38 Matching Results

Search Results

Advanced search parameters have been applied.

Contaminants of Potential Concern in the 300-FF-5 Operable Unit: Expanded Annual Groundwater Report for Fiscal Year 2004

Description: This report satisfies requirements in the Operations and Maintenance Plan for the 300-FF-5 Operable Unit (DOE/RL-95-73, Rev. 1) to provide detailed information, beyond that provided in the regular annual groundwater report (e.g., PNNL-15070), on groundwater conditions. The purpose is to characterize current conditions; provide a basis for changes to the monitoring schedules; and provide technical information to support the second 5-year review of the record-of-decision for the operable unit. Key topics include historical trends in the levels of various contaminants; updating the list of contaminants of potential concern; conceptual site models for uranium (300 Area) and tritium (618-11 waste site sub-region); performance of the interim actions under the current record-of-decision; and analysis of the applicability of Monitored Natural Attenuation as a remedial action alternative.
Date: March 31, 2005
Creator: Peterson, Robert E.; Freeman, Eugene J.; Thorne, Paul D.; Williams, Mark D.; Lindberg, Jon W.; Murray, Christopher J. et al.
Partner: UNT Libraries Government Documents Department

The Russian Federal Information System for Nuclear Material Control and Accounting: Yesterday, Today and Tomorrow

Description: Most enterprises in the Russian Federation are not prepared to report to the Russian Federal Nuclear Material Control and Accounting Information System (FIS) by the full function reporting method. The full function reporting method requires reporting inventory listings on a schedule based on nuclear material category, submission of individual inventory change reports, and reconciliation and closeout at the end of each reporting period. Most Russian enterprises do not have automated systems and do not have the resources to develop and implement such systems. Over the last two years, MinAtom put the regulations and national level nuclear material control and accounting (MC&A) software in place to require all enterprises in the Russian Federation to report summarized inventory listings to the FIS in January 2002. Enterprises do not need automated systems to comply with summarized reporting requirements. Along with the approximately 25% of the total Category 1 Material Balance Areas (MBAs) using full function reporting, the addition of this complete summarized inventory makes the FIS a more valuable tool for MinAtom management. The FIS is now poised to complete the work by improving the integrity and reliability of the data through increasing the number of enterprises and MBAs using full function reporting. There are obstacles and issues that must be dealt with along the way to achieving the final goal of every MBA sending inventory and inventory change reports using the full function reporting method. Summarized reporting is a major step toward this final goal. Currently all MBAs using full function reporting are doing so under a U.S. contract. FIS management recognized full function reporting could not be implemented in the near-term and prepared a plan with immediate, intermediate, and long-term FIS tasks. To address the major obstacles and optimize implementation, two paths need to be followed in parallel: developing the regulatory ...
Date: May 31, 2002
Creator: Martyanov, A A; Pitel, V A; Berchik, V P; Kasumova, L A; Babcock, R A; Kilmartin, W E et al.
Partner: UNT Libraries Government Documents Department

SRS ES&H Standards Compliance Program Implementation Plan. Revision 2

Description: SRS initiated two parallel efforts to address aspects of Recommendation 90-2. An Order Compliance Program was established with initial focus on compliance with requirements contained in Environment, Safety, and Health (ES&H) related DOE Orders, both from a programmatic perspective as well as from a field adherence perspective; and a Standards/Requirements Identification Document (S/RID) development program was established to specify a ``necessary and sufficient`` set of ES&H requirements to protect the environment and public/worker safety and health. During the period while the S/RID methodology was being developed, many of the DOE ES&H Orders were revised and substantially improved. These improvements captured many of the insights gained in the developing S/RID program. As the SRS Order Compliance and S/RID programs matured and achieved major deliverables in 1993 and 1994, major overlaps between the two programs were identified. In early 1994, WSRC and DOE-SR determined that the two separate programs should be physically and organizationally integrated (and further merged with newly identified needs associated with Price-Anderson Amendments Act nuclear safety regulations) to become a single SRS Compliance Program. This document defines the program for integration of the WSRC Order Compliance, S/RID, and Price-Anderson Compliance activities. This plan supersedes the SRS ES&H Standards Compliance Program Management Plan and the SRS ES&H Standards Compliance Program Implementation Plan.
Date: August 31, 1994
Creator: Hearn, W. H.
Partner: UNT Libraries Government Documents Department

Hanford Environmental Dose Reconstruction Project. Monthly report, December 1991

Description: The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon and Washington, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on human (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demographics, Agriculture, Food Habits and; Environmental Pathways and Dose Estimates.
Date: December 31, 1991
Creator: Finch, S. M. & McMakin, A. H.
Partner: UNT Libraries Government Documents Department

Project management controls

Description: Project management controls are utilized to enhance the probability that a project will be successful. The control system used by a project manager can take many forms and can be applied at different times to varying degrees on a given project depending upon its complexity. The Consolidated Incineration Facility (CIF) is one project of many at the Savannah River Site (SRS). The United States Department of Energy Order 4700.1 is a project management system that is applied on a site-wide basis, thus including the CIF. The control system required by this order is proceduralized to ensure that it is applied in a consistent manner and will produce reliable results. These results provide the project manager with a correlation of both costs and schedule within the defined scope to adequately asses the status of the project. This is an iterative process and can be simply stated: plan, actual, variance, corrective action, prediction, and revision. This paper presents the basis for the project management controls applied at the Savannah River Site.
Date: December 31, 1990
Creator: Hardin, D. S. & Carnes, W. S.
Partner: UNT Libraries Government Documents Department

Westinghouse Savannah River Company (WSRC) approach to nuclear facility maintenance

Description: The Savannah River Site (SRS) in South Carolina is a 300+ square mile facility owned by the US Department of Energy (DOE) and operated by Westinghouse Savannah River Company (WSRC), the prime contractor; Bechtel Savannah River, Incorporated (BSRI) is a major subcontractor. The site has used all of the five nuclear reactors and it has the necessary nuclear materials processing facilities, as well as waste management and research facilities. The site has produced materials for the US nuclear arsenal and various isotopes for use in space research and nuclear medicine for more than 30 years. In 1989, WSRC took over as prime contractor, replacing E.I. du Pont de Nemours and Company. At this time, a concentrated effort began to more closely align the operating standards of this site with those accepted by the commercial nuclear industry of the United States. Generally, this meant acceptance of standards of the Institute of Nuclear Power Operations (INPO) for nuclear-related facilities at the site. The subject of this paper is maintenance of nuclear facilities and, therefore, excludes discussion of the maintenance of non-nuclear facilities and equipment.
Date: December 31, 1991
Creator: Harrison, D. W.
Partner: UNT Libraries Government Documents Department

Value-added co-products from K-M/IGT facility

Description: Objective is to develop the IGT MILDGAS (a continuous coal carbonization process for producing liquid and solid (char) coproducts at mild operating conditions up to 50 psig and 1300 F) technology for near-term commercialization. Specifically, a 24- ton/day adiabatic process development unit (PDU) is to be constructed. Status of the schedule for constructing the PDU at Southern Illinois University, Carbondale, is given.
Date: December 31, 1993
Creator: Campbell, J. A. L.; Carty, R. H. & Foster, H.
Partner: UNT Libraries Government Documents Department

Computer simulation and capacity evaluation of Panama Canal alternatives

Description: The Operating Characteristics and Capacity Evaluation (OCCE) Study was one of the components of a group of studies of future alternatives to the Panama Canal, sponsored by a study commission formed by the governments of Panama, the US and Japan. The basic tool in the conduct of the study was the Waterway Analysis Model (WAM), developed originally by the US Army Corps of Engineers for use on the US inland waterway system and adapted under OCCE for study of Panama Canal alternatives. The study synthesized the many alternative plans for the Canal proposed historically into four basic groups: High-Rise Lock Canal, Low-Rise Lock Canal, Sea-Level Canal and Status Quo Canal. For economy, the sea-level cases were based on, essentially, a single-lane canal, in conjunction with the status quo canal. Hydraulic and navigation studies indicted that to achieve safe navigation, tide gates or locks would be required to control currents that would otherwise be generated by the differences in tides between the two oceans. The alternatives studied in detail are illustrated in the body of the paper.
Date: December 31, 1994
Creator: Rosselli, A. T.; Bronzini, M. S. & Weekly, D. A.
Partner: UNT Libraries Government Documents Department

Production of mild gasification coproducts project. Quarterly technical progress report, [July 1, 1993--September 30, 1993]

Description: The work of producing the coproduct samples and delivering the samples of each feedstock coal, the Coal Derived Liquid (CDL) and the Simulated Process Derived Fuel (PDF) has been accomplished under Option: Item 2 of this contract. The feedstock coals were taken from four mines which are defined below. Table 1 depicts the history of the coals from the taking of samples at the mine to delivery of all samples to the designated laboratories for test, analysis and reporting.
Date: October 31, 1993
Partner: UNT Libraries Government Documents Department

University of North Texas Willis Library MEP Renovations: Construction Documents

Description: Compilation of architectural drawings documenting planned construction and renovations for Willis Library as of May 2018. The first page includes an index to the rest of the schematics which outline the various components of the project including demolition and HVAC (heating, ventilation, and air conditioning) work, mechanical piping, electrical and lighting, and fire sprinklers for each of the five floors (lower level and floors one through four). Each sheet includes technical details, schedules, notes, and other relevant technical information for the work.
Date: May 31, 2018
Creator: Yaggi Engineering, Inc.
Location Info:
Partner: UNT Libraries

Environmental Biosciences Program Quarterly Report

Description: In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making.
Date: January 31, 2008
Creator: Lawrence C. Mohr, M.D.
Partner: UNT Libraries Government Documents Department

Plant Wide Assessment of Energy Usage Utilizing SitEModelling as a Tool for Optimizing Energy Consumption

Description: The Evonik Degussa Corporation is the global market leader in the specialty chemicals industry. Innovative products and system solutions make an indispensable contribution to our customers' success. We refer to this as "creating essentials". In fiscal 2004, Degussa's 45,000 employees worldwide generated sales of 11.2 billion euros and operating profits (EBIT) of 965 million euros. Evonik Degussa Corporation has performed a plant wide energy usage assessment at the Mapleton, Illinois facility, which consumed 1,182,330 MMBTU in 2003. The purpose of this study was to identify opportunities for improvement regarding the plant’s utility requirements specific to their operation. The production is based mainly on natural gas usage for steam, process heating and hydrogen production. The current high price for natural gas in the US is not very competitive compared to other countries. Therefore, all efforts must be taken to minimize the utility consumption in order to maximize market position and minimize fixed cost increases due to the rising costs of energy. The main objective of this plant wide assessment was to use a methodology called Site Energy Modelling (SitE Modelling) to identify areas of potential improvement for energy savings, either in implementing a single process change or in changing the way different processes interact with each other. The overall goal was to achieve energy savings of more than 10% compared to the 2003 energy figures of the Mapleton site. The final savings breakdown is provided below: - 4.1% savings for steam generation and delivery These savings were accomplished through better control schemes, more constant and optimized loading of the boilers and increased boiler efficiency through an advanced control schemes. - 1.6% savings for plant chemical processing These saving were accomplished through optimized processing heating efficiency and batch recipes, as well as an optimized production schedule to help equalize the boiler load ...
Date: December 31, 2007
Creator: Janowsky, Ralf & Mole, Tracey
Partner: UNT Libraries Government Documents Department

Experimental Bench-marking of Pu Electronic Structure

Description: Our plan is to do Ce (as a Pu surrogate) this year and be ready to do Pu next year. The Fano (Spin-resolved Photoelectron Spectroscopy) measurements are essential to testing electron correlation in the occupied 5f states. BIS (Bremstrahlung Isochromat Spectroscopy or high energy Inverse Photoelectron Spectroscopy) experiments are crucial to a quantitative determination of the 5f unoccupied density of states (5f-UDOS). The 5f UDOS is the key to differentiation between a myriad of models of 5f electronic structure. During this time, we will work to converge to a solution for the Pu safety issues, with the plan to implement these in the next FY. Acceleration of this schedule and implementation of the safety plan in this FY will require a very significant increase in funding. Ultimately, results from the Pu experiments will be fed into calculations performed by P. Soderlind, A. Landa, and others.
Date: July 31, 2007
Creator: Laboratory, Lawrence Livermore National
Partner: UNT Libraries Government Documents Department

Environmental Biosciences Quarterly Report

Description: In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems. Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this cooperative agreement can be forwarded to Dr. Lawrence C. Mohr in the EBP office of the Medical University of South Carolina at (843) 792-1532.
Date: January 31, 2007
Creator: Lawrence C. Mohr, M.D.
Partner: UNT Libraries Government Documents Department

Environmental Biosciences Report for Year 3

Description: In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk based decision-making. Questions, comments or requests for further information concerning the activities under this cooperative agreement can be forwarded to Dr. Lawrence C. Mohr in the EBP office of the Medical University of South Carolina at (843) 792-1532.
Date: October 31, 2007
Creator: Lawrence C. Mohr, M.D.
Partner: UNT Libraries Government Documents Department

Environmental Biosciences Program Quarterly Report

Description: In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this cooperative agreement can be forwarded to Dr. Lawrence C. Mohr in the EBP office of the Medical University of South Carolina at (843) 792-1532.
Date: July 31, 2007
Creator: Lawrence C. Mohr, M.D.
Partner: UNT Libraries Government Documents Department

Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

Description: This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.
Date: January 31, 2007
Creator: Bisping, Lynn E.
Partner: UNT Libraries Government Documents Department

Advanced Gasifier Pilot Plant Concept Definition

Description: This report presents results from definition of a preferred commercial-scale advanced gasifier configuration and concept definition for a gasification pilot plant incorporating those preferred technologies. The preferred commercial gasifier configuration was established based on Cost Of Electricity estimates for an IGCC. Based on the gasifier configuration trade study results, a compact plug flow gasifier, with a dry solids pump, rapid-mix injector, CMC liner insert and partial quench system was selected as the preferred configuration. Preliminary systems analysis results indicate that this configuration could provide cost of product savings for electricity and hydrogen ranging from 15%-20% relative to existing gasifier technologies. This cost of product improvement draws upon the efficiency of the dry feed, rapid mix injector technology, low capital cost compact gasifier, and >99% gasifier availability due to long life injector and gasifier liner, with short replacement time. A pilot plant concept incorporating the technologies associated with the preferred configuration was defined, along with cost and schedule estimates for design, installation, and test operations. It was estimated that a 16,300 kg/day (18 TPD) pilot plant gasifier incorporating the advanced gasification technology and demonstrating 1,000 hours of hot-fire operation could be accomplished over a period of 33 months with a budget of $25.6 M.
Date: August 31, 2005
Creator: Fusselman, Steve; Darby, Alan & Widman, Fred
Partner: UNT Libraries Government Documents Department

METHANE de-NOX for Utility PC Boilers

Description: Preparations for conducting large-scale combustion tests with caking bituminous coal continued during the start of this quarter. Major project accomplishments related to bituminous coal testing included: a CFD preheat model and evaluation, an update of the process flow diagram and a detailed preheat burner mechanical design (suitable for construction) for firing bituminous coal. Installation and testing of the 85 MMBtu/h bituminous coal preheating system was planned to take place before the end of December. Based on the inability to conduct testing in Riley's Commercial Burner Test Facility (CBTF) during freezing weather, a schedule review indicated required site work for testing bituminous coal at the CBTF could not be completed before freezing weather set in at the site. Further bituminous preheat modification work was put on hold and efforts turned to securing the test facility over the winter season. Bituminous coal tests are therefore delayed; April-May 2005 is earliest estimate of when testing can resume. A request for a time extension was submitted to DOE to extend the project through September 2005 to allow time to secure additional funding and complete the bituminous coal testing. Removal of the PRB PC Preheater from the CBTF burner deck was completed. Decommissioning of the CBTF for the winter was also completed.
Date: December 31, 2004
Creator: Bryan, Bruce; Rabovitser, Joseph; Nester, Serguei & Wohadlo, Stan
Partner: UNT Libraries Government Documents Department

Development of OTM Syngas Process and Testing of Syngas Derived Ultra-clean Fuels in Diesel Engines and Fuel Cells

Description: This topical report summarizes work accomplished for the Program from November 1, 2001 to December 31, 2002 in the following task areas: Task 1: Materials Development; Task 2: Composite Development; Task 4: Reactor Design and Process Optimization; Task 8: Fuels and Engine Testing; 8.1 International Diesel Engine Program; 8.2 Nuvera Fuel Cell Program; and Task 10: Program Management. Major progress has been made towards developing high temperature, high performance, robust, oxygen transport elements. In addition, a novel reactor design has been proposed that co-produces hydrogen, lowers cost and improves system operability. Fuel and engine testing is progressing well, but was delayed somewhat due to the hiatus in program funding in 2002. The Nuvera fuel cell portion of the program was completed on schedule and delivered promising results regarding low emission fuels for transportation fuel cells. The evaluation of ultra-clean diesel fuels continues in single cylinder (SCTE) and multiple cylinder (MCTE) test rigs at International Truck and Engine. FT diesel and a BP oxygenate showed significant emissions reductions in comparison to baseline petroleum diesel fuels. Overall through the end of 2002 the program remains under budget, but behind schedule in some areas.
Date: December 31, 2002
Creator: Robinson, E. T.; Meagher, James P.; Apte, Prasad; Gui, Xingun; Bulicz, Tytus R.; Aasland, Siv et al.
Partner: UNT Libraries Government Documents Department

SHARING AND DEPLOYING INNOVATIVE INFORMATION TECHNOLOGY SOLUTIONS TO MANAGE WASTE ACROSS THE DOE COMPLEX

Description: There has been a need for a faster and cheaper deployment model for information technology (IT) solutions to address waste management needs at US Department of Energy (DOE) complex sites for years. Budget constraints, challenges in deploying new technologies, frequent travel, and increased job demands for existing employees have prevented IT organizations from staying abreast of new technologies or deploying them quickly. Despite such challenges, IT organizations have added significant value to waste management handling through better worker safety, tracking, characterization, and disposition at DOE complex sites. Systems developed for site-specific missions have broad applicability to waste management challenges and in many cases have been expanded to meet other waste missions. Radio frequency identification (RFID) and global positioning satellite (GPS)-enabled solutions have reduced the risk of radiation exposure and safety risks. New web-based and mobile applications have enabled precision characterization and control of nuclear materials. These solutions have also improved operational efficiencies and shortened schedules, reduced cost, and improved regulatory compliance. Collaboration between US Department of Energy (DOE) complex sites is improving time to delivery and cost efficiencies for waste management missions with new information technologies (IT) such as wireless computing, global positioning satellite (GPS), and radio frequency identification (RFID). Integrated solutions developed at separate DOE complex sites by new technology Centers of Excellence (CoE) have increased material control and accountability, worker safety, and environmental sustainability. CoEs offer other DOE sister sites significant cost and time savings by leveraging their technology expertise in project scoping, implementation, and ongoing operations.
Date: January 31, 2011
Creator: Crolley, R. & Thompson, M.
Partner: UNT Libraries Government Documents Department

High Permeability Ternary Palladium Alloy Membranes with Improved Sulfur and Halide Tolerances

Description: The project team consisting of Southwest Research Institute{reg_sign} (SwRI{reg_sign}), Georgia Institute of Technology (GT), the Colorado School of Mines (CSM), TDA Research, and IdaTech LLC was focused on developing a robust, poison-tolerant, hydrogen selective free standing membrane to produce clean hydrogen. The project completed on schedule and on budget with SwRI, GT, CSM, TDA and IdaTech all operating independently and concurrently. GT has developed a robust platform for performing extensive DFT calculations for H in bulk palladium (Pd), binary alloys, and ternary alloys of Pd. Binary alloys investigated included Pd96M4 where M = Li, Na, Mg, Al, Si, Sc, Ti, V, Cr, Mn, Fe, Co, Ni, Cu, Zn, Ga, Y, Zr, Nb, Mo, Tc, Ru, Rh, Ag, Cd, In, Sn, Sb, Te, Hf, Ta, W, Re, Os, Ir, Pt, Au, Tl, Pb, Bi, Ce, Sm, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu. They have also performed a series of calculations on Pd{sub 70}Cu{sub 26}Ag{sub 4}, Pd{sub 70}Cu{sub 26}Au{sub 4}, Pd{sub 70}Cu{sub 26}Ni{sub 4}, Pd{sub 70}Cu{sub 26}Pt{sub 4}, and Pd{sub 70}Cu{sub 26}Y{sub 4}. SwRI deposited and released over 160 foils of binary and ternary Pd alloys. There was considerable work on characterizing and improving the durability of the deposited foils using new alloy compositions, post annealing and ion bombardment. The 10 and 25 {micro}m thick films were sent to CSM, TDA and IdaTech for characterization and permeation testing. CSM conducted over 60 pure gas permeation tests with SwRI binary and ternary alloy membranes. To date the PdAu and PdAuPt membranes have exhibited the best performance at temperatures in the range of 423-773 C and their performance correlates well with the predictions from GT. TDA completed testing under the Department of Energy (DOE) WGS conditions on over 16 membranes. Of particular interest are the PdAuPt alloys that exhibited only a 20% ...
Date: December 31, 2010
Creator: Coulter, K.
Partner: UNT Libraries Government Documents Department

Improved Performance of an Air Cooled Condenser (ACC) Using SPX Wind Guide Technology at Coal-Based Thermoelectric Power Plants

Description: This project added a new airflow enhancement technology to an existing ACC cooling process at a selected coal power plant. Airflow parameters and efficiency improvement for the main plant cooling process using the applied technology were determined and compared with the capabilities of existing systems. The project required significant planning and pre-test execution in order to reach the required Air Cooled Condenser system configuration for evaluation. A host Power Plant ACC system had to be identified, agreement finalized, and addition of the SPX ACC Wind Guide Technology completed on that site. Design of the modification, along with procurement, fabrication, instrumentation, and installation of the new airflow enhancement technology were executed. Baseline and post-modification cooling system data was collected and evaluated. The improvement of ACC thermal performance after SPX wind guide installation was clear. Testing of the improvement indicates there is a 5% improvement in heat transfer coefficient in high wind conditions and 1% improvement at low wind speed. The benefit increased with increasing wind speed. This project was completed on schedule and within budget.
Date: December 31, 2010
Creator: Mortensen, Ken
Partner: UNT Libraries Government Documents Department