Advanced coal-fueled industrial cogeneration gas turbine system

Description: Advances in coal-fueled gas turbine technology over the past few years, together with recent DOE-METC sponsored studies, have served to provide new optimism that the problems demonstrated in the past can be economically resolved and that the coal-fueled gas turbine can ultimately be the preferred system in appropriate market application sectors. The objective of the Solar/METC program is to prove the technical, economic, and environmental feasibility of a coal-fired gas turbine for cogeneration… more
Date: July 1, 1991
Creator: LeCren, R. T.; Cowell, L. H.; Galica, M. A.; Stephenson, M. D. & Wen, C. S.
Partner: UNT Libraries Government Documents Department
open access

Advanced coal-fueled industrial cogeneration gas turbine system. Annual report, June 1990--June 1991

Description: Advances in coal-fueled gas turbine technology over the past few years, together with recent DOE-METC sponsored studies, have served to provide new optimism that the problems demonstrated in the past can be economically resolved and that the coal-fueled gas turbine can ultimately be the preferred system in appropriate market application sectors. The objective of the Solar/METC program is to prove the technical, economic, and environmental feasibility of a coal-fired gas turbine for cogeneration… more
Date: July 1, 1991
Creator: LeCren, R. T.; Cowell, L. H.; Galica, M. A.; Stephenson, M. D. & Wen, C. S.
Partner: UNT Libraries Government Documents Department
open access

Full-scale and bench-scale testing of a coal-fueled gas turbine system

Description: Components for a coal-fueled industrial gas turbine were developed and tested at both benchscale and full-scale. The components included a two stage slagging combustor, a particulate rejection impact separator (PRIS), and a secondary particulate filter. The Integrated Bench Scale Test Facility (IBSTF) was used for the filter tests ana some of the PRIS testing. Full-scale combustor testing has been carried-out both with and without the PRIS. Bench-scale testing has included evaluating the feasib… more
Date: January 1, 1992
Creator: Roberts, P. B.; LeCren, R. T.; Cowell, L. H.; Galica, M. A.; Stephenson, M. D. & Wen, C. S.
Partner: UNT Libraries Government Documents Department
open access

Sub-pilot testing of an acoustically enhanced cyclone for PFBC

Description: The overall program objective is to demonstrate, on the subpilot-scale, the effectiveness of an acoustically enhanced cyclone collector under high temperature, high pressure conditions found in coal-fired pressurized fluidized bed combustion (PFBC) combined cycle power generating systems. The data obtained will be used to design an acoustically enhanced cyclone gas cleanup system which can meet the New Source Performance Standards (NSPS) particulate control level with capital and operating cost… more
Date: January 1, 1992
Creator: Galica, M.A. & Rawlins, D.C.
Partner: UNT Libraries Government Documents Department
open access

High performance steam cogeneration (proof-of-concept phases). Phase 2, HRSG 500-hour test report: Final report

Description: Recent advances in small once-through Alloy 800 steam generators, improved materials technology, and application of small industrial gas turbine technology to steam turbine cogeneration offers the potential to make a step increase in steam temperature from around 1000{degree}F, where industry has been for almost fifty years, to 1500{degree}F. In small cogeneration systems, it is economically practical to introduce new technology and make a step change in temperature where it may not be possible… more
Date: December 1, 1992
Creator: Campbell, A. H.
Partner: UNT Libraries Government Documents Department
open access

Sub-pilot testing of an acoustically enhanced cyclone for PFBC

Description: The overall program objective is to demonstrate, on the subpilot-scale, the effectiveness of an acoustically enhanced cyclone collector under high temperature, high pressure conditions found in coal-fired pressurized fluidized bed combustion (PFBC) combined cycle power generating systems. The data obtained will be used to design an acoustically enhanced cyclone gas cleanup system which can meet the New Source Performance Standards (NSPS) particulate control level with capital and operating cost… more
Date: December 1, 1992
Creator: Galica, M. A. & Rawlins, D. C.
Partner: UNT Libraries Government Documents Department
open access

Full-scale and bench-scale testing of a coal-fueled gas turbine system

Description: Components for a coal-fueled industrial gas turbine were developed and tested at both benchscale and full-scale. The components included a two stage slagging combustor, a particulate rejection impact separator (PRIS), and a secondary particulate filter. The Integrated Bench Scale Test Facility (IBSTF) was used for the filter tests ana some of the PRIS testing. Full-scale combustor testing has been carried-out both with and without the PRIS. Bench-scale testing has included evaluating the feasib… more
Date: December 31, 1992
Creator: Roberts, P. B.; LeCren, R. T.; Cowell, L. H.; Galica, M. A.; Stephenson, M. D. & Wen, C. S.
Partner: UNT Libraries Government Documents Department
open access

Gas fired Advanced Turbine System

Description: The primary objective of the first phase of the Advanced Gas Turbine System (ATS) program was the concept definition of an advanced engine system that meets efficiency and emission goals far exceeding those that can be provided with today`s equipment. The thermal efficiency goal for such an advanced industrial engine was set at 50% some 15 percentage points higher than current equipment levels. Exhaust emissions goals for oxides of nitrogen (NO{sub x}), carbon monoxide (CO), and unburned hydroc… more
Date: January 1, 1993
Creator: LeCren, R. T. & White, D. J.
Partner: UNT Libraries Government Documents Department
open access

Advanced coal-fueled industrial cogeneration gas turbine system. Annual report, 2 June 1992--1 June 1993

Description: This program was initiated in June of 1986 because advances in coal-fueled gas turbine technology over the previous few years, together with DOE-METC sponsored studies, served to provide new optimism that the problems demonstrated in the past can be economically resolved and that the coal-fueled gas turbine could ultimately be the preferred system in appropriate market application sectors. In early 1991 it became evident that a combination of low natural gas prices, stringent emission limits of… more
Date: June 1, 1993
Creator: LeCren, L. T.; Cowell, L. H.; Galica, M. A.; Stephenson, M. D. & Wen, C. S.
Partner: UNT Libraries Government Documents Department
open access

Gas fired advanced turbine system. Phase 1, System scoping and feasibility studies

Description: The basic concept thus derived from the Ericsson cycle is an intercooled, recuperated, and reheated gas turbine. Theoretical performance analyses, however, showed that reheat at high turbine rotor inlet temperatures (TRIT) did not provide significant efficiency gains and that the 50 percent efficiency goal could be met without reheat. Based upon these findings, the engine concept adopted as a starting point for the gas-fired advanced turbine system is an intercooled, recuperated (ICR) gas turbi… more
Date: November 1, 1993
Creator: LeCren, R. T. & White, D. J.
Partner: UNT Libraries Government Documents Department
open access

Advanced turbine systems program: Conceptual design and product development. Topical report, November 1993

Description: This report has been prepared by Solar Turbines Incorporated (Solar) in accordance with Task 2 of the Advanced Turbine Systems (ATS) Contract. This report addresses only the work that will be performed under Task 8 (Design and Test of Critical Components) of the Contract. The discussion is divided into four general sections: Project Description; Potential Environmental Impacts; Required Permits and Licenses; and Environmental, Safety and Health (ES and H) Agency Contact Information. As describe… more
Date: January 1, 1994
Creator: Wilken, L. S.
Partner: UNT Libraries Government Documents Department
open access

Advanced coal-fueled industrial cogeneration gas turbine system: Hot End Simulation Rig

Description: This Hot End Simulation Rig (HESR) was an integral part of the overall Solar/METC program chartered to prove the technical, economic, an environmental feasibility of a coal-fueled gas turbine, for cogeneration applications. The program was to culminate in a test of a Solar Centaur Type H engine system operated on coal slurry fuel throughput the engine design operating range. This particular activity was designed to verify the performance of the Centaur Type H engine hot section materials in a c… more
Date: February 1, 1994
Creator: Galica, M. A.
Partner: UNT Libraries Government Documents Department
open access

Advanced Turbine Systems Program conceptual design and product development. Quarterly report, [August 3, 1993--October 31, 1993]

Description: This Quarterly Technical Progress Report covers the period August 3 through October 31, 1993, for Phase II of the Advanced Turbine Systems (ATS) Program by Solar Turbines Incorporated under DOE Contract No. DE-AC21-93MC30246. The objective of this program is to provide the conceptual design and product development plan for an industrial gas turbine system to operate at a thermal efficiency of 50 percent and developable to 60 percent. Solar`s ATS Engine Design Team reviewed the intercooled and r… more
Date: February 1, 1994
Creator: Karstensen, K. W.
Partner: UNT Libraries Government Documents Department
open access

Advanced coal-fueled industrial cogeneration gas turbine system particle removal system development

Description: Solar Turbines developed a direct coal-fueled turbine system (DCFT) and tested each component in subscale facilities and the combustion system was tested at full-scale. The combustion system was comprised of a two-stage slagging combustor with an impact separator between the two combustors. Greater than 90 percent of the native ash in the coal was removed as liquid slag with this system. In the first combustor, coal water slurry mixture (CWM) was injected into a combustion chamber which was ope… more
Date: March 1, 1994
Creator: Stephenson, M.
Partner: UNT Libraries Government Documents Department
open access

Advanced coal fueled industrial cogeneration gas turbine system. Final report, June 1986--April 1994

Description: Demonstration of a direct coal-fueled gas turbine system that is environmentally, technically, and economically viable depends on the satisfactory resolution of several key issues. Solar Turbines, Incorporates technical approach to these issues was to advance a complete direct coal-fueled gas turbine system that incorporated near-term technology solutions to both historically demonstrated problem areas such as deposition, erosion, and hot end corrosion, and to the emergent environmental constra… more
Date: May 1, 1994
Creator: LeCren, R. T.
Partner: UNT Libraries Government Documents Department
open access

Advanced coal-fueled industrial cogeneration gas turbine system -- combustion development

Description: This topical report summarizes the combustor development work accomplished under the subject contract. The objective was to develop a combustion system for the Solar 4MW Type H Centaur gas turbine generator set which was to be used to demonstrate the economic, technical and environmental feasibility of a direct coal-fueled gas turbine in a 100 hour proof-of-concept test. This program started with a design configuration derived during the CSC program. The design went through the following evolut… more
Date: June 1, 1994
Creator: LeCren, R. T.
Partner: UNT Libraries Government Documents Department
open access

Advanced Turbine Systems Program: Conceptual design and product development. Quarterly report, February--April 1994

Description: Objective (Phase II) is to develop an industrial gas turbine system to operate at a thermal efficiency of 50% (ATS50) with efficiency enhancements to be added as they become possible. During this quarter, Solar`s engine design team has refined both the 1- and 2-spool cycle concepts, to determine sensitivity to key component efficiencies, cooling air usage and origin, and location of compressor surge lines. The refined analysis included more detailed component work such as compressor and turbine… more
Date: June 1, 1994
Creator: Benjamin, G. J.
Partner: UNT Libraries Government Documents Department
open access

Advanced Turbine Systems Program conceptual design and product development. Quarterly report, November 1993--January 1994

Description: This Quarterly Technical Progress Report covers the period November 1, 1993, through January 31, 1994, for Phase 11 of the Advanced Turbine Systems (ATS) Program by Solar Turbines Incorporated under DOE Contract No. DE-AC421-93MC30246. The objective of this program is to provide the conceptual design and product development plan for an industrial gas turbine system to operate at a thermal efficiency of 50 percent ({open_quotes}ATS50{close_quotes}) with future improvement to 60 percent ({open_qu… more
Date: June 1, 1994
Creator: Karstensen, K. W.
Partner: UNT Libraries Government Documents Department
open access

Advanced turbine systems program conceptual design and product development. Task 3 -- System selection; Topical report

Description: Solar Turbines Incorporated has elected to pursue an intercooled and recuperated (ICR) gas turbine system to exceed the goals of the DOE Advanced Turbine Systems (ATS) program, which are to develop and commercialize an industrial gas turbine system that operates at thermal efficiencies at least 15% higher than 1991 products, and with emissions not exceeding eight ppmv NOx and 20 ppmv CO and UHC. Solar`s goal is to develop a commercially viable industrial system (3--20 MW) driven by a gas turbin… more
Date: July 1, 1994
Creator: White, D. J.
Partner: UNT Libraries Government Documents Department
open access

Advanced Turbine Systems Program: Conceptual design and product development

Description: Objective is to provide the conceptual design and product development plant for an ultra high efficiency, environmentally superior, and cost competitive industrial gas turbine system to be commercialized by the year 2000 (secondary objective is to begin early development of technologies critical to the success of ATS). This report addresses the remaining 7 of the 9 subtasks in Task 8, Design and Test of Critical Components: catalytic combustion, recuperator, high- temperature turbine disc, adva… more
Date: December 31, 1996