Search Results

3 GeV Booster Synchrotron Conceptual Design Report

Description: Synchrotron light cna be produced from a relativistic particle beam circulating in a storage ring at extremely high intensity and brilliance over a large spectral region reaching from the far infrared regime to hard x-rays. The particles, either electrons or positrons, radiate as they are deflected in the fields of the storage ring bending magnets or of magnets specially optimized for the production of synchrotron light. The synchrotron light being very intense and well collimated in the forward direction has become a major tool in a large variety of research fields in physics, chemistry, material science, biology, and medicine.
Date: June 2, 2009
Creator: Wiedemann, Helmut
Partner: UNT Libraries Government Documents Department

324 Building safety basis criteria document

Description: The Safety Basis Criteria document describes the proposed format, content, and schedule for the preparation of an updated Safety Analysis Report (SAR) and Operational Safety Requirements document (OSR) for the 324 Building. These updated safety authorization basis documents are intended to cover stabilization and deactivation activities that will prepare the facility for turnover to the Environmental Restoration Contractor for final decommissioning. The purpose of this document is to establish the specific set of criteria needed for technical upgrades to the 324 Facility Safety Authorization Basis, as required by Project Hanford Procedure HNF-PRO-705, Safety Basis Planning, Documentation, Review, and Approval.
Date: June 2, 1999
Creator: STEFFEN, J.M.
Partner: UNT Libraries Government Documents Department

1998 Comprehensive TNX Area Annual Groundwater and Effectiveness Monitoring Report

Description: Shallow groundwater beneath the TNX Area at the Savannah River Site has been contaminated with chlorinated volatile organic compounds such as trichloroethylene and carbon tetrachloride. The Interim Action T-1 Air Stripper System began operation on September 16, 1996. A comprehensive groundwater monitoring program was initiated to measure the effectiveness of the system. The Interim Action is meeting its objectives and is capable of continuing to do so until the final groundwater remedial action is in place.
Date: June 2, 1999
Creator: Chase, J.
Partner: UNT Libraries Government Documents Department