170 Matching Results

Search Results

Advanced search parameters have been applied.

Loads and Calculations of Army Airplanes

Description: By comparing airplanes of known strength that have resisted all the usual and even extreme air loads with those that under like conditions were found to be insufficiently strong, the researchers, aided by scientific investigations, developed standards which are satisfactory for the calculation of airplane structures. Given here are standards applicable to loads on wing trusses, load factors for use in stress analysis, load factors required in sand testing, loads on control surfaces, loads on wing ribs, loads on landing gear, and rigidity of materials.
Date: February 1921
Creator: Stelmachowski
Partner: UNT Libraries Government Documents Department

Advanced Pilot Training (T-X) Program: Background and Issues for Congress

Description: This report discusses the Air Force's planned procurement of 350 new Advanced Pilot Training (APT T-X) aircraft and 46 Ground Based Training Systems (GBTS) at a cost valued at roughly $1.5 billion for the Research, Design, Test, and Evaluation phase of the program and estimated at $18 billion in future procurement costs. The APT T-X acquisition strategy poses potential oversight issues for Congress, including the following: Is the number of planned aircraft purchases sufficient? Given the reported pilot shortage, should the procurement be accelerated? What effects do increased F-35A & KC-46 purchases, along with development of the new Long Range Strike Bomber, B-21, have on the USAF budget and the feasibility of an additional Major Defense Acquisition Program? These questions and the Air Force's FY 2017 appropriations requests' for the program are addressed in this report.
Date: May 31, 2017
Creator: Coral, Ceir
Partner: UNT Libraries Government Documents Department

The Disposal of Military Aircraft

Description: "The end of the war saw every belligerent with vast stocks of aircraft and aircraft supplies in all stages of usefulness, much of the material being absolutely new. The question of the best method of getting rid of this accumulation is one which has been agitating those responsible for its disposal for more than three years now, but no wholly satisfactory solution has yet been reached" (p. 1).
Date: September 1922
Creator: Warner, Edward P.
Partner: UNT Libraries Government Documents Department

V-22 Osprey Tilt-Rotor Aircraft

Description: The V-22 Osprey is a tilt-rotor aircraft, capable of vertical or short take off and landing, with forward flight like a conventional fixed-wing aircraft. The MV-22 is the Marine Corps' top aviation priority. Marine Corps leaders believe that the Osprey will provide them an unprecedented capability to quickly and decisively project power from well over the horizon. The V-22 program has been under development for over 25 years. Safety and maintenance concerns have arisen over this period. Supporters tout the V-22's potential operational capabilities relative to the helicopters it will replace. It will fly faster, farther, and with more payload than the currently used machinery. Detractors tend to emphasize the V-22's long development schedule, its three fatal accidents, and its high cost relative to the helicopters it will replace.
Date: August 23, 2006
Creator: Bolkcom, Christopher
Partner: UNT Libraries Government Documents Department

Airborne Intelligence, Surveillance and Reconnaissance (ISR): The U-2 Aircraft and Global Hawk UAV Programs

Description: Among airborne intelligence, surveillance, and reconaissance (ISR) platforms, the U-2 Dragon Lady and the RQ-4A Global Hawk are especially valuable. This report discusses how best to use existing and planned manned and unmanned ISR aircraft to most effectively satisfy the Department of Defense's (Dod) requirements for timely and accurate information on enemy forces.
Date: December 1, 2000
Creator: Best, Richard A., Jr. & Bolkcom, Christopher
Partner: UNT Libraries Government Documents Department

C-17 Cargo Aircraft Program

Description: The C-17 Globemaster III is a long-range cargo/transport aircraft operated by the U.S. Air Force since 1993. Congress approved development of the aircraft in the late 1970s, when it was recognized that the Air Force did not have enough airlift capability. In 1981, the McDonnell Douglas C-17 emerged as winner of a competition with Boeing and Lockheed to develop a next-generation aircraft to replace C-130s and C-141s.
Date: March 20, 2000
Creator: Bolkcom, Christopher
Partner: UNT Libraries Government Documents Department

Commercial Aircraft in War

Description: The difference between aircraft for commercial and wartime uses is delineated, but the interchangability between the two is also discussed. Airships in both roles are also presented.
Date: August 1922
Creator: Warner, Edward P.
Partner: UNT Libraries Government Documents Department

Potential F-22 Raptor Export to Japan

Description: This report discusses issues surrounding Japan's interest in purchasing the F-22A Raptor aircraft from the United States. Although the export of the plane is now prohibited by U.S. law, Congress has recently and may again consider repealing this ban.
Date: July 2, 2007
Creator: Bolkcom, Christopher & Chanlett-Avery, Emma
Partner: UNT Libraries Government Documents Department

Tactical Aircraft Modernization: Issues for Congress

Description: This report provides an overview discussion on the modernization of U.S. military tactical aircraft, meaning fighter aircraft, strike-fighters, and attack planes. This CRS report discusses and presents FY2010 legislative activity on issues relating to U.S. tactical aircraft in general. For several years now, a central issue relating to tactical aircraft in general has been the overall affordability of the Department of Defense's (DOD's) plans for modernizing the tactical aircraft force. A second key issue concerns the future of the U.S. industrial base for designing and manufacturing tactical aircraft.
Date: July 9, 2009
Creator: O'Rourke, Ronald
Partner: UNT Libraries Government Documents Department

F-35 Joint Strike Fighter (JSF) Program: Background and Issues for Congress

Description: The F-35 Joint Strike Fighter (JSF), also called the Lighting II, is a new strike fighter being procured in different versions by the Air Force, Marine Corps, and Navy. The F-35 program is the Department of Defense's (DOD's) largest weapon procurement program in terms of total estimated acquisition cost. The issues for Congress for FY2010 are whether to approve, reject, or modify the administration's funding request for the F-35 program, and whether to approve or reject the administration's proposal to terminate the alternate engine program. Congress' decisions on these matters will affect DOD capabilities and funding requirements and the tactical aircraft manufacturing industrial base.
Date: June 18, 2009
Creator: O'Rourke, Ronald
Partner: UNT Libraries Government Documents Department

Navy F/A-18E/F Super Hornet and EA-18G Growler Aircraft: Background and Issues for Congress

Description: The F/A-18E/F Super Hornet is the Navy's highest priority aviation modernization program. The decision to undertake F/A-18E/F Super Hornet program was made during a period of great turbulence in Navy aviation modernization. During this time frame the Navy struggled to identify and implement the best way to modernize its aging fleet of F-14 fighters and A-6E attack aircraft. The Department of Defense is currently facing a shortage of radar and communications jamming capability. The Super Hornet has been approved for international export, but no sales have been made as of June 2006. Key issues surrounding the program relate to the total number of Super Hornets to be procured.
Date: June 8, 2006
Creator: Bolkcom, Christopher
Partner: UNT Libraries Government Documents Department

Military Airlift: C-17 Program Background

Description: The C-17 Globemaster III is a long-range cargo aircraft operated by the U.S. Air Force since 1993. To date, Congress has funded 190 C-17s for the Air Force. The C-17 program remains a key issue as Congress evaluates the needs of DOD's strategic airlift force. This paper provides program background for the C-17. For more detailed analysis of current issues regarding the C-17 acquisition, see CRS Report RL34264, Strategic Airlift Modernization: Analysis of C-5 Modernization and C-17 Acquisition Issues.
Date: October 22, 2008
Creator: Bolkcom, Christopher & Knight, William
Partner: UNT Libraries Government Documents Department

Military Aircraft: The Joint Cargo Aircraft Program

Description: Joint Cargo Aircraft (JCA) is a joint acquisition program between the Army and Air Force intended to procure a commercial off-the-shelf aircraft capable of meeting Army and Air Force requirements for intra-theater airlift. The C-27J Spartan, built by L-3 Communications, was awarded the JCA contract in 2007. This is an update of a report by William Knight and will be updated as conditions warrant.
Date: October 10, 2008
Creator: Hess, Allan
Partner: UNT Libraries Government Documents Department