2,918 Matching Results

Search Results

1.8.2.1.2 Site system engineering implementation Fiscal Year 1998 multi-year work plan

Description: Manage the Site Systems Engineering process to provide a traceable, integrated, requirements-driven, and technically defensible baseline., Through the Site Integration Group, Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering`s primary interfaces are with the Project Direction Office and with the projects, as well as with the Planning organization.
Date: October 3, 1997
Creator: Ferguson, J. E.
Partner: UNT Libraries Government Documents Department

"25" Critically Consultation with J. W. Morfitt : April 3, 1950

Description: Summary: "Criticality was considered impossible in any contingency encountered in practice under either of the following conditions which include no safety factor: (a) In any isolated cylinder not more than 5 in. in disruptor, if the total amount of U235 present does not exceed 7.5 Eg. (b) In an isolated vessel of any shape and size, if the total amount of U235 present does not exceed 880 g. An "isolated" vessel is one which does not "see" more than 0.1 [...] other vessels containing fissionable material."
Date: April 3, 1950
Creator: Merrill, E. T. & Sege., G.
Partner: UNT Libraries Government Documents Department

45-Day safety screen results for tank 241-C-105, push mode, cores 72 and 76

Description: This document is a report of the analytical results for samples collected between March 14 and March 22, 1995 from the radioactive wastes in Tank 241-C-105 at the Hanford Reservation. Core samples were collected from the solid wastes in the tank and underwent safety screening analyses including differential scanning calorimetry, thermogravimetric analysis, and total alpha analysis.
Date: May 3, 1995
Creator: Sasaki, L.M.
Partner: UNT Libraries Government Documents Department

100 Areas technical activities report - physics, July 1951

Description: This is the monthly 100 areas technical activities report for the physics group for the month of July 1951. This group was concerned with pile related studies. Work discussed includes neutron attenuation measurements in pile shielding test facilities, studies of physical properties of shielding materials (concrete), work on a xenon generator and separation facility, further development and shielding work for a neutron spectrometer, continued work on a magnetic spectrometer, and counting equipment. Studies of neutron fluxes from exponential piles, and criticality studies are also discussed.
Date: August 3, 1951
Partner: UNT Libraries Government Documents Department

300 Area Building Retention Evaluation Mitigation Plan

Description: Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.
Date: July 3, 2007
Creator: McBride, D. J.
Partner: UNT Libraries Government Documents Department

T-1020 NaI crystal test for DM-Ice

Description: This is a memorandum of understanding between the Fermi National Accelerator Laboratory (Fermilab) and the experiments of the NaI Crystal Test for DM-Ice from the University of Wisconsin who have committed to participate in detector tests to be carried out during the 2011-2012 Fermilab Neutrino program. The memorandum is intended primarily for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this memorandum to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. The DM-Ice collaboration is designing a sodium-iodide (NaI) based detector for a direct dark matter search. The detectors should have low readout noise and background levels to carry out a sensitive search. A 17-kg version of the experiment is running at the South Pole, 2500 m deep in the Antarctic ice, and a large scale experiment is currently being designed. One of the keys to the success of the experiment is to have a good understanding of the background levels intrinsic in the NaI detectors. To measure the background level, the detectors have to be shielded against cosmic rays. The lead shielding used for DAMIC in the Minos Underground Areas is a well-suited location for this test since it offers enough overburden to shield against cosmic rays, lead shielding, and experimental infrastructure. The goal of the test is to assess the background levels in the detector and to assess the characteristics of phosphorescence induced by muons and 100 keV-3 MeV gamma rays.
Date: November 3, 2011
Creator: Maruyama, Reina; Heeger, Karsten; Pierpoint, Zachary; Pettus, Walter; Broerman, Benjamin; Hilgenberg, Chris et al.
Partner: UNT Libraries Government Documents Department

S. 1783: The Pension Security and Transparency Act of 2005

Description: On September 28, the Senate Finance Committee and the Senate Committee on Health, Education, Labor, and Pensions announced that they had reached a compromise on a pension reform bill for consideration by the full Senate. The compromise bill has been introduced as S. 1783, “The Pension Security and Transparency Act of 2005.” S. 1783 combines provisions of S. 219, “The National Employee Savings and Trust Equity Guarantee Act,” reported by the Finance Committee, and “The Defined Benefit Security Act,” reported by the Committee on Health, Education, Labor, and Pensions. This report summarizes the major provisions of the compromise bill, as announced by the chairmen and ranking members of the two committees.
Date: October 3, 2005
Creator: Purcell, Patrick J.
Partner: UNT Libraries Government Documents Department

1999 Annual Cathodic Protection Survey Report for PFP

Description: This cathodic protection (CP) report documents the results of the 1999 annual CP survey of the underground piping within PFP property. An annual survey of CP systems is required by Washington Administrative Code (WAC). A spreadsheet to document the 1999 annual survey polarization data is included in this report. Graphs are included to trend the cathodic voltages and the polarization voltages at each test station on PFP property. The trending spans from 1994 to 1999. Graphs are also included to trend voltage and amperage outputs of each rectifier during the annual surveys. During the annual survey, resistance testing between the underground piping was conducted at each test station. The testing showed that all piping (with test leads into the test stations) was continuous with every pipe represented in the test stations. The resistance data is not documented in this report but can be accessed in work package 22-99-01003. During the annual survey, the wiring configurations of anode junction boxes AJB(R45-1) and AJB(45-1) were documented. The sketches can be accessed from the JCS work record of work package 22-99-01003. Analysis, conclusions, and recommendations of the 1999 annual CP survey results are included in this report.
Date: October 3, 2000
Creator: BOWMAN, T.J.
Partner: UNT Libraries Government Documents Department

2000 Census: Refinements to Full Count Review Program Could Improve Future Data Quality

Description: A letter report issued by the General Accounting Office with an abstract that begins "To ensure the completeness and accuracy of the 2000 census data, Bureau of the Census analysts were to identify, investigate, and document suspected data discrepancies or issues to clear census data files and products for subsequent processing or public release. They were to determine whether and how to correct the data by weighing quality improvements against time and budget constraints. Because the bureau lacked sufficient staff to conduct a full count review on its own, it contracted out some of the work to members of the Federal-State Cooperative Program for Population Estimates (FSCPE). FSCPE documented 1,402 data issues, 29 percent of the 4,809 issues identified by both FSCPE and bureau analysts during the full count review. Of the 4,809 issues, 1,599 dealt with "group quarters," where counts for prisons, nursing homes, dormitories, and other group living facilities differed from what analysts expected. Of the 1,599 group quarters issues, FSCPE identified 567. Discrepancies relating to housing unit counts, population data, and demographic characteristics accounted for 1,150 issues, 375 of which were identified by FSCPE. Overall, of the 4,809 issues identified during review, 4,267 were not subjected to further investigation by the bureau because of insufficient documentation. Because the bureau's preliminary plans for the 2010 Census include a Full Count Review program, several areas warrant improvement. Foremost among these is the need for the bureau to investigate and resolve a larger number of issues before releasing the public law data."
Date: July 3, 2002
Creator: United States. General Accounting Office.
Partner: UNT Libraries Government Documents Department

2001 Gordon Research Conference on Quantum Control of Light and Matter. Final progress report [agenda and attendee list]

Description: The Gordon Research Conference on Quantum Control of Light and Matter [Quantum Control of Atomic and Molecular Motion] was held at Mount Holyoke College, South Hadley, Massachusetts, July 29 - August 3, 2001. The conference was attended by 119 participants. The attendees represented the spectrum of endeavor in this field, coming from academia, industry, and government laboratories, and included US and foreign scientists, senior researchers, young investigators, and students. Emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate discussion about the key issues in the field today. Session topics included the following: General perspectives, Phase control, Optimal control, Quantum information, Light manipulation and manipulation with light, Control in the condensed phase, Strong field control, Laser cooling and Bose-Einstein Condensate dynamics, and Control in the solid phase.
Date: August 3, 2001
Creator: Shapiro, Moshe
Partner: UNT Libraries Government Documents Department

The 2002 Farm Bill: Overview and Status

Description: The Federal Agriculture Improvement and Reform, or FAIR, Act of 1996 (commonly known as the "farm bill"), which was due to expire in 2002, is expected to be extended for another six years when President Bush signs the bill into law. This report discusses the provisions of the new "farm bill," including the federal spending involved.
Date: July 3, 2002
Creator: Becker, Geoffrey S. & Womach, Jasper
Partner: UNT Libraries Government Documents Department

The 2002 Farm Bill: Overview and Status

Description: The Federal Agriculture Improvement and Reform, or FAIR, Act of 1996 (commonly known as the "farm bill"), which was due to expire in 2002, is expected to be extended for another six years when President Bush signs the bill into law. This report discusses the provisions of the new "farm bill," including the federal spending involved.
Date: May 3, 2002
Creator: Becker, Geoffrey S. & Womach, Jasper
Partner: UNT Libraries Government Documents Department

The 2002 Farm Bill: Overview and Status

Description: This report discusses the provisions of the 1996 farm bill, which was due to expire in 2002 but was extended (P.L. 107-171) for an additional 6 years on May 13, 2002.
Date: June 3, 2002
Creator: Becker, Geoffrey S. & Womach, Jasper
Partner: UNT Libraries Government Documents Department

The 2002 Farm Bill: Overview and Status

Description: This report discusses the provisions of the 1996 farm bill, which was due to expire in 2002 but was extended for an additional 6 years on May 13, 2002 by President Bush (P.L. 107-171). The new law is called the "Farm Security and Rural Investment Act (FSRIA) of 2002. The new law generally supersedes the previous omnibus farm bill, the Federal Agriculture Improvement and Reform (FAIR) Act of 1996 (P.L. 104-127). The new farm law has attracted widespread criticism both in the U.S. and abroad. This report discusses these criticisms as well as the defenses of the law's proponents.
Date: September 3, 2002
Creator: Becker, Geoffrey S. & Womach, Jasper
Partner: UNT Libraries Government Documents Department

2002 status report: Savings estimates for the ENERGY STAR(R) voluntary labeling program

Description: ENERGY STAR [registered trademark] is a voluntary labeling program designed to identify and promote energy-efficient products, buildings and practices. Operated jointly by the Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE), ENERGY STAR labels exist for more than thirty products, spanning office equipment, residential heating and cooling equipment, commercial and residential lighting, home electronics, and major appliances. This report presents savings estimates for a subset of ENERGY STAR program activities, focused primarily on labeled products. We present estimates of the energy, dollar and carbon savings achieved by the program in the year 2001, what we expect in 2002, and provide savings forecasts for two market penetration scenarios for the period 2002 to 2020. The target market penetration forecast represents our best estimate of future ENERGY STAR savings. It is based on realistic market penetration goals for each of the products. We also provide a forecast under the assumption of 100 percent market penetration; that is, we assume that all purchasers buy ENERGY STAR-compliant products instead of standard efficiency products throughout the analysis period.
Date: March 3, 2003
Creator: Webber, Carrie A.; Brown, Richard E.; McWhinney, Marla & Koomey, Jonathan
Partner: UNT Libraries Government Documents Department

2006 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

Description: The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act cleanup of National Priorities List waste sites at Hanford. One of the objectives of restoration is the revegetation of remediated waste sites to stabilize the soil and restore the land to native vegetation. The report documents the results of revegetation and mitigation monitoring conducted in 2006 and includes 11 revegetation/restoration projects, one revegetation/mitigation project, and 2 bat habitat mitigation projects.
Date: October 3, 2006
Creator: Johnson, A. L. & Gano, K. A.
Partner: UNT Libraries Government Documents Department

The 2008 Farm Bill: Major Provisions and Legislative Action

Description: The report discusses the 2008 farm bill (H.R. 2419), covering a wide range of programs including The Food, Conservation, and Energy Act of 2008, farm credit, agricultural conservation, research, rural development, and foreign and domestic food programs, among others.
Date: October 3, 2008
Creator: Johnson, Renée; Becker, Geoffrey S.; Capehart, Tom; Chite, Ralph M.; Cowan, Tadlock; Gorte, Ross W. et al.
Partner: UNT Libraries Government Documents Department

2010 Non-Proliferation Treaty (NPT) Review Conference: Key Issues and Implications

Description: The report includes a short summary of the provisions and goals of the Non-Proliferation Treaty (NPT) and a brief history of past review conferences. It also discusses the key issues that the participants are likely to address during the 2010 conference.
Date: May 3, 2010
Creator: Kerr, Paul K.; Nikitin, Mary Beth; Woolf, Amy F. & Medalia, Jonathan
Partner: UNT Libraries Government Documents Department

2016 Rio Games: Anti-Doping Testing

Description: This report discusses the the anti-doping testing program during the 2016 Summer Olympics. Responsibility for the rests with the International Olympic Committee (IOC). The testing period began July 24, 2016, when the Olympic village opened, and continues through August 21, 2016, the date of the closing ceremony.
Date: August 3, 2016
Creator: Halchin, L. E.
Partner: UNT Libraries Government Documents Department

2020 Census: Prioritized Information Technology Research and Testing Is Needed for Census Design Decisions

Description: A letter report issued by the Government Accountability Office with an abstract that begins "The Census Bureau (Bureau) has made progress in researching and testing information technology (IT) options for the 2020 Decennial Census, but several of the supporting projects lack schedules and plans, and it is uncertain whether they will be completed in time to inform the decision on the operational design for the 2020 census, planned for September 2015. Specifically, it has begun research on six IT-related projects, such as using the Internet for survey response and using employees' personal smartphones to collect census data. However, four of the projects lacked finalized schedules, and three lacked plans for gauging progress. Moreover, the two projects with completed schedules are not estimated to be completed until after the September 2015 design decision date (see figure)."
Date: April 3, 2014
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

21st Century Locomotive Technology: Quarterly Technical Status Report 15 DOE/AL68284-TSR15

Description: High pressure common rail (HPCR) fuel injection performance testing developed a notch-by-notch performance comparison between HPCR and the production fuel system. A multiple injection screening study at notch 8 was completed with the baseline HPCR fuel injector nozzle tip design. Began a study on performance effects of different nozzle tip geometries. The hybrid locomotive battery vendor performed component fabrication tests and began manufacture of a mockup battery to validate the vibration design performance.
Date: November 3, 2006
Creator: Salasoo, Lembit & Topinka, Jennifer
Partner: UNT Libraries Government Documents Department