540 Matching Results

Search Results

Advanced search parameters have been applied.
Primary view of P Division monthly report, September 1949
Lee, E.P.
October 6, 1949
Primary view of Compilation of data on 51 ruptured slugs
O'Keefe, D.P.
October 4, 1951
Primary view of Removal of ruptured uranium slug from tube No. 3964-B
Koop, W.N.
October 9, 1951
Primary view of Removal of ruptured P-10 target slug from tube. number sign. 2964-H, and ruptured regular slug from tube. number sign. 3684-H
Zweifel, H.A.
October 15, 1951
Primary view of Removal of ruptured slug from tube 2465-D
Snyder, F.A.
October 15, 1951
Primary view of Removal of ruptured slug from tubes 1860-D, 1479-D and 1766-D
unknown creator
October 15, 1951
Primary view of Removal of ruptured uranium slug from tube No. 4374-B
Koop, W.N.
October 15, 1951
Primary view of Removal of ruptured heavy metal slug from tube No. 2867-F
Hall, T.M.
October 23, 1951
Primary view of Removal of ruptured slug from tube 3276-DR
unknown creator
October 29, 1951
Primary view of Removal of ruptured uranium slug from tube No. 3491-H
O'Sullivan, E.T.
October 30, 1951
Primary view of Special hazards report - I E fuel loads
Brown, J.H.; Fullmer, G.C.; Trumble, R.E. & VanWormer, F.W.
October 15, 1957
Primary view of Pressurized Water Reactor Program Technical Progress Report for the Period July 15, 1954 to August 26, 1954
unknown creator
October 31, 1957
Primary view of Tests to determine effect of humidity on high-efficiency filters when installed horizontally
Palmer, J.H.
October 4, 1960
Primary view of Radiation damage study on the lithium hydride SNAP shield
Doctor, R.D.
October 4, 1961
Primary view of Presentation to the Atomic Energy Commission and the Air Force, June 14, 1962
unknown creator
October 1, 1962
Primary view of Tensile and stress rupture tests of S8DR Hastelloy-N heats: ORNL verification tests
Lee, S.K.
October 5, 1967
Primary view of FAST FLUX TEST FACILITY. Design and development quality assurance requirements for the FFTF
Albert, W.G.
October 23, 1968
Primary view of Dissipation of the reactor heat at the Savannah River Plant
Neill, J.S. & Babcock, D.F.
October 1, 1971
Primary view of Facility requirements document: NRDS test cell C single NERVA turbopump facility
unknown creator
October 1, 1971
Primary view of Characterization of an energy source for modeling hypothetical core disruptive accidents in nuclear reactors. First interim report. [LMFBR]
Cagliostro, D J & Florence, A L
October 1, 1972
Primary view of Superheater hydraulic model test plan
Gabler, M. & Oliva, R.M.
October 1, 1973
Primary view of AI reference LMFBR steam-generator development
Anderson, T.L.
October 12, 1973
Primary view of FFTF report: drilled-in expansion bolts under static and alternating load
Tsang, H.S.
October 1, 1976
Primary view of Analysis of homogeneous U233 and U235 critical assemblies with ENDF/B-IV data (AWBA development program)
Ullo, J.J. & Hardy, J. Jr.
October 1, 1977