Search Results

Defense Authorization and Appropriations Bills: FY1970-FY2017

Description: This report is a research aid that lists the Department of Defense (DOD) authorization bills (Table 1) and appropriations bills (Table 2) for FY1970-FY2017. This report includes all the pertinent information on the passage of these bills through the legislative process: bill numbers, report numbers, dates reported and passed, recorded vote numbers and vote tallies, dates of passage of the conference reports with their numbers and votes, vetoes, substitutions, dates of final passage, and public law numbers.
Date: January 18, 2017
Creator: DeBruyne, Nese F.
Partner: UNT Libraries Government Documents Department

300 Area D4 Project 3rd Quarter Fiscal Year 2006 Building Completion Report

Description: This report documents the deactivation, decontamination, decommissioning, and demolition of five buildings in the 300 Area of the Hanford Site. The D4 of these facilities included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation as appropriate.
Date: September 25, 2006
Creator: Smith, D. S.
Partner: UNT Libraries Government Documents Department

300 Area D4 Project 2nd Quarter FY06 Building Completion Report

Description: This report documents the deactivation, decontamination, decommissioning, and demolition of 16 buildings in the 300 Area of the Hanford Site. The D4 of these facilities included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation as appropriate.
Date: June 26, 2006
Creator: Smith, David S.
Partner: UNT Libraries Government Documents Department

300 Area D4 Project 1st Quarter Fiscal Year 2006 Building Completion Report

Description: This report documents the deactivation, decontamination, decommissioning, and demolition of the MO-052, 3225, 334, 334A, and 334-TF Buildings in the 300 Area of the Hanford Site. The D4 of these facilities included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation as appropriate.
Date: April 20, 2006
Creator: Smith, David S.
Partner: UNT Libraries Government Documents Department

300 Area D4 Project 4th Quarter Fiscal Year 2006 Building Completion Report

Description: This report documents the deactivation, decontamination, decommissioning, and demolition (D4) of nine buildings in the 300 Area of the Hanford Site. The D4 of these facilities included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation, as appropriate.
Date: January 30, 2007
Creator: Smith, D. S.
Partner: UNT Libraries Government Documents Department

200-BP-1 Prototype Hanford Barrier Annual Monitoring Report for Fiscal Years 2005 Through 2007

Description: A prototype Hanford barrier was deployed over the 216-B-57 Crib at the Hanford Site in 1994 to prevent percolation through the underlying waste and to minimize spreading of buried contaminants. This barrier is being monitored to evaluate physical and hydrologic performance at the field scale. This report summarizes data collected during the period FY 2005 through FY 2007. In FY 2007, monitoring of the prototype Hanford barrier focused on barrier stability, vegetative cover, evidence of plant and animal intrusion, and the main components of the water balance, including precipitation, runoff, storage, drainage, and deep percolation. Owing to a hiatus in funding in FY 2005 through 2006, data collected were limited to automated measurements of the water-balance components. For the reporting period (October 2004 through September 2007) precipitation amount and distribution were close to normal. The cumulative amount of water received from October 1994 through September 2007 was 3043.45 mm on the northern half of the barrier, which is the formerly irrigated treatment, and 2370.58 mm on the southern, non-irrigated treatments. Water storage continued to show a cyclic pattern, increasing in the winter and declining in the spring and summer to a lower limit of around 100 mm in response to evapotranspiration. The 600-mm design storage has never been exceeded. For the reporting period, the total drainage from the soil-covered plots ranged from near zero amounts under the soil-covered plots to almost 20 mm under the side slopes. Over the 13-yr monitoring period, side slope drainage accounted for about 20 percent of total precipitation while the soil-covered plots account for only 0.12 mm total. Above-asphalt and below-asphalt moisture measurements show no evidence of deep percolation of water. Topographic surveys show the barrier and protective side slopes to be stable. Plant surveys show a relatively high coverage of native plants still persists ...
Date: February 1, 2008
Creator: Ward, Andy L.; Link, Steven O.; Strickland, Christopher E.; Draper, Kathryn E. & Clayton, Ray E.
Partner: UNT Libraries Government Documents Department

FY2005 AND FY2006 CORROSION SURVEILLANCE RESULTS FOR L BASIN

Description: This report documents the results of the L-Basin Corrosion Surveillance Program for the fiscal years 2005 and 2006. The water quality and basin conditions for the coupon immersion period are compared to the corrosion evaluation results from detailed metallurgical analysis of the coupons. Test coupons were removed from the basin on two occasions, March 29, 2005 and May 23, 2006, examined and photographed. Selected coupons were metallurgically characterized to evaluate the extent of general corrosion and pitting. Crystallographic and energy dispersive spectroscopy analysis were performed on a typical specimen, as-removed from the basin, to characterize the surface debris. Marked changes were noted in both the 2005 and 2006 specimens compared to previous years corrosion results. A new pitting incidence has occurred on the faces of the aluminum coupons compared to localized pitting at crevice regions only on specimens withdrawn in 2003 and 2004. The pitting incidence is attributed to sand filter fines that entered the basin on July 27, 2004 from an inadvertent backflush of the new sand filter. Pitting rate results show a trend of slowing down over time which is consistent with aluminum pit kinetics. Average pit growth rates were equal to or lower in all 2006 aluminum coupons than those removed in 2005. A trend line shows that pitting corrosion rates on Al1100, 6061, and 6063 coupons are slowing down since pit depth measurements were initiated in 2003. No impact to stored spent fuel is expected from the debris. The storage configuration of the majority of L-Basin spent fuel, in bundles, should provide a measure of isolation from debris settling in the basin.
Date: January 30, 2008
Creator: Vormelker, P & Cynthia Foreman, C
Partner: UNT Libraries Government Documents Department

FreedomCAR and vehicle technologies heavy vehicle program FY 2006. Benefits analysis : methodology and results - final report.

Description: This report describes the approach to estimating benefits and the analysis results for the Heavy Vehicle Technologies activities of the Freedom Car and Vehicle Technologies (FCVT) Program of EERE. The scope of the effort includes: (1) Characterizing baseline and advanced technology vehicles for Class 3-6 and Class 7 and 8 trucks, (2) Identification of technology goals associated with the DOE EERE programs, (3) Estimating the market potential of technologies that improve fuel efficiency and/or use alternative fuels, (4) Determining the petroleum and greenhouse gas emissions reductions associated with the advanced technologies. In FY 05 the Heavy Vehicles program activity expanded its technical involvement to more broadly address various sources of energy loss as compared to focusing more narrowly on engine efficiency and alternative fuels. This broadening of focus has continued in the activities planned for FY 06. These changes are the result of a planning effort that occurred during FY 04 and 05. (Ref. 1) This narrative describes characteristics of the heavy truck market as they relate to the analysis, a description of the analysis methodology (including a discussion of the models used to estimate market potential and benefits), and a presentation of the benefits estimated as a result of the adoption of the advanced technologies. These benefits estimates, along with market penetrations and other results, are then modeled as part of the EERE-wide integrated analysis to provide final benefit estimates reported in the FY06 Budget Request.
Date: January 31, 2006
Creator: Singh, M.; Systems, Energy & TA Engineering, Inc.
Partner: UNT Libraries Government Documents Department

Quarterly progress report for Q1 FY06 for Complex Transient Events in Materials Studied Using Ultrafast Electron Probes and Terascale Simulation (FWP SCW0289)

Description: This quarter (Q1 FY06) marked the first time that the LLNL dynamic transmission electron microscope (DTEM) configuration had advanced to the point whereby it was possible to conduct in-situ experiments on specimens. DTEM improvements continue to progress at a rapid pace. We summarize important achievements in the following list: (1) Instrument performance and design improvements - (a) Reproducibly achieving >1 x 10{sup 7} e{sup -} per pulse. Adjustments in the cathode laser system design led to an improved quantum efficiency and electron yield per pulse. The current number of electrons in the pulse is sufficient for acquiring high quality, single-shot electron diffraction patterns. (b) Implementation of computer interface and Labview{reg_sign} programs for cathode and specimen drive alignment and cathode and pump laser trigger and delay settings. These controls provide a user friendly interface and ease in the experimental setup and implementation. (c) Cathode test chamber (offline test apparatus to asses photocathode design and laser induced photoemission) construction has been completed. (2) Notable instrument features brought into service - (a) Drive laser system was enhanced to improve beam shape and uniformity and to include continuous laser energy monitoring. The drive laser spot size on the specimen was also reduced from 70 {mu}m x 110 {mu}m to 50 {mu}m x 75 {mu}m. (b) New phosphor coated face plate manufactured by TVIPS was installed. The sensitivity and signal noise ratio improved by factor 2 (sensitivity {approx}110 CCD counts/e{sup -} and signal to noise ratio {approx}5). (3) Experimental Progress - (a) First time-resolved experiment: observation of the {alpha} (hcp) to {beta} (bcc) phase transition in pure Ti films via single shot electron diffraction. Results of this experiment were published in the MRS Fall 2005 proceedings and are under review for article in the FEMMS proceedings, which will to be published in Journal of Material ...
Date: December 27, 2005
Creator: Campbell, G.
Partner: UNT Libraries Government Documents Department

FY 2006 ANNUAL REVIEW-SALTSTONE DISPOSAL FACILITY PERFORMANCE ASSESSMENT

Description: The Z-Area Saltstone Disposal Facility (SDF) consists of two disposal units, Vaults 1 and 4, described in the Performance Assessment (PA) (WSRC 1992). The FY06 PA Annual Review concludes that both vaults contain much lower levels of radionuclides (curies) than that allowed by the PA. The PA controls established to govern waste operations and monitor disposal facility performance are determined to be adequate.
Date: March 15, 2007
Creator: Crapse, K & Benjamin Culbertson, B
Partner: UNT Libraries Government Documents Department

FY2006 Engineering Tech Base Report: Defect Detection in Large CT Image Sets

Description: This image analysis project is constructing a tool for performing computer assisted detection of defects in large CT data sets. We address two primary challenges: proving an algorithm that can reliably highlight the objects of interest, and coupling this algorithm to efficient and effective data management and interface routines. The goal of this project is to create an end to end tool that will efficiently extract from large CT data sets a manageable set of candidate defects that highlights 100% of the unambiguous (to a trained analyst) true defects and as many as possible of the ambiguous objects. Objective metrics for defect ambiguity are elusive given the ill defined nature of both the defects and their CT images (e.g., variations in size and contrast, defect/object density gradients). Therefore the true metric of success will be gaining the confidence of the Weapons Program NDE analysts in this tool, which will be a qualitative function of efficiency and accuracy. In consultation with Weapons Program NDE analysts voids it was decided to focus this initial effort on searching for small voids (order of tenths to tens of millimeters in extent). The program has produced a Tungsten ring with surrogate defects drilled into it (Figure 1) that they use for studying the ability of their systems and analysts to detect this class of defects.
Date: September 18, 2006
Creator: Poland, D N; Lopez, A; Manay, S & Sengupta, S
Partner: UNT Libraries Government Documents Department

FY06 LDRD Final Report Data Intensive Computing

Description: The goal of the data intensive LDRD was to investigate the fundamental research issues underlying the application of High Performance Computing (HPC) resources to the challenges of data intensive computing. We explored these issues through four targeted case studies derived from growing LLNL programs: high speed text processing, massive semantic graph analysis, streaming image feature extraction, and processing of streaming sensor data. The ultimate goal of this analysis was to provide scalable data management algorithms to support the development of a predictive knowledge capability consistent with the direction of Aurora.
Date: February 13, 2007
Creator: Abdulla, G M
Partner: UNT Libraries Government Documents Department

FY06 LDRD Final Report "Development of Computational Techniques For Decoding The Language of Genomes"

Description: This project was aimed at developing computational methods and tools to decipher the universal language of gene regulation encoded in genomes. It was proposed to identify and decipher the code and to functionally annotate genomic elements that orchestrate the temporal and spatial dynamics of gene expression in living cells.
Date: January 9, 2007
Creator: Ovcharenko, I
Partner: UNT Libraries Government Documents Department

FY06 LDRD Final Report Next-generation x-ray optics: focusing hard x-rays

Description: The original goal of our research was to open up a new class of scientific experiments by increasing the power of newly available x-ray sources by orders of magnitude. This was accomplished by developing a new generation of x-ray optics, based on hard x-ray (10-200 keV) reflective and diffractive focusing elements. The optical systems we envision begin with a core reflective optic, which has the ability to capture and concentrate x-rays across a wide range of energies and angles band, combined with diffractive optics, based on large-scale multilayer structures, that will further enhance the spatial, spectral and temporal resolving power of the system. Enabling technologies developed at LLNL such as precise mounting of thermally formed substrates, smoothing techniques and multilayer films of ultra-high reflectance and precision were crucial in the development and demonstration of our research objectives. Highlights of this phase of the project include: the design and fabrication of a concentrator optic for the Pleiades Thomson X-ray source located at LLNL, smoothing of glass substrates through application of polyimide films, and the design, fabrication and testing of novel volume multilayers structures. Part of our research into substrate smooth led to the development of a new technique (patent pending) to construct high-quality, inexpensive x-ray optics. This innovation resulted in LLNL constructing a x-ray optic for the CERN Axion Solar Telescope (CAST) and allowed LLNL to join the international experiment.
Date: March 1, 2007
Creator: Pivovaroff, M & Soufli, R
Partner: UNT Libraries Government Documents Department

FY06 LDRD Final Report "The Creation of a Neutron Star Atmosphere"

Description: We have taken the initiative to examine whether experiments on HED facilities, present and future, could achieve the extreme scaled conditions relevant to accreting neutron star atmospheres and accretion disks around black holes. The preliminary conclusion from this detailed scaling assessment is that if an exact scaled version of the photon bubble instability physics is desired, this will require experiments with (simultaneously) spatial scales of order {approx}1 mm, temperatures of order {approx}5 keV, magnetic fields of order a hundred megaGauss, and time scales of order several hundred psec. Aspects (subsets) of this physics can be studied under less demanding conditions. To achieve the temperatures required in targets of order several optical depths, we come to the preliminary conclusion that we would require an energy source that delivers of order of a megajoule of energy into a high Z target. A conceptual design for such an experiment could be to use the energy from a high gain ignition NIF capsule as our principle source of heating and acceleration whereby the target is in close proximity to the ignition capsule and then use external petawatt lasers to develop the magnetic fields required.
Date: March 1, 2007
Creator: Klein, R I; Remington, B; Moon, S; MacKinnon, A; Patel, P; Ruytov, D et al.
Partner: UNT Libraries Government Documents Department

FY06 Engineering Research and Technology Report

Description: This report summarizes the core research, development, and technology accomplishments in Lawrence Livermore National Laboratory's Engineering Directorate for FY2006. These efforts exemplify Engineering's more than 50-year history of developing and applying the technologies needed to support the Laboratory's national security missions. A partner in every major program and project at the Laboratory throughout its existence, Engineering has prepared for this role with a skilled workforce and technical resources developed through both internal and external venues. These accomplishments embody Engineering's mission: ''Enable program success today and ensure the Laboratory's vitality tomorrow''. Engineering's investment in technologies is carried out primarily through two internal programs: the Laboratory Directed Research and Development (LDRD) program and the technology base, or ''Tech Base'', program. LDRD is the vehicle for creating technologies and competencies that are cutting-edge, or require discovery-class research to be fully understood. Tech Base is used to prepare those technologies to be more broadly applicable to a variety of Laboratory needs. The term commonly used for Tech Base projects is ''reduction to practice''. Thus, LDRD reports have a strong research emphasis, while Tech Base reports document discipline-oriented, core competency activities. This report combines the LDRD and Tech Base summaries into one volume, organized into six thematic technical areas: Engineering Modeling and Simulation; Measurement Technologies; Micro/Nano-Devices and Structures; Precision Engineering; Engineering Systems for Knowledge and Inference; and Energy Manipulation.
Date: January 22, 2007
Creator: Minichino, C; Alves, S W; Anderson, A T; Bennett, C V; Brown, C G; Brown, W D et al.
Partner: UNT Libraries Government Documents Department

FY06 LDRD Final Report: Broadband Radiation and Scattering

Description: This is the final report for LDRD 01-ERD-005. The Principle Investigator was Robert Sharpe. Collaborators included Niel Madsen, Benjamin Fasenfest, John D. Rockway, of the Defense Sciences Engineering Division (DSED), Vikram Jandhyala and James Pingenot from the University of Washington, and Mark Stowell of the Center for Applications Development and Software Engineering (CADSE). It should be noted that Benjamin Fasenfest and Mark Stowell were partially supported under other funding. The purpose of this LDRD effort was to enhance LLNL's computational electromagnetics capability in the area of broadband radiation and scattering. For radiation and scattering problems our transient EM codes are limited by the approximate Radiation Boundary Conditions (RBC's) used to model the radiation into an infinite space. Improved RBC's were researched, developed, and incorporated into the existing EMSolve finite-element code to provide a 10-100x improvement in the accuracy of the boundary conditions. Section I provides an introduction to the project and the project goals. Section II provides a summary of the project's research and accomplishments as presented in the attached papers.
Date: March 8, 2007
Creator: Madsen, N; Fasenfest, B; White, D; Stowell, M; Sharpe, R; Jandhyala, V et al.
Partner: UNT Libraries Government Documents Department

Groundwater Level Status Report for Fiscal Year 2006 Los Alamos National Laboratory

Description: The status of groundwater level monitoring at Los Alamos National Laboratory in Fiscal Year 2006 is provided in this report. The Groundwater Level Monitoring Project was instituted in 2005 for providing a framework for the collection and processing of quality controlled groundwater level data. This report summarizes groundwater level data for 158 monitoring wells, including 43 regional aquifer wells, 23 intermediate wells, and 92 alluvial wells. Pressure transducers were installed in 132 monitoring wells for continuous monitoring of groundwater levels. Time-series hydrographs of groundwater level data are presented along with pertinent construction and location information for each well.
Date: March 30, 2007
Creator: Allen, Shannon P. & Koch, Richard J.
Partner: UNT Libraries Government Documents Department

Quarterly progress report for Q2 FY06 for Complex Transient Events in Materials Studied Using Ultrafast Electron Probes and Terascale Simulation (FWP SCW0289)

Description: In this quarter (Q2 FY06), the DTEM underwent a substantial reconfiguration of its laser systems. The cathode laser system was changed to provide greater numbers of electrons per pulse by lengthening the time duration of the pulse to 30 ns. The greater number of electrons per pulse has allowed us to acquire high quality pulsed images and diffraction patterns. The spatial resolution in the single pulsed image has been measured at better than 20 nm. The diffraction patterns are now more comparable to conventional electron microscope operation. Examples are found in the body of the report. We summarize important achievements in the following list: (1) Instrument performance and design improvements--(A) The laser system was changed for the cathode photoemission system (75 ns at 1053 nm wavelength converted to 30ns at 211 nm wavelength) to give longer electron pulses at the same current to yield more electrons per pulse. (B) New specimen drive laser constructed. (C) New computer monitored and controlled alignment systems installed for both laser systems to facilitate laser alignment through a user friendly computer interface. (2) Experimental Progress--(A) The spatial resolution of pulsed images was tested by imaging a cross-section of multilayer thin foils with 30 nm and 20 nm periods. Single pulse images were observed to have spatial resolution better than 20 nm. This combination of 20 nm spatial and 30 ns temporal resolution is thought to be highest combined spatial and temporal measurement ever made. (B) The quality of single pulse electron diffraction patterns have been improved to the point where differentiating the HCP from BCC patterns in Ti is substantially easier. The spatial coherence of the electron illumination on the specimen was improved to give much smaller diffraction spots in the pattern.
Date: March 29, 2006
Creator: Campbell, G. H.
Partner: UNT Libraries Government Documents Department

FY06 ANNUAL REPORT FOR ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM PROJECT #95061STRATEGIC DESIGN AND OPTIMIZATION OF INORGANIC SORBENTSFOR CESIUM, STRONTIUM AND ACTINIDES

Description: The basic science goal in this project identifies structure/affinity relationships for selected radionuclides and existing sorbents. The task will apply this knowledge to the design and synthesis of new sorbents that will exhibit increased affinity for cesium, strontium and actinide separations. The target problem focuses on the treatment of high-level nuclear wastes. The general approach can likewise be applied to nonradioactive separations. During the fifth year of the project our studies focused along the following paths: (1) determination of Cs{sup +} ion exchange mechanism in sodium titanium silicates with sitinikite topology and the influence of crystallinity on ion exchange, (2) synthesis and characterization of novel peroxo-titanate materials for strontium and actinide separations, and (3) further refinements in computational models for the CST and polyoxoniobate materials.
Date: August 10, 2006
Creator: Hobbs, D
Partner: UNT Libraries Government Documents Department

FY06 I/O Integration Blueprint

Description: This document provides an understanding of the near and long term computing and I/O resources in the Secure Computing Facility (SCF) and Open Computing Facility (OCF). Requirements for data flows, storage capacities and transfer rates are determined. Recommendations are made for architectures, timeframes for major deliverables, and procurements for the next fiscal year.
Date: April 6, 2006
Creator: Cupps, K; Fitzgerald, K; Gary, M; Shoopman, J; Hamilton, P; Loewe, B et al.
Partner: UNT Libraries Government Documents Department