Search Results

open access

PAR Loop Schedule Review

Description: The schedule for the installation of the PAR slurry loop experiment in the South Facility of the ORR has been reviewed and revised. The design, fabrication, and installation is approximately two weeks behind schedule at this time due to many factors; however, indications are that this time can be made up. Design is estimated to be 56 per cent complete, fabrication 27 per cent complete-and installation 11 per cent complete:
Date: March 31, 0958
Creator: Schaffer, Jr. & W.F.
Partner: UNT Libraries Government Documents Department
open access

Three-dimensional Numerical Investigation of Electron Transport with Rotating Spoke in a Cylindrical Anode Layer Hall Plasma Accelerator

Description: The oscillation behavior described in [Tang et. al, Phys. Plasmas 19, 073519 (2012)] di ers too greatly from previous experimental and numerical studies to claim observation of the same phenomenon. Most signi cantly, the rotation velocity in [Tang et. al, Phys. Plasmas 19, 073519 (2012)] is three orders of magnitude larger than that of typical \rotating spoke" phenomena. Several physical and numerical considerations are presented to more accurately understand the numerical results of [Tang… more
Date: August 27, 1012
Creator: Ellison, C. Leland; Matyash, K.; Parker, J. B.; Raitses, Y. & Fisch, N. J.
Partner: UNT Libraries Government Documents Department
open access

The Precipitation of Uranium Peroxide in the Presence of Fluorides

Description: The large-scale recovery of uranium from materials which also contained great quantities of fluorides did not give a product which had a low enough fluoride content to be treated satisfactorily by the other extraction process. The objective of the investigations carried out in this laboratory was a method of reducing the amount of fluoride which accompanied the uranium. The material from which the uranium was recovered in the industrial process was a slag containing (in addition to uranium) mag… more
Date: January 1, 1941
Creator: King, Edward J.
Partner: UNT Libraries Government Documents Department
open access

Chemical Properties of Uranium Hexafluoride, UF6

Description: Uranium hexafluoride has the distinction of being the only stable gaseous compound of uranium known up to the present moment. Because of this property it is the only compound that can be used for processes of isotope separation, such as diffusion, thermal diffusion, centrifuge separation, distillation, and other of a similar nature. Here is a short description of the properties of UF{sub 6} and is intended for a reader interested only casually in this compound. UF{sub 6} is a very reactive comp… more
Date: June 25, 1941
Creator: Grosse, Aristid V.
Partner: UNT Libraries Government Documents Department
open access

Establishing Site X: Letter, Arthur H. Compton to Enrico Fermi, September 14, 1942

Description: This letter from Compton to Fermi describes developments bearing on the establishment of ``site X`` (which, as of the letter date, is definitely determined as at the Tennessee Valley) for the construction of a pile and associated pilot plant buildings, describes the situation as of the letter date, and offers counsel as to how to proceed.
Date: September 14, 1942
Creator: Compton, A. H.
Partner: UNT Libraries Government Documents Department
open access

Theory of High Frequency Rectification by Silicon Crystals

Description: The excellent performance of British ''red dot'' crystals is explained as due to the knife edge contact against a polished surface. High frequency rectification depends critically on the capacity of the rectifying boundary layer of the crystal. C. For high conversion efficiency, the product of this capacity and of the ''forward'' (bulk) resistance R{sub b} of the crystal must be small. For a knife edge, this product depends primarily on the breadth of the knife edge and very little upon its len… more
Date: October 29, 1942
Creator: Bethe, H. A.
Partner: UNT Libraries Government Documents Department
open access

The Production of Uranium Metal by Metal Hydrides Incorporated

Description: Metal Hydrides Incorporated was a pioneer in the production of uranium metal on a commercial scale and supplied it to all the laboratories interested in the original research, before other methods for its production were developed. Metal Hydrides Inc. supplied the major part of the metal for the construction of the first experimental pile which, on December 2, 1942, demonstrated the feasibility of the self-sustaining chain reaction and the release of atomic energy.
Date: January 1, 1943
Creator: Alexander, P. P.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen