Integrated test schedule for buried waste integrated demonstration

Description: The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ``windows of opportunity`` schedule. The ``windows of opportunity`` schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M.
Date: May 1, 1992
Creator: Brown, J. T. & McDonald, J. K.
Partner: UNT Libraries Government Documents Department

Integrated test schedule for buried waste integrated demonstration

Description: The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration windows of opportunity'' schedule. The windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M.
Date: May 1, 1992
Creator: Brown, J.T. & McDonald, J.K.
Partner: UNT Libraries Government Documents Department

Interfacial Reduction-Oxidation Mechanisms Governing Fate and Transport of Contaminants in the Vadose Zone

Description: There are many soil contamination sites at the Department of Energy (DOE) installations that contain radionuclides and toxic metals such as uranium (U), technetium (Tc), and chromium (Cr). Since these contaminants are the main 'risk drivers' at the Hanford site (WA) and some of them also pose significant risk at other DOE facilities (e.g., Oak Ridge Reservation - TN; Rocky Flats - CO), development of technologies for cost effective site remediation is needed. Current assessment indicates that complete removal of these contaminants for ex-situ disposal is infeasible, thus in-situ stabilization through reduction to insoluble species is considered one of the most important approaches for site remediation. In Situ Gaseous Reduction (ISGR) is a technology developed by Pacific Northwest National Laboratory (PNNL) for vadose zone soil remediation. The ISGR approach uses hydrogen sulfide (H{sub 2}S) for reductive immobilization of contaminants that show substantially lower mobility in their reduced forms (e.g., Tc, U, and Cr). The technology can be applied in two ways: (i) to immobilize or stabilize pre-existing contaminants in the vadose zone soils by direct H{sub 2}S treatment, or (ii) to create a permeable reactive barrier (PRB) that prevents the migration of contaminants. Direct treatment involves reduction of the contaminants by H{sub 2}S to less mobile species. Formation of a PRB is accomplished through reduction of ferric iron species in the vadose zone soils by H{sub 2}S to iron sulfides (e.g., FeS), which provides a means for capturing the contaminants entering the treated zone. Potential future releases may occur during tank closure activities. Thus, the placement of a permeable reactive barrier by ISGR treatment can be part of the leak mitigation program. Deployment of these ISGR approaches, however, requires a better understanding of the immobilization kinetics and mechanisms, and a better assessment of the long-term effectiveness of treatment. The primary ...
Date: May 12, 2008
Creator: Deng, Baolin; Jurisson, Silvia Sabine; Thornton, Edward C. & Terry, Jeff
Partner: UNT Libraries Government Documents Department

Effective porosity and pore-throat sizes of mudrock saprolite from the Nolichucky Shale within Bear Creek Valley on the Oak Ridge Reservation: Implications for contaminant transport and retardation through matrix diffusion

Description: Specimens of saprolite developed from mudrock of the Nolichucky Shale (Upper Cambrian, Conasauga Group) from the Whiteoak Mountain thrust sheet on the Oak Ridge Reservation (ORR) were analyzed. Petrophysical techniques include helium porosimetry and mercury porosimetry. Petrophysical data obtained from the laboratory experiments include effective porosity, pore-throat sizes and their distribution, specimen bulk-density, and specimen grain-density. It is expected that the data from this study will significantly contribute to constraining the modeling of the hydrologic behavior of saprolite developed from mudrock of the Conasauga Group in general and from the Nolichucky Shale specifically.
Date: May 1, 1996
Creator: Dorsch, J. & Katsube, T.J.
Partner: UNT Libraries Government Documents Department

Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

Description: The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.
Date: May 1, 1994
Creator: Early, T. O.
Partner: UNT Libraries Government Documents Department

Waste area grouping 2 Phase I task data report: Ecological risk assessment and White Oak Creek watershed screening ecological risk assessment

Description: This report presents an ecological risk assessment for Waste Area Grouping (WAG) 2 based on the data collected in the Phase I remedial investigation (RI). It serves as an update to the WAG 2 screening ecological risk assessment that was performed using historic data. In addition to identifying potential ecological risks in WAG 2 that may require additional data collection, this report serves to determine whether there are ecological risks of sufficient magnitude to require a removal action or some other expedited remedial process. WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the Oak Ridge National Laboratory (ORNL) main plant area, White Oak Lake (WOL), the White Oak Creek Embayment of the Clinch River, associated flood plains, and the associated groundwater. The WOC system drains the WOC watershed, an area of approximately 16.8 km{sup 2} that includes ORNL and associated WAGs. The WOC system has been exposed to contaminants released from ORNL and associated operations since 1943 and continues to receive contaminants from adjacent WAGs.
Date: May 1, 1996
Creator: Efroymson, R. A.; Jackson, B. L. & Jones, D. S.
Partner: UNT Libraries Government Documents Department

Nuisance Wildlife Education and Prevention Plan for the Oak Ridge National Laboratory

Description: This document outlines a plan for management of nuisance wildlife at the Oak Ridge National Laboratory (ORNL). Nuisance wildlife management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; and law enforcement. This plan covers the following subjects: (1) roles and responsibilities of individuals, groups, and agencies; (2) the general protocol for reducing nuisance wildlife problems; and (3) species-specific methodologies for resolving nuisance wildlife management issues for mammals, birds, snakes, and insects. Achievement of the objectives of this plan will be a joint effort between the Tennessee Wildlife Resources Agency (TWRA); U. S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS)-Wildlife Services (WS); and ORNL through agreements between TWRA and the U.S. Department of Energy (DOE); DOE and UT-Battelle, LLC; and UT-Battelle, LLC; and USDA, APHIS-WS.
Date: May 1, 2007
Creator: Giffen, Neil R
Partner: UNT Libraries Government Documents Department

BioSAR Airborne Biomass Sensing System

Description: This CRADA was developed to enable ORNL to assist American Electronics, Inc. test a new technology--BioSAR. BioSAR is a an airborne, low frequency (80-120 MHz {approx} FM radio frequencies) synthetic aperture radar (SAR) technology which was designed and built for NASA by ZAI-Amelex under Patrick Johnson's direction. At these frequencies, leaves and small branches are nearly transparent and the majority of the energy reflected from the forest and returned to the radar is from the tree trunks. By measuring the magnitude of the back scatter, the volume of the tree trunk and therefore the biomass of the trunks can be inferred. The instrument was successfully tested on tropical rain forests in Panama. Patrick Johnson, with American Electronics, Inc received a Phase II SBIR grant from DOE Office of Climate Change to further test and refine the instrument. Mr Johnson sought ORNL expertise in measuring forest biomass in order for him to further validate his instrument. ORNL provided ground truth measurements of forest biomass at three locations--the Oak Ridge Reservation, Weyerhaeuser Co. commercial pine plantations in North Carolina, and American Energy and Power (AEP) Co. hardwood forests in southern Ohio, and facilitated flights over these forests. After Mr. Johnson processed the signal data from BioSAR instrument, the processed data were given to ORNL and we attempted to derive empirical relationships between the radar signals and the ground truth forest biomass measurements using standard statistical techniques. We were unsuccessful in deriving such relationships. Shortly before the CRADA ended, Mr Johnson discovered that FM signal from local radio station broadcasts had interfered with the back scatter measurements such that the bulk of the signal received by the BioSAR instrument was not backscatter from the radar but rather was local radio station signals.
Date: May 24, 2007
Creator: Graham, R.L. & Johnson, P.
Partner: UNT Libraries Government Documents Department

Treatability studies of actual listed waste sludges from the Oak Ridge Reservation (ORR)

Description: Oak Ridge National Laboratory (ORNL) and Savannah River Technology Center (SRTC) are investigating vitrification for various low-level and mixed wastes on the Oak Ridge Reservation (ORR). Treatability studies have included surrogate waste formulations at the laboratory-, pilot-, and field-scales and actual waste testing at the laboratory- and pilot-scales. The initial waste to be processing through SRTC`s Transportable Vitrification System (TVS) is the K-1407-B and K-1407-C (B/C) Pond sludge waste which is a RCRA F-listed waste. The B/C ponds at the ORR K-25 site were used as holding and settling ponds for various waste water treatment streams. Laboratory-, pilot-, and field- scale ``proof-of-principle`` demonstrations are providing needed operating parameters for the planned field-scale demonstration with actual B/C Pond sludge waste at ORR. This report discusses the applied systems approach to optimize glass compositions for this particular waste stream through laboratory-, pilot-, and field-scale studies with surrogate and actual B/C waste. These glass compositions will maximize glass durability and waste loading while optimizing melt properties which affect melter operation, such as melt viscosity and melter refractory corrosion. Maximum waste loadings minimize storage volume of the final waste form translating into considerable cost savings.
Date: May 6, 1996
Creator: Jantzen, C.M.; Peeler, D.K.; Gilliam, T.M.; Bleier, A. & Spence, R.D.
Partner: UNT Libraries Government Documents Department

Radioactive and hazardous constituents screening plan for industrial waste landfill IV

Description: Industrial Waste Landfill IV (IWLF IV) is permitted (Registration Number IDL 01 1030075) to accept nonhazardous, nonradioactive industrial waste as detailed in the {open_quotes}Design and Operating Procedures for the Y-12 Industrial Waste Landfill IV,{close_quotes} Y/TS-399 and by Tennessee Department of Environment and Conservation (TDEC) special waste approval. Both are approved by the TDEC.
Date: May 1, 1994
Creator: Lankford, L. L. & Bohrman, D. E.
Partner: UNT Libraries Government Documents Department

Survey of protected terrestrial vertebrates on the Oak Ridge Reservation. Final report

Description: Surveys of protected terrestrial vertebrates on the Oak Ridge Reservation (ORR) were conducted from October 1994 through May 1996. The surveys were undertaken to help avoid or minimize the potential impacts of projects on the ORR to species listed by the state or federal government as endangered, threatened, or in need-of-management; federal species of concern were included. Results of the survey will also assist in effectively managing the ORR. Currently, there are 69 species of federal- or state-listed terrestrial vertebrates (20 reptiles and amphibians, 20 mammals, and 29 birds) that may occur in Tennessee. Listed animal species that might be present on the ORR were targeted for survey using a prioritization system based on historical and recent sightings, known species distributions, presence of suitable habitat, literature reviews, and personal communications. Survey methods included trapping, seining, monitoring artificial covers, active searching, and avian surveys. Surveys were conducted during the time of year when each targeted species was most likely to be encountered. The report also includes ancillary information. Records are provided for nonlisted species (44 species of reptiles and amphibians, 155 species of birds, and 28 species of mammals). Categorization of survey sites into 1 or more of 19 habitat types, which are briefly described, is presented. Notes are summarized on the occurrence of threatened and endangered species on the ORR. The report also lists threatened and endangered species not found that might be located by additional surveys, recommends three survey areas for natural-area status due to wildlife value, and suggests several avenues for future work.
Date: May 1, 1996
Creator: Mitchell, J.M.; Vail, E.R.; Webb, J.W.; King, A.L. & Hamlett, P.A.
Partner: UNT Libraries Government Documents Department

Covenant Deferral Request for the Proposed Transfer of Land Parcel ED-8 at the East Tennessee Technology Park, Oak Ridge, Tennessee - Final - May 2009

Description: The United States Department of Energy (DOE) is proposing to transfer a land parcel (hereinafter referred to as 'the Property') designated as Land Parcel ED-8 at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, by deed, and is submitting this Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and applicable U. S. Environmental Protection Agency (EPA) guidance. The Oak Ridge Reservation (ORR), which includes ETTP, was placed on the National Priorities List (NPL) in November 1989. Environmental investigation and cleanup activities are continuing at ETTP in accordance with CERCLA, the National Contingency Plan (NCP), and the Federal Facility Agreement (FFA). The FFA was entered into by the DOE-Oak Ridge Office (ORO), EPA Region 4, and the Tennessee Department of Environment and Conservation (TDEC) in 1991. The FFA establishes the schedule and milestones for environmental remediation of the ORR. The proposed property transfer is a key component of the Oak Ridge Performance Management Plan (ORPMP) for accelerated cleanup of the ORR. DOE, using its authority under Section 161(g) of the Atomic Energy Act of 1954 (AEA), proposes to transfer the Property to Heritage Center, LLC, a subsidiary of the Community Reuse Organization of East Tennessee (CROET), hereafter referred to as 'Heritage Center.' CROET is a 501(c)(3) not-for-profit corporation established to foster the diversification of the regional economy by re-utilizing DOE property for private-sector investment and job creation. The Property is located in the southern portion of ETTP and consists of approximately 84 acres proposed as the potential site for new facilities to be used for office space, industrial activities, or other commercial uses. The parcel contains both grassy fields located outside the ETTP 'main plant' area and infrastructure located inside the 'main plant' area. No buildings are ...
Date: May 1, 2009
Creator: SAIC
Partner: UNT Libraries Government Documents Department

Environmental Baseline Survey Report for the Title Transfer of Parcel ED-9 at the East Tennessee Technology Park, Oak Ridge, Tennessee

Description: This environmental baseline survey (EBS) report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) Parcel ED-9 at the East Tennessee Technology Park (ETTP). Parcel ED-9 consists of about 13 acres that DOE proposes to transfer to Heritage Center, LLC (hereafter referred to as 'Heritage Center'), a subsidiary of the Community Reuse Organization of East Tennessee (CROET). The 13 acres include two tracts of land, referred to as ED-9A (7.06 acres) and ED-9B (5.02 acres), and a third tract consisting of about 900 linear feet of paved road and adjacent right-of-way, referred to as ED-9C (0.98 acres). Transfer of the title to ED-9 will be by deed under a Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This report provides a summary of information to support the transfer of this government-owned property at ETTP to a non-federal entity.
Date: May 1, 2010
Creator: SAIC
Partner: UNT Libraries Government Documents Department

Status report: A hydrologic framework for the Oak Ridge Reservation

Description: This first status report on the Hydrologic Studies Task of the Oak Ridge Reservation Hydrology and Geology Study (ORRHAGS) revises earlier concepts of subsurface hydrology and hydrogeochemistry of the ORR. A new classification of hydrogeologic units is given, as well as new interpretations of the gydrogeologic properties and processes that influence contaminant migration. The conceptual hydrologic framework introduced in this report is based primarily on reinterpretations of data acquired during earlier hydrologic investigations of waste areas at and near the three US Department of Energy Oak Ridge (DOE-OR) plant facilities. In addition to describing and interpreting the properties and processes of the groundwater systems as they are presently understood, this report describes surface water-subsurface water relations, influences on contaminant migration,and implications to environmental restoration, environmental monitoring, and waste management.
Date: May 1, 1992
Creator: Solomon, D. K.; Toran, L. E.; Dreier, R. B. (Oak Ridge National Lab., TN (United States)); Moore, G. K. & McMaster, W. M. (Tennessee Univ., Knoxville, TN (United States). Dept. of Civil Engineering)
Partner: UNT Libraries Government Documents Department

Status report: A hydrologic framework for the Oak Ridge Reservation

Description: This first status report on the Hydrologic Studies Task of the Oak Ridge Reservation Hydrology and Geology Study (ORRHAGS) revises earlier concepts of subsurface hydrology and hydrogeochemistry of the ORR. A new classification of hydrogeologic units is given, as well as new interpretations of the gydrogeologic properties and processes that influence contaminant migration. The conceptual hydrologic framework introduced in this report is based primarily on reinterpretations of data acquired during earlier hydrologic investigations of waste areas at and near the three US Department of Energy Oak Ridge (DOE-OR) plant facilities. In addition to describing and interpreting the properties and processes of the groundwater systems as they are presently understood, this report describes surface water-subsurface water relations, influences on contaminant migration,and implications to environmental restoration, environmental monitoring, and waste management.
Date: May 1, 1992
Creator: Solomon, D. K.; Toran, L. E.; Dreier, R. B.; Moore, G. K. & McMaster, W. M.
Partner: UNT Libraries Government Documents Department

Watersheds of the Oak Ridge Reservation in a geographic information system

Description: This work develops a comprehensive set of watershed definitions for the entire Oak Ridge Reservation and surrounding area. A stream-ordering system is defined based upon the method proposed by Strahler (1952) and using 1:24,000 scale US Geological Survey (USGS) topographic maps and the locally standard S-16A Map (USGS 1987) as sources for topographic contours and locations of streams as recommended by the Natural Resources Conservation Service (NRCS 1995). For each ordered stream, a contributing watershed or catchment area is delineated and digitized into a geographic information system (GIS), generating over 900 watershed polygons of various orders. This new dataset complements a growing database of georeferenced environmental and cultural data which exist for the Oak Ridge area and are routinely used for socioeconomic and environmental analyses. Because these watersheds are now available in a GIS format, they may be used in a variety of hydrologic analyses, including rainfall/runoff modeling, development of geomorphological parameters, and the modeling of contaminant transport in surface waters. An understanding of the relationships of watersheds to sources of contamination and to administrative and political boundaries is also essential in land use planning and the organization of environmental restoration and waste management activities.
Date: May 1, 1998
Creator: Tauxe, J.
Partner: UNT Libraries Government Documents Department

Oak Ridge Low Level Waste Management Task Force summary

Description: New facilities are required in the next five years to manage low level radioactive wastes (LLW) produced on the Oak Ridge Reservation (ORR). The Central Waste Disposal Facility (CWDF) was planned to provide the needed additional facilities beginning in late 1985. The CWDF was planned as a shallow land burial facility to dispose of non-stabilized LLW. However, comments on the CWDF Draft Environmental Impact Statement (DEIS) received from the State of Tennessee, the Environmental Protection Agency, and the Nuclear Regulatory Commission identified major issues related to the treatment of alternatives as required by the National Environmental Policy Act, and the potential for unacceptable groundwater contamination resulting from shallow land burial of non-stabilized waste. A series of initial and detailed evaluations are being conducted to develop the basic environmental performance and cost information needed to compare several LLW management approaches and arrive at a proposed system for development. The evaluations are targeted for completion by October.
Date: May 1, 1985
Creator: Van Hoesen, S.D.
Partner: UNT Libraries Government Documents Department

Annual report on the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee: Results of Phase 1 investigation

Description: Many constituents of potential concern for human health occur naturally at low concentrations in undisturbed soils. The Background soil Characterization Project (BSCP) was undertaken to provide background concentration data on potential contaminants in natural soils on the Oak Ridge Reservation (ORR). The objectives of the BSCP are to provide baseline data for contaminated site assessment and estimates of potential human health risk associated with background concentrations of hazardous and other constituents in native soils. This report presents, evaluates, and documents data and results obtained in Phase I of the project. It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program.
Date: May 1, 1993
Creator: Watkins, D. R.; Goddard, P. L.; Hatmaker, T. L.; Hook, L. A.; Jackson, B. L.; Kimbrough, C. W. et al.
Partner: UNT Libraries Government Documents Department

Best management practices plan for the Chestnut Ridge-Filled Coal Ash Pond at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

Description: The Chestnut Ridge Filled Coal Ash Pond (FCAP) Project has been established to satisfy Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements for the Chestnut Ridge Operable Unit 2. FCAP is on Chestnut Ridge, approximately 0.5 miles south of the Y-12 Plant. A 62-foot high earthen dam across Upper McCoy Branch was constructed in 1955 to create a pond to serve as a settling basin for fly and bottom ashes generated by burning coal at the Y-12 Steam Plant. Ash from the steam was mixed with water to form a slurry and then pumped to the crest of Chestnut Ridge and released through a large pipe to flow across the Sluice Channel area and into the pond. The ash slurry eventually overtopped the dam and flowed along Upper McCoy Branch to Rogers Quarry. The purpose of this document is to provide a site-specific Best Management Practices (BMP) Plan for construction associated with environmental restoration activities at the FCAP Site.
Date: May 1, 1996
Partner: UNT Libraries Government Documents Department

Cesium removal using crystalline silicotitanate. Innovative technology summary report

Description: Approximately 100 million gallons of radioactive waste is stored in underground storage tanks at the Hanford Site, Idaho National Engineering and Environmental Laboratory (INEEL), Oak Ridge Reservation, and Savannah River Site (SRS). Most of the radioactivity comes from {sup 137}Cs, which emits high-activity gamma radiation. The Cesium Removal System is a modular, transportable, ion-exchange system configured as a compact processing unit. Liquid tank waste flows through columns packed with solid material, called a sorbent, that selectively adsorbs cesium and allows the other materials to pass through. The sorbent is crystalline silicotitanate (CST), an engineered material with a high capacity for sorbing cesium from alkaline wastes. The Cesium Removal System was demonstrated at Oak Ridge using Melton Valley Storage Tank (MVST) waste for feed. Demonstration operations began in September 1996 and were completed during June 1997. Prior to the demonstration, a number of ion-exchange materials were evaluated at Oak Ridge with MVST waste. Also, three ion-exchange materials and three waste types were tested at Hanford. These bench-scale tests were conducted in a hot cell. Hanford's results showed that 300 times less sorbent was used by selecting Ionsiv IE-911 over organic ion-exchange resins for cesium removal. This paper gives a description of the technology and discusses its performance, applications, cost, regulatory and policy issues and lessons learned.
Date: May 1, 1999
Partner: UNT Libraries Government Documents Department

Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

Description: The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use and serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.
Date: May 1, 1998
Partner: UNT Libraries Government Documents Department

Cost-effective facility disposition planning with safety and health lessons learned and good practices from the Oak Ridge Decontamination and Decommissioning Program

Description: An emphasis on transition and safe disposition of DOE excess facilities has brought about significant challenges to managing worker, public, and environmental risks. The transition and disposition activities involve a diverse range of hazardous facilities that are old, poorly maintained, and contain radioactive and hazardous substances, the extent of which may be unknown. In addition, many excess facilities do not have historical facility documents such as operating records, plant and instrumentation diagrams, and incident records. The purpose of this report is to present an overview of the Oak Ridge Decontamination and Decommissioning (D and D) Program, its safety performance, and associated safety and health lessons learned and good practices. Illustrative examples of these lessons learned and good practices are also provided. The primary focus of this report is on the safety and health activities and implications associated with the planning phase of Oak Ridge facility disposition projects. Section 1.0 of this report provides the background and purpose of the report. Section 2.0 presents an overview of the facility disposition activities from which the lessons learned and good practices discussed in Section 3.0 were derived.
Date: May 1, 1998
Partner: UNT Libraries Government Documents Department

The geology and hydrogeology of Bear Creek Valley Waste Disposal Areas A and B

Description: A study was undertaken of the Oil Landfarm and Burial Grounds A and B, which are three disposal sites within the Bear Creek Waste Disposal Area. The area is located west of the Y-12 plant, about 3 miles southwest of Oak Ridge, Tennessee. The purpose of this interim report is to present data collected at the Burial Grounds A and B, and to provide the results of hydrogeologic analyses. The Oil Landfarm geologic and hydrogeologic data and analyses have been submitted in a January 1984 interim report. The overall objectives of the study were to characterize the types and extent of wastes present and to define the occurrence and movement of ground water beneath the sites. The intention of this work is to provide criteria on which a design for containing the waste can be developed. Specific activities performed by Bechtel included: drilling for subsurface geologic data; installing monitoring wells; measuring permeability and ground-water flow directions; and collecting soil, sediment, surface- and ground-water, and liquid-waste samples for chemical analysis. Results are presented on the geology and ground waters.
Date: May 1, 1984
Partner: UNT Libraries Government Documents Department