Search Results

open access

System design description for portable 1,000 CFM exhauster Skids POR-007/Skid E and POR-008/Skid F

Description: The primary purpose of the two 1,000 CFM Exhauster Skids, POR-007-SKID E and POR-008-SKID F, is to provide backup to the waste tank primary ventilation systems for tanks 241-C-106 and 241-AY-102, and the AY-102 annulus in the event of a failure during the sluicing of tank 241-C-106 and subsequent transfer of sluiced waste to 241-AY-102. This redundancy is required since both of the tank ventilation systems have been declared as Safety Class systems.
Date: July 25, 1998
Creator: Nelson, O. D.
Partner: UNT Libraries Government Documents Department
open access

Hispanic Environmental and Waste Management Outreach Project

Description: The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation o… more
Date: July 25, 1998
Creator: Puente, Sebastian
Partner: UNT Libraries Government Documents Department
open access

Project W-320, 241-C-106 sluicing: Piping calculations. Volume 2

Description: This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objectives of this calculation are (1) To perform static and Safety Class 2 dynamic stress analysis of the Slurry and Supernate Process (inner) piping connecting Tanks 241-C-106 and 241-AY-102 in order to be in compliance with the Code requirements; (2) To assure the thermal expansion of the process pipe not be strained by the outer encasement pipe; and (3) To furnish process pipe… more
Date: July 25, 1998
Creator: Bailey, J. W.
Partner: UNT Libraries Government Documents Department
open access

Tank 241-C-106 waste retrieval sluicing system process control plan

Description: Project W-320 has installed the Waste Retrieval Sluicing System at the 200 East Area on the Hanford Site to retrieve the sludge from single-shell tank 241-C-106 and transfer it into double-shell tank 241-AY-102. Operation of the WRSS process will resolve the high-heat safety issue for tank 241-C-106 and demonstrate a technology for the retrieval of single-shell tank wastes. This process control plan coordinates the technical operating requirements (primarily mass transfer, temperature, and flam… more
Date: July 25, 1998
Creator: Carothers, K.G.
Partner: UNT Libraries Government Documents Department
open access

W-320, waste retrieval sluicing system: Operational start up plan

Description: This plan details the sequence of activities and identifies the organizational roles and responsibilities to ensure a safe startup of the Waste Retrieval Sluicing System (WRSS). This start up plan identifies the activities which must be performed during the initial startup as well as the document which directs each step. This startup plan does not authorize or direct any specific field activities or authorize a change of configuration. As such, this plan does not require a USQ screening.
Date: July 25, 1998
Creator: Bevins, R.R.
Partner: UNT Libraries Government Documents Department
open access

Project W-320, waste retrieval sluicing system: BIO/SER implementation matrices

Description: This document provides verification that the safety related commitments specified in HNF-SD-WM-810-001, Addendum 1 for the Waste Retrieval Sluicing System, Project W-320 and Project W-320 Safety Evaluation Report (SER), have been implemented in the project hardware, procedures and administrative controls. Four appendices include matrices which show where the 810 commitments are implemented for limiting conditions of operation and surveillance requirements controls, administrative controls, defe… more
Date: July 25, 1998
Creator: Bailey, J. W.
Partner: UNT Libraries Government Documents Department
open access

Verification and validation interim report for portable 1,000 CFM exhauster skids POR-007/Skid E and POR-008/Skid F

Description: This Verification and Validation (V/V) interim report summarizes to date the results of the V/V tasks performed in each of the following life cycle phases: concept, requirements, design, implementation, test, installation and checkout, and operation and maintenance. At the end of the installation and checkout phase, the V/V final report will be issued. This interim report contains or references the following for each phase: Description of V/V tasks performed; Summary of task results; Summary of… more
Date: July 25, 1998
Creator: Nelson, O. D.
Partner: UNT Libraries Government Documents Department
open access

Project W-320, backup: 1000 CFM portable exhausters acceptance for beneficial use

Description: This document is to identify the Project W-320 1000 CFM portable exhauster documentation required to be turned over from the Projects Organization to the Tank Farm Operations as part of the acceptance of the 1000 CFM portable exhausters for beneficial use.
Date: July 25, 1998
Creator: Nelson, O. D.
Partner: UNT Libraries Government Documents Department
open access

Portable exhauster POR-007/Skid E and POR-008/Skid F storage plan

Description: This document provides storage requirements for 1,000 CFM portable exhausters POR-O07/Skid E and POR-008/Skid F. These requirements are presented in three parts: preparation for storage, storage maintenance and testing, and retrieval from storage. The exhauster component identification numbers listed in this document contain the prefix POR-007 or POR-008 depending on which exhauster is being used.
Date: July 25, 1998
Creator: Nelson, O. D.
Partner: UNT Libraries Government Documents Department
open access

Project W-320, WRSS PCP: Procedure implementation verification

Description: This document provides verification that the methodology for the safe retrieval of high-heat waste from Tank 241-C-106 as specified in the WRSS Process Control Plan HNF-SD-PCP-013, Revision 1, has been adequately implemented into the Tank Waste Remediation System (TWRS) operational procedures. Tank 241-C-106 is listed on the High Heat Load Watch List.
Date: July 25, 1998
Creator: Bailey, J. W.
Partner: UNT Libraries Government Documents Department
open access

Medical waste irradiation study. Final report

Description: The North Star Research Corporation Medical Waste project is described in this report, with details of design, construction, operation, and results to date. The project began with preliminary design of the accelerator. The initial design was for a single accelerator chamber with a vacuum tube cavity driver built into the chamber itself, rather than using a commercial tube separate from the RF accelerator. The authors believed that this would provide more adjustability and permit better coupling… more
Date: July 25, 1998
Creator: Adler, R.J.; Stein, J. & Nygard, J.
Partner: UNT Libraries Government Documents Department
captions transcript

[News Clip: Hot air balloons]

Description: Video footage from the KXAS-TV/NBC station in Fort Worth, Texas, to accompany a news story.
Date: July 25, 1998, 6:00 p.m.
Duration: 1 minute 18 seconds
Creator: KXAS-TV (Television station : Fort Worth, Tex.)
Partner: UNT Libraries Special Collections
Back to Top of Screen