Search Results

Primary view of A 1 Megawatt Polyphase Boost Converter-Modulator for Klystron Pulse Application
Reass, W. A.; Doss, J. D. & Gribble, R. F.
June 1, 2001
Primary view of 1 nA beam position monitoring system
Ursic, R.; Flood, R. & Piller, C.
June 1, 1997
Primary view of A 2-Megawatt load for testing high voltage dc power supplies
Horan, D.; Kustom, R.; Ferguson, M. & Primdahl, K.
June 1, 1993
Primary view of A 2-MV multi-beam injector for heavy ion fusion
Rutkowski, H. L.; Faltens, A.; Vanecek, D.; Pike, C.; Humphries, S., Jr. & Meyer, E. A.
June 1, 1988
Primary view of 3.9 GHz superconducting accelerating 9-cell cavity vertical test results
Khabiboulline, Timergali; Cooper, Charles; Dhanaraj, Nandhini; Edwards, Helen; Foley, Mike; Harms, Elvin et al.
June 1, 2007
Primary view of 3.9 GHz superconducting accelerating 9-cell cavity vertical test results
Khabiboulline, Timergali; Cooper, Charles; Dhanaraj, Nandhini; Edwards, Helen; Foley, Mike; Harms, Elvin et al.
June 1, 2007
Primary view of 3-D hybrid PIC code to model the tilt mode in FRCs
Horowitz, E. J. & Shumaker, D. E.
June 1, 1987
Primary view of 3-D Seismic Experimentation and Advanced Processing/Inversion Development for Investigations of the Shallow Subsurface
Levander, Alan R.
June 1, 2005
Primary view of 3-D Spectral IP Imaging: Non-Invasive Characterization of Contaminant Plumes. 1998 Annual Progress Report
Morgan, F. D.; Rodi, W. & Lesmes, D.
June 1, 1998
Primary view of 3-megajoule heavy-ion fusion driver
Faltens, A.; Hoyer, E. & Keefe, D.
June 1, 1981
Primary view of [3 men pictured at WBAP's new tower site]
WBAP-TV (Television station : Fort Worth, Tex.)
June 1, 1964
Primary view of The 4.8 GHz LHC Schottky pick-up system
Caspers, Fritz; Jimenez, Jose Miguel; Jones, Rhodri Owain; Kroyer, Tom; Vuitton, Christophe; Hamerla, Timothy W. et al.
June 1, 2007
Primary view of 4 kW Test of Solid Oxide Electrolysis Stacks with Advanced Electrode-Supported Cells
O'Brien, J. E.; Zhang, X.; Housley, G. K.; Moore-McAteer, L. & Tao, G.
June 1, 2012
Primary view of 5. annual clean coal technology conference: powering the next millennium. Volume 2
unknown creator
June 1, 1997
Primary view of 5-level polysilicon surface micromachine technology: Application to complex mechanical systems
Rodgers, M. S. & Sniegowski, J. J.
June 1, 1998
Primary view of An 8 GeV H- multi-turn injection system for the Fermilab Main Injector
Johnson, D. E.; Yoon, P.; Liaw, C. J.; Raparia, D. & Bebee-Wang, J.
June 1, 2007
Primary view of An 8 GeV H- multi-turn injection system for the Fermilab Main Injector
Johnson, D. E.; Yoon, P.; Liaw, C. J.; Raparia, D. & Bebee-Wang, J.
June 1, 2007
Primary view of 10 microsecond time resolution studies of Cygnus X-1
Wen, H.C.
June 1, 1997
Primary view of 50-MW X-band klystron sources for the next generation of linear colliders
Caryotakis, G.; Eppley, K.; Fant, K.; Fowkes, R.; Phillips, R.; Tantawi, S. et al.
June 1, 1994
Primary view of 64 kW concentrator Photovoltaics Application Test Center. Volume. Final report
Jardine, D.M. & Jones, D.W.
June 1, 1980
Primary view of A 96 channel receiver for the ILCTA LLRF system at Fermilab
Mavric, Uros; Chase, Brian; Branlard, Julien; Cullerton, Ed & Klepec, Dan
June 1, 2007
Primary view of 100-B Area flow analysis
Bainard, W. D.
June 1, 1957
Primary view of 100-B Unit purge June 14, 1945
Dahlen, P. A.
June 1, 1945
Primary view of 200% Efficient Singlet Fission Observed (Fact Sheet)
unknown creator
June 1, 2011
Back to Top of Screen