perryman, E. C. W.
Partner: UNT Libraries Government Documents Department
open access

ABWR: PL-2 Design Report

Description: From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Date: October 15, 1960
Creator: Combustion Engineering, inc. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

Resistance Measurements To 400 Kilobars

Description: A modification of the Bridgeman anvils is described. This modification permits studies to be made to a load of 400 kbars, about twice that previously available.
Date: November 8, 1960
Creator: Vaisnys, Juozas; Stromberg, Harold & Jura, George
Partner: UNT Libraries Government Documents Department

Zircaloy-4 Tubing for Fuel Sheathing

Description: Scope. This specification covers Zircaloy-4 tubing, both seamless and welded, for reactor fuel rod sheathing where high integrity, and satisfactory corrosion resistance at elevated temperatures are required.
Date: unknown
Creator: Perryman, E. C. W.
Partner: UNT Libraries Government Documents Department
open access

Technical Proposal Salton Sea Geothermal Power Pilot Plant Program

Description: The proposed Salton Sea Geothermal Power Pilot Plant Program comprises two phases. The objective of Phase 1 is to develop the technology for power generation from high-temperature, high-salinity geothermal brines existing in the Salton Sea known geothermal resources area. Phase 1 work will result in the following: (a) Completion of a preliminary design and cost estimate for a pilot geothermal brine utilization facility. (b) Design and construction of an Area Resource Test Facility (ARTF) in whi… more
Date: March 28, 1975
Partner: UNT Libraries Government Documents Department
open access

Advanced subsystems development. Second semi-annual progress report, April 1--October 1, 1978

Description: The concept design for a small (less than 10 MWe) solar thermal electric generating plant was completed using projected 1985 technology. The systems requirements were defined and specified. The components, including an engineering prototype for one 15 kWe module of the generating plant, were conceptually designed. Significant features of the small solar thermal power plant were identified as the following: (1) 15-kWe Stirling-cycle engine/alternator with constant power output; (2) 10-meter poin… more
Date: November 15, 1978
Partner: UNT Libraries Government Documents Department
open access

Problems of hydroelectric development at existing dams: an analysis of institutional, economic, and environmental restraints in Pennsylvania, New Jersey, and Maryland

Description: The methodology that has been developed to analyze the impact of possible government actions on the development of small-scale hydroelectric power in the United States is described. The application of the methodology to a specific region of the United States is also described. Within the Pennsylvania-New Jersey-Maryland (PJM) region, the methodology has been used to evaluate the significance of some of the existing institutional and economic constraints on hydroelectric development at existing … more
Date: April 1, 1979
Creator: Taylor, R. J. & Green, L. L.
Partner: UNT Libraries Government Documents Department
captions transcript

[News Clip: Bad oil]

Description: Video footage from the KXAS-TV/NBC station in Fort Worth, Texas, to accompany a news story.
Date: January 14, 1980, 5:00 p.m.
Duration: 1 minute 36 seconds
Creator: KXAS-TV (Television station : Fort Worth, Tex.)
Partner: UNT Libraries Special Collections
open access

Energy conservation in citrus processing. Technical progress report No. 2, April 1, 1980-February 28, 1981

Description: Systems that reduce energy usage and are economically viable in the citrus fruit processing industry are identified. The preliminary results of Phase I are presented. Alternative systems to be considered are classified and denoted as central, modular, integrated, and combined. Progress is reported on the central and modular systems. (MCW)
Date: March 15, 1981
Creator: Leo, M. A.; Lari, R. I.; Moore, N. R.; Broussard, M. R. & Gyamfi, M.
Partner: UNT Libraries Government Documents Department
open access

Evaluation and verification of epitaxial process sequence for silicon solar-cell production. Final program summary report

Description: Progress, present status, and data are presented for work in the areas of silicon substrate materials epitaxial substrates and epitaxial growth and of solar cells production process sequence determination especially, and also in the areas of process specification, minimodule design, process and design verification, and cost evaluation and projections. (LEW)
Date: November 1, 1981
Creator: Redfield, D.
Partner: UNT Libraries Government Documents Department
open access

SP-100 system definition conceptual reference design activities: February through June 1983. Technical information report

Description: The original SP-100 conceptual system design was examined from the mechanical design and integration viewpoint for the purpose of updating the design, identifying concerns, and providing recommendations for future work. Some of the findings were that: Integration of heat pipes into the radiator structure appears practical, but a number of problems remain to be addressed and resolved through development effort; thermal and structural interfacing of the shield and defining shield weight are key a… more
Date: December 1, 1983
Creator: Fortenberry, J. W.; Moore, D. M.; Petrick, S. W. & Smoak, R. H.
Partner: UNT Libraries Government Documents Department
captions transcript

[News Clip: Jetta gli road test]

Description: Video footage from the KXAS-TV/NBC station in Fort Worth, Texas, to accompany a news story. This story aired at 5 P.M.
Date: January 17, 1986
Duration: 2 minutes 49 seconds
Creator: KXAS-TV (Television station : Fort Worth, Tex.)
Partner: UNT Libraries Special Collections
captions transcript

[News Clip: Sprint road test]

Description: B-roll video footage from the KXAS-TV/NBC station in Fort Worth, Texas, to accompany a news story.
Date: January 31, 1986, 5:00 p.m.
Duration: 2 minutes 26 seconds
Creator: KXAS-TV (Television station : Fort Worth, Tex.)
Partner: UNT Libraries Special Collections
open access

SP-100 program users handbook basic configurational tradeoffs

Description: This document addresses basic configurational tradeoffs associated with the SP-100 class of nuclear space power systems. In the SP-100 project, the three reference designs, fallback, baseline, and advanced, employ thermoelectric power conversion with different thermoelectric materials. This issue of the document presents results generated for the thermoelectric design as of the end of 1985. Emphasis is placed on showing general trends and the range of possibilities that could result from select… more
Date: March 15, 1986
Creator: Manvi, R. & Fujita, T.
Partner: UNT Libraries Government Documents Department