41 Matching Results

Search Results

Monthly report, November, 1966

Description: This report gives summaries for the reactor plant operations, fuel and target fabrication, technical activities, advanced concepts and planning, and irradiation services. A feature report is included which describes the following: (1) the safety and control rod systems of the production reactors; (2) the problems which have developed with them; and (3) the corrective rod channel renovation and rod modification work which has been accomplished.
Date: December 15, 1966
Partner: UNT Libraries Government Documents Department

SNAP 10A FS-3 reactor performance

Description: SNAP 10FS-3 was the first flight-qualified SNAP reactor system to be operated in a simulated space environment. Prestart-up qualification testing, automatic start-up, endurance period performance, extended operation test and reactor shutdown are described as they affected, or were affected by, overall reactor performance. Performance of the reactor control system and the diagnostic instrumentation is critically evaluted.
Date: August 15, 1966
Creator: Hawley, J. P. & Johnson, R. A.
Partner: UNT Libraries Government Documents Department