Production test-105-55-P -- Reactivity of the B Pile under shutdown conditions. Interim report

Description: At the shutdown of the B Pile, 269 active tubes were discharged and ten poison columns were charged. As a result, the pile was let considerably below critical. The present test described in this report was set up to develop methods of detecting possible changes in reactivity by periodic measurements of neutron flux in the shutdown pile. The irradiation of indium foils in an empty process tube was found to provide a satisfactory method of monitoring the shutdown pile, and was sensitive than the … more
Date: July 26, 1946
Creator: Menegus, R. L.
Partner: UNT Libraries Government Documents Department
open access

100 Areas technical activities report -- Engineering, June, 1948

Description: This report covers work done by the Pile Engineering Groups and work done on special assignments. Topics covered include: slug blistering and corrosion; graphite allocation to DR pile; slug molding; segmental discharge; Van Stone corrosion; flow laboratory modifications; downcomer at B pile; downcomer at D pile; annealing of pile graphite; replacement of pile atmosphere with CO{sub 2}; unit motion; beta experiment; can opening; slug annealing; new technical building, 300 area; and ruptured slug… more
Date: July 19, 1948
Creator: Woods, W. K.
Partner: UNT Libraries Government Documents Department
open access

100 Areas, February 5--February 11

Description: This report gives the weekly status for the B, D, and F piles. Also given is the reactivity status at the end of the week for each pile. Process water control and pressure drop studies are discussed. Finally a brief discussion is given of the graphite expansion problem.
Date: February 15, 1946
Creator: Jordan, W. E.
Partner: UNT Libraries Government Documents Department
open access

Production of Ta{sup 182}

Description: This memorandum discusses briefly and approximately the two extreme programs which could be followed in the production of Ta{sup 182}: the use of present available excess reactivity, and the use of a pile, continuing no U{sup 238}, expressly to produce Ta{sup 182}. Use of lesser amounts of enriched material would achieve lesser production rates. The cost in fissionable material per gram of active isotope would remain approximately the same.
Date: July 8, 1948
Creator: Gast, P. F.
Partner: UNT Libraries Government Documents Department
open access

Process tubes at B Pile

Description: This memorandum discusses the roflanging of the corroded rear Van Stone flanges at the B Pile after cutting 3/8-inch off the rear gun barrel which should place the B Pile in a condition as good as, or better than that of the D or F Piles.
Date: July 28, 1947
Creator: Lewis, W. R.
Partner: UNT Libraries Government Documents Department
open access

100 Areas, January 15 through January 21

Description: This report gives the weekly progress for the B, D, and F piles. The report also gives a brief discussion of the following activities: process water control and pressure drop studies; purging of D, B, and F piles; slug corrosion studies; tube corrosion studies; thimble corrosion studies; and graphite expansion studies.
Date: January 25, 1946
Creator: Jordan, W. E.
Partner: UNT Libraries Government Documents Department
open access

Beta M2 Slit Support

Description: A new G slit support utilizing the standard G carbon now in use in all Beta production buildings was tested over approximately four months in the Pilot Plant with very successful results. A considerable saving has been made both in servicing time and in costs. The equipment has proved to be the best of any tried from the standpoint of run terminations due to alignment difficulties.
Date: September 7, 1945
Creator: Duncan, F. R.
Partner: UNT Libraries Government Documents Department