Institutional and Financial Guide to Geothermal District Heating. Serial No. 2

Description: General planning considerations which affect nearly every community are reviewed, and alternative operating structures which are available to communities are reviewed, including local governments, nonprofit cooperatives, private enterprises, and joint ventures. The financing options available to publicly-owned and privately-owned district heating systems are then summarized. The geothermal production and distribution activities most appropriate to each type of operating structure are reviewed, … more
Date: March 1, 1982
Partner: UNT Libraries Government Documents Department
open access

Business strategy groups lessons learned

Description: Since FY 1977, 29 business strategy group (BSG) sessions are known to have been conducted. Four were in nuclear, 3 in resource applications, 9 in fossil energy, 10 in solar/geothermal, 1 in conservation, and 2 in EIA (systems operations and support services and programming services). DOE management needs to re-emphasize with the program mamangement the importance for the use of BSGs in the mission needs and advanced procurement plan stages of major acquisition. BSG briefings and report findings… more
Date: August 1, 1980
Partner: UNT Libraries Government Documents Department
open access

ERDA Geothermal Component Test Facility (GCTF), East Mesa, Imperial Valley, California. Test operations management plan

Description: Discussion of the operation of the Geothermal Component Test Facility (GCTF), established for testing heat extraction and energy conversion equipment and materials, is presented under the following section headings: purposes of the facility; operating policies: service, conflicts, safety and environmental, investigator activities, shops and equipment, and test certification; organization: chart; Lawrence Berkely Laboratory: organization, responsibilities, individual responsibilities, and fundin… more
Date: January 1, 1976
Partner: UNT Libraries Government Documents Department
open access

Management of government personal property in the hands of contractors. Handbook for contracting officers and staff

Description: This manual is divided into three parts. Part One applies to the management of Government personal property within the Department of Energy in general terms. Part Two describes the specifics of the application of personal property management techniques to On-Site Contractors. Part three applies to Off-Site Contractors. Part One introduces the field of property management. It discusses: the legal basis and requirements established by Federal Statutes and the parallel authorities and responsibili… more
Date: April 1, 1982
Partner: UNT Libraries Government Documents Department
open access

Department of Energy Audit Report Tracking System (DARTS). Quarterly Management Report as of December 31, 1979

Description: This report provides information on the status of corrective actions on audit recommendations contained in audits of DOE activities, programs, and contracts. It is based on data and information reported to the Controller by DOE Headquarters elements and field offices in accordance with draft DOE Order 2300, Audit Compliance and Follow-Up. The report covers an update of matters reviewed at the initial meeting of the DOE Audit Review Council, the basic provisions of the proposed final order on au… more
Date: January 1, 1979
Partner: UNT Libraries Government Documents Department
open access

Third annual report to Congress on the automotive technology development program

Description: The Automotive Propulsion Research and Development Act of 1978 focused on advancing the technology of automotive propulsion systems. In formulating the Act, Congress found that: (1) existing automobiles do not meet the Nation's long-term environmental and energy goals; (2) insufficient resources are being devoted to research and development (R and D) on advanced automobile propulsion systems; (3) with sufficient R and D, alternatives to existing systems could meet long-term goals at reasonable … more
Date: March 1, 1982
Partner: UNT Libraries Government Documents Department
open access

Department management of the Ross Aviation, Inc. , contract aircraft major spare parts inventory, Albuquerque, New Mexico

Description: The purpose of this audit was to determine whether the Department of Energy's (Department) management of its contract with Ross Aviation, Inc. (Ross) provided reasonable assurance that the inventory of aircraft major spare parts at Ross was economical and efficient. The audit disclosed that approximately $447,000 (acquisition and interest carrying costs) of low-use major spare parts was excessive. Internal control deficiencies which fostered the excessive inventory included: (1) Ross had set st… more
Date: July 26, 1991
Partner: UNT Libraries Government Documents Department
open access

Audit of the cost effectiveness of contracting for headquarters support services

Description: This report describes the finding and recommendations on the audit of contractor costs for support services at Department of Energy (DOE) Headquarters. The objective was to determine whether the Office of Management and Budget (OMB) Circular A-76 requirement for new and existing support services contracts was properly implemented. DOE spends about $229 million on support services annually. The audit found that, on average, the costs to perform the work in-house were 40 percent less than contrac… more
Date: August 1, 1991
Partner: UNT Libraries Government Documents Department
open access

Assessment of potential and existing problems concerning interface between electric utilities and cogenerators

Description: The potential and existing problems concerning the interface between US electric utilities and cogenerators are considered by region. Also considered are regulatory barriers, rates and contracts, economic feasibility, and impact on system planning. Finally, the impact of the National Energy Act on the marketability potential of cogeneration is reviewed. The three appendixes summarize the utility meetings on cogeneration held in Washington, DC, Los Angeles, and Chicago.
Date: March 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Investigation and evaluation of geopressured-geothermal wells. Summary of Gruy Federal's Well-of-Opportunity Program to January 31, 1980

Description: Scouting and monitoring techniques peculiar to geopressured-geothermal wells and legal problems are presented. The following are tabulated: priority wells actively monitored, industry contacts, and the summary of industry responses to well-or-opportunity solicitation. (MHR)
Date: March 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Geothermal Energy Contract List: Fiscal Year 1990

Description: The Geothermal Division of the US Department of Energy (DOE) is charged with the lead federal role in the research and development (R D) of technologies that will assist industry in economically exploiting the nation's vast geothermal resources. The Geothermal Energy R D Program represents a comprehensive, balanced approach to establishing all forms of geothermal energy as significant contributors to the nation's energy supply. The program is structured both to maintain momentum in the growth o… more
Date: October 1, 1991
Partner: UNT Libraries Government Documents Department
open access

Cost and schedule control systems criteria for contract performance measurement. Implementation guide. [Contains glossary]

Description: This document provides uniform guidance for implementation of the DOE Order 2250.1, Cost and Schedule Control Systems Criteria (CSCSC) for Contract Performance Measurement. Its purpose is to assist both DOE and contractor representatives in fulfilling their responsibilities for meeting CSCSC requirements. Compliance with the contractual requirements for work definition, cost and schedule control, and performance reporting should provide increased assurance that a contractor's progress is suffic… more
Date: May 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Industrial fuel gas demonstration plant program. Current working estimate. Phase III and III

Description: The United States Department of Energy (DOE) executed a contract with Memphis Light, Gas and Water Division (MLGW) which requires MLGW to perform process analysis, design, procurement, construction, testing, operation, and evaluation of a plant which will demonstrate the feasibility of converting high sulfur bituminous coal to industrial fuel gas with a heating value of 300 +- 30 Btu per standard cubic foot (SCF). The demonstration plant is based on the U-Gas process, and its product gas is to … more
Date: December 1, 1979
Partner: UNT Libraries Government Documents Department
open access

Activities of the Oil Implementation Task Force; Contracts for field projects and supporting research on enhanced oil recovery, July--September 1990

Description: The report contains a general introduction and background to DOE's revised National Energy Strategy Advanced Oil Recovery Program and activities of the Oil Implementation Task Force; a detailed synopsis of the symposium, including technical presentations, comments and suggestions; a section of technical information on deltaic reservoirs; and appendices containing a comprehensive listing of references keyed to general deltaic and geological aspects of reservoirs and those relevant to six selecte… more
Date: May 1, 1991
Creator: Tiedemann, H.A. (ed.) (USDOE Bartlesville Project Office, OK (USA))
Partner: UNT Libraries Government Documents Department
open access

Progress report 13 for April 1979-August 1979 and proceedings of the 13th project integration meeting

Description: This report describes progress made by the Low-Cost Solar Array Project during the period April through August 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting hel… more
Date: January 1, 1979
Partner: UNT Libraries Government Documents Department
open access

Demonstration of wind turbine. Final technical report at grant program

Description: Proposal F-602 is a demonstration of a commercially available wind-electric device - an Enertech Corp. Series 1800 model wind turbine. The demonstration site selected was the New Directions school campus, a public school facility, in Sarasota, Florida. During testing, an investigation of the wind power potential for the area was undertaken. In addition, negotiations with the Florida Power and Light Company for parallel operation of the wind system (utility interface), were initiated. An Operati… more
Date: June 1, 1982
Creator: Pendola, W. Jr.
Partner: UNT Libraries Government Documents Department
open access

Procurement orientation course. Handout materials for DOE project officers

Description: This material begins by discussing the two basic types of contracts used by DOE, firm fixed-price contracts and cost reimbursement contracts. It then takes up in turn the topics of noncompetitive justification and justifications for acceptance of unsolicited proposals, procurement leadtime, preparation of technical evaluation criteria and conduct of technical evaluations, contents of the procurement or assistance plan, and preparation of the statement of work. (RWR)
Date: unknown
Partner: UNT Libraries Government Documents Department
open access

DOE program guide for universities and other research groups. Part I. DOE Research and Development Programs; Part II. DOE Procurement and Assistance Policies/Procedures

Description: This guide addresses the DOE responsibility for fostering advanced research and development of all energy resources, both current and potential. It is intended to provide, in a single publication, all the fundamental information needed by an institution to develop a potential working relationship with DOE. Part I describes DOE research and development programs and facilities, and identifies areas of additional research needs and potential areas for new research opportunities. It also summarizes… more
Date: March 1, 1980
Partner: UNT Libraries Government Documents Department
open access

Procurement regulations handbook: source evaluation board

Description: This Handbook is published to provide a compilation of significant policies and procedures applicable to the source evaluation and selection process. It provides guidance to source selection officials, source evaluation boards (SEBs), and others who will participate in the preparation of requests for proposals, evaluation of proposals, preparation of SEB reports, presentations to selection officials, and selection of offerors. The SEB process is a process utilized by the DOE to evaluate proposa… more
Date: January 1, 1979
Partner: UNT Libraries Government Documents Department
open access

Bureau of Economic Geology. 1978 annual report

Description: Bureau research programs and projects are designed to address many of the State's major concerns in the areas of geologic, energy, mineral, land, and environmental resouces. Research programs incorporate geologic concepts that will build toward an understanding of a specific resource and its impact on human activities. In addition to resource assessments in uranium, lignite, and geopressured geothermal energy, the Bureau continued research into analysis of governmental policy related to energy.… more
Date: January 1, 1978
Partner: UNT Libraries Government Documents Department
open access

Wind energy contract list, fiscal year 1990

Description: The federal Wind Energy Program performs applied research in the sciences of wind turbine dynamics and the development of advanced components and systems. These efforts have resulted in major advances in the development and commercialization of wind technology as an alternative energy source. In the past, a summary was prepared each year to provide an overview of the government-funded activities within the federal Wind Energy Program. Tasks conducted in-house by participating national laborator… more
Date: October 1, 1991
Partner: UNT Libraries Government Documents Department
open access

S-cubed geothermal technology and experience

Description: Summaries of ten research projects are presented. They include: equations describing various geothermal systems, geohydrological environmental effects of geothermal power production, simulation of linear bench-scale experiments, simulation of fluid-rock interactions in a geothermal basin, geopressured geothermal reservoir simulator, user-oriented geothermal reservoir simulator, geothermal well test analyses, geothermal seismic exploration, high resolution seismic mapping of a geothermal reservo… more
Date: April 1, 1976
Partner: UNT Libraries Government Documents Department
open access

Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

Description: This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting he… more
Date: January 1, 1979
Partner: UNT Libraries Government Documents Department
open access

Cost and schedule control systems criteria for contract performance measurement: work breakdown structure guide

Description: This document provides guidance on development and use of the Work Breakdown Structure (WBS) technique. It describes the types of work breakdown structures, their preparation, and their effective use for organizing, planning, and controlling projects and contracts managed by the Department of Energy (DOE). The WBS technique is the preferred management tool for identifying and defining work. It provides an ordered framework for planning and controlling the work efforts to be performed in achievi… more
Date: October 1, 1981
Partner: UNT Libraries Government Documents Department