Search Results

Advanced search parameters have been applied.
Primary view of Effects of the second harmonic cavity on rf capture and transition crossing
Kats, J. M. & Weng, W. T.
January 1, 1992
Primary view of Beam Loss Estimates and Control for the BNL Neutrino Facility.
Weng, W. T.; Lee, Y. Y.; Raparia, D.; Tsoupas, N.; Beebe-Wang, J.; Wei, J. et al.
May 16, 2005
Primary view of Beam-Loss Driven Design Optimization for the Spallation Neutron Source (SNS) Ring.
Wei, J.; Beebe-Wang, J.; Blaskiewicz, M.; Cameron, P.; Danby, G.; Gardner, C. J. et al.
March 29, 1999
Primary view of Injector Linac for the Bnl Super Neutrino Beam Project.
Raparia, D.; Alessi, J.; Ruggiero, A. & Weng, W. T.
May 16, 2005
Primary view of High Energy Pulsed Power System for Ags Super Neutrino Focusing Horn.
Zhang, S. Y.; Sandberg, J. & Weng, W. T.
May 16, 2005
Primary view of Proposal for Reduction of Transverse Emittance of Bnl 200 Mev Linac.
Raparia, D.; Alessij.; Beebe-Wang, J. & Weng, W. T.
August 13, 2004
Primary view of CONCEPT DESIGN OF THE TARGET/HORN SYSTEM FOR THE BNL NEUTRINO OSCILLATION EXPERIMENT.
SIMOS,N. KIRK,H. KAHN,S. CARROL,A. LUDEWIG,H. WENG,W. T. DIWAN,M. RAPARIA,D. MCDONALD,K. EVANGELAKIS,G.
May 12, 2003
Primary view of Static and transient beam loading of a synchrotron
Zhang, S. Y. & Weng, W. T.
July 13, 1992
Primary view of EFFECTS OF HALO ON THE AGS INJECTION FROM 1.2GEV LINAC.
WENG,W. T. BEEBE-WANG,J. RAPARIA,D. RUGGEIERO,A. G. TSOUPAS,N.
June 19, 2003
Primary view of The Ags-Based Super Neutrino Beam Facility Conceptual Design Report
Weng, W. T.; Diwan, M. & Raparia, D.
October 8, 2004
Primary view of The BNL Super Neutrino Beam Project
Weng, W. T. & Raparia, D.
December 2, 2004
Primary view of Design of the Bnl Super Neutrino Beam Facility
Weng, W. T.; Alessi, J. & Beavis, D. Et Al.
March 22, 2004
Primary view of Status of the AGC Booster project
Weng, W. T.
January 1, 1988
Primary view of Bunched beam instability with frequency spread
Zhang, S. Y. & Weng, W. T.
September 1, 1994
Primary view of Rf beam loading in the Brookhaven AGS with booster injection
Zhang, S. Y.; Raka, E. & Weng, W. T.
September 1, 1992
Primary view of Operation of the Brookhaven AGS with the Booster
Weng, W. T.
June 1, 1993
Primary view of Topics on RF beam control of a synchrotron
Zhang, S. Y. & Weng, W. T.
July 13, 1992
Primary view of A new formulation of longitudinal coherent instabilities
Zhang, S. Y. & Weng, W. T.
June 1, 1993
Primary view of Effects of the second harmonic cavity on rf capture and transition crossing
Kats, J. M. & Weng, W. T.
August 1, 1992
Primary view of On solutions of Sacherer integral equation
Zhang, S. Y. & Weng, W. T.
June 17, 1994
Primary view of Observation and correction of resonance stopbands in the AGS Booster
Gardner, C.; Shoji, Y.; Ahrens, L.; Glenn, J. W.; Lee, Y. Y.; Roser, T. et al.
June 1, 1993
Primary view of Analysis of Periodic Transient Beam Loading of the AGS
Zhang, S. Y. & Weng, W. T.
July 13, 1992
Primary view of Evaluating impedances in a Sacherer integral equation
Zhang, S. Y. & Weng, W. T.
August 1, 1994
Primary view of The operational status of the Booster injector for the AGS accelerator complex at BNL
Ahrens, L.; Bleser, E.; Brennan, J. M.; Gardner, C.; Gill, E.; Glenn, J. W. et al.
September 1, 1992
Back to Top of Screen