Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of April 17, 2007

Description: Testimony issued by the Government Accountability Office with an abstract that begins "The purpose of this testimony is to assist the Committees in monitoring progress on the Capitol Visitor Center (CVC) project. This testimony will focus on (1) the Architect of the Capitol's (AOC) construction progress since the last CVC hearing on March 13, 2007; and (2) the project's expected cost at completion and funding status. GAO's remarks are based on our review of schedules and financial reports for the CVC project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; observations on the progress of work at the CVC construction site; and discussions with the CVC team (AOC and its major CVC contractors), AOC's Chief Fire Marshal, and representatives from the U.S. Capitol Police."
Date: April 24, 2007
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of September 25, 2007

Description: Testimony issued by the Government Accountability Office with an abstract that begins "Since the July 31, 2007, Capitol Visitor Center (CVC) hearing, the project's construction has progressed, and Architect of the Capitol (AOC) is now anticipating a November 2008, opening date. In addition, AOC and the sequence 2 contractor have signed a contract modification that extends the date for completing the majority of the sequence 2 work from September 15, 2006 to November 15, 2007. However, because delays have occurred on a number of near-critical paths, and risks to the project's schedule remain, we agree with the November 2008 opening date. AOC has increased its estimate of the cost to complete the CVC project's construction to about $621 million to cover the costs associated with extending the sequence 2 schedule and to provide for delays, change orders, and remaining uncertainties. We believe this estimate is reasonable, provided there are no unusual delays. To date, about $556.2 million has been approved for CVC construction, and AOC has $18.6 million more that it has not yet received approval to obligate. Of this amount, AOC plans to use about $6 million for construction and the remainder for operations. For fiscal year 2008, AOC has requested $20 million for CVC construction and believes that it may need another $39 million."
Date: September 25, 2007
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Current Status of Schedule and Estimated Cost

Description: Testimony issued by the General Accounting Office with an abstract that begins "GAO has been providing ongoing assistance to the Capitol Preservation Commission and the Senate and House Appropriations Committees in their monitoring and oversight of the Capitol Visitor Center construction project. Given the current decisions facing the Congress, this testimony covers (1) management of the project, (2) the estimated cost for the project, (3) the status of the project's schedule, and (4) actions that Congress and the AOC should consider taking to address funding gaps and other current project issues and risks."
Date: July 15, 2003
Creator: United States. General Accounting Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost As of June 28, 2006

Description: Testimony issued by the Government Accountability Office with an abstract that begins "We are pleased to be here today to assist Congressin monitoring progress on the Capitol Visitor Center (CVC) project. Our remarks will focus on the Architect of the Capitol's (AOC) progress in achieving selected project milestones and in managing the project schedule since Congress's May 24, 2006, hearing on the project. As part of this discussion, we will address a number of key challenges and risks that continue to face the project, as well as actions AOC has taken or plans to take to address these risks. In addition, we will discuss the status of the project's costs and funding. Our remarks today are based on our review of schedules and financial reports for the CVC project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC construction site; and our discussions with the CVC team (AOC and its major CVC contractors), AOC's Chief Fire Marshal, and representatives from the U.S. Capitol Police. We also reviewed AOC's construction management contractor's periodic schedule assessments and daily reports on the progress of interior wall and floor stonework."
Date: June 28, 2006
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of March 13, 2007

Description: Testimony issued by the Government Accountability Office with an abstract that begins "We appreciate the opportunity to assist the Subcommittee in monitoring progress on the Capitol Visitor Center (CVC) project. GAO's remarks will focus on (1) the Architect of the Capitol's (AOC) construction progress since the last CVC hearing on February 16, 2007; and (2) the project's expected cost at completion and funding status. Today's remarks are based on our review of schedules and financial reports for the CVC project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC construction site; and our discussions with the CVC team (AOC and its major CVC contractors), AOC's Chief Fire Marshal, and representatives from the U.S. Capitol Police. We also reviewed AOC's construction management contractor's periodic schedule assessments, potential change order log, and weekly reports on the progress of interior wall and floor stone installation. In addition, we reviewed the contract modifications made to date. At the last CVC hearing, we reported that our assessment of the project's schedule and expected cost at completion was still somewhat constrained because the CVC team was analyzing the impact on the project's schedule and cost of recently identified changes required for certain components of the fire protection and security systems. The impact of these changes on the project is still not fully known. Therefore, we could not thoroughly assess the project's schedule or estimated cost at completion and are basing our views on the information available as of March 6, 2007, recognizing our views could change as more information on the impact of these changes becomes available."
Date: March 13, 2007
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of February 7, 2008

Description: Testimony issued by the Government Accountability Office with an abstract that begins "Today's remarks are based on our review of schedules and financial reports for the CVC project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC construction site; and our discussions with the CVC team (AOC and its major CVC contractors), AOC's Chief Fire Marshal, and representatives from the U.S. Capitol Police. We also reviewed AOC's construction management contractor's periodic schedule assessments, potential change order log, and weekly reports on construction progress. In addition, we reviewed the contract modifications made to date."
Date: February 7, 2008
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of April 15, 2008

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony is based on GAO's review of schedules and financial reports for the Capitol Visitor Center (CVC) project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; GAO's observations on the progress of work at the CVC construction site; and GAO's discussions with the CVC team (Architect of the Capitol (AOC) and its major CVC contractors) and AOC's Chief Fire Marshal. GAO also reviewed AOC's construction management contractor's periodic schedule assessments, proposed change order log, and weekly reports on construction progress. In addition, GAO reviewed the contract modifications made to date."
Date: April 15, 2008
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Status of Schedule, Fire Protection, Cost, and Related Issues

Description: Testimony issued by the Government Accountability Office with an abstract that begins "GAO testified before Congress on the progress on the Capitol Visitor Center (CVC) project. Our remarks will focus on (1) the Architect of the Capitol's (AOC) progress in managing the project's schedule since Congress's September 15 hearing on the project, (2) issues associated with the CVC's fire protection system, and (3) the project's costs and funding. Our ability to fully address these issues is limited by two important factors. First, AOC's sequence 2 construction contractor's--Manhattan Construction Company--September 2005 schedule reflects a number of significant changes, and AOC has not yet had the opportunity to fully evaluate these changes. Second, neither AOC nor its construction management contractor--Gilbane Building Company--has completed the evaluation of elements of the project schedule that we recommended during Congress's September 15 hearing. Thus, while we will discuss the schedule's status, we will not be able to provide specific estimated completion dates until AOC and its construction management contractor complete their assessments and we have the opportunity to evaluate them. Similarly, while we will discuss the status of the project's costs and funding, we will wait until the project schedule is fully reviewed and stabilized and we have had an opportunity to evaluate AOC's consultant's, McDonough Bolyard Peck (MBP), cost-estimation work before we comprehensively update our November 2004 estimate of the cost to complete the project."
Date: October 18, 2005
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of March 12, 2008

Description: Testimony issued by the Government Accountability Office with an abstract that begins "Today's remarks are based on our review of schedules and financial reports for the Capitol Visitor Center (CVC) project and related records maintained by Architect of the Capitol (AOC) and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC construction site; and our discussions with the CVC team (AOC and its major CVC contractors), AOC's Chief Fire Marshal, and representatives from the U.S. Capitol Police. We also reviewed AOC's construction management contractor's periodic schedule assessments, proposed change order log, and weekly reports on construction progress. In addition, we reviewed the contract modifications made to date."
Date: March 12, 2008
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Effective Schedule Management and Updated Cost Information Are Needed

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony discusses the Architect of the Capitol's (AOC) progress in achieving selected project milestones and in managing the project's schedule since Congress's May 17 hearing on the project. We will also discuss the project's costs and funding, including the potential impact of schedule-related issues on the project's costs. Our observations today are based on our review of schedules and financial reports for the CVC project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC construction site; and our discussions with CVC project staff, including AOC, its construction management contractor, and representatives of an AOC schedule consultant, McDonough Bolyard Peck (MBP). We did not perform an audit; rather we performed our work to assist Congress in conducting its oversight activities."
Date: June 14, 2005
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Priority Attention Needed to Manage Schedules and Contracts

Description: Testimony issued by the Government Accountability Office with an abstract that begins "Approved in the late 1990s, the Capitol Visitor Center (CVC) is the largest project on the Capitol grounds in over 140 years. Its purposes are to provide greater security for all persons working in or visiting the U.S. Capitol and to enhance the educational experience of visitors who have come to learn about Congress and the Capitol building. When completed, this three-story, underground facility, located on the east side of the Capitol, is designed to be a seamless addition to the Capitol complex that does not detract from the appearance of the Capitol or its historic landscaping. According to current plans, it will include theaters, an auditorium, exhibit space, a service tunnel for truck loading and deliveries, storage, and additional space for use by the House and Senate. This testimony discusses the Architect of the Capitol's (AOC) management of the project's schedules and contracts; the project's estimated costs, including risks and uncertainties; worker safety issues; and AOC's monthly reporting to Congress on the project. This testimony also discusses recommendations that we have made in previous testimony and briefings and the actions AOC has taken in response."
Date: May 17, 2005
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Schedule and Cost

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony discusses the progress on the Capitol Visitor Center (CVC) project. Specifically, this testimony discusses (1) the status of the project schedule since Congress's October 18, 2005, hearing on the project, (2) the project's costs and funding, and (3) worker safety issues. We will discuss the progress made and problems encountered in completing scheduled construction work and in continuing to develop the project schedule, as we indicated during Congress's October 18 hearing; however, we will not be able to estimate specific completion dates until the project schedule is stable and the Architect of the Capitol (AOC) and its construction management contractor--Gilbane Building Company--have completed their assessments of the schedule and we have had an opportunity to evaluate them. Also, we will update the information we previously provided on the project's costs and funding, using readily available data, but we will wait until the project schedule is stable and has been fully reviewed before we comprehensively update our November 2004 estimate of the cost to complete the project and update the provision in our estimate for risks and uncertainties facing the project."
Date: November 16, 2005
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of October 31, 2007

Description: Testimony issued by the Government Accountability Office with an abstract that begins "Today's testimony will focus on (1) the Architect of the Capitol's (AOC) construction progress since the last CVC hearing on September 25, 2007, and (2) the project's expected cost at completion and funding status. Today's remarks are based on our review of schedules and financial reports for the CVC project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC construction site; and our discussions with the CVC team (AOC and its major CVC contractors), AOC's Chief Fire Marshal, and representatives from the U.S. Capitol Police. We also reviewed AOC's construction management contractor's periodic schedule assessments, potential change order log, and weekly reports on construction progress. In addition, we reviewed the contract modifications made to date."
Date: November 14, 2007
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of February 16, 2007

Description: Testimony issued by the Government Accountability Office with an abstract that begins "At the last Capitol Visitor Center (CVC) hearing, GAO reported that our assessment of the project's schedule and expected cost at completion was somewhat constrained because the CVC team was still analyzing the impact on the project's schedule and cost of recently identified changes required for certain components of the fire protection and security systems. The impact of these changes on the project is not yet fully known. Therefore, GAO could not thoroughly assess the project's schedule or estimated cost at completion and are basing our views on the information available as of February 5, 2007, including the Architect Of the Capitol's (AOC) December 2006 schedule. To assist the Subcommittee on the Legislative Branch, House Committee on Appropriations in monitoring progress on the CVC project, GAO's remarks will focus on (1) the AOC construction progress since the last CVC hearing on November 15, 2006; and (2) the project's expected cost at completion and status of funding."
Date: February 16, 2007
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of July 31, 2007

Description: Testimony issued by the Government Accountability Office with an abstract that begins "Since the June 27, 2007, Capitol Visitor Center (CVC) hearing, the project's construction has progressed, and according to the latest schedule, Architect of the Capitol (AOC) is still projecting a June 27, 2008, completion date and a September 22, 2008 opening date. Work has advanced on the project's heating, ventilation, and air-conditioning (HVAC) system, interior wall stone and ceiling installation, and other interior and exterior construction work. However, some delays have occurred in activities on the project's critical path (i.e., the work on the fire alarm system) and on most of its near-critical paths, and further delays are possible. AOC was able to mitigate the delay in the project's critical path by reducing the time available for future fire alarm testing. This action may not produce the desired results, though, given the complexity of the requirements for fire alarm testing. Delays in near-critical activities such as the ceiling close-ins and the House and Senate expansion spaces have reduced the time reserved for contingencies along those near-critical paths, but have not yet affected the critical path. Furthermore, a number of risks to the project's schedule remain. These include potential problems in completing the installation, integration, operation, and testing of the fire alarm, security, and HVAC systems. Recently, for example, AOC's Chief Fire Marshal completed his initial plan for final acceptance testing of the fire alarm systems and found additional complexity in testing requirements that has the potential to delay the project for a number of months. In addition, the Fire Marshal has added testing requirements for all of the CVC's smoke detectors, which could further delay the project's completion. Given these and other risks to the project's schedule, we believe that a September 2008 opening date is unlikely. In ...
Date: July 31, 2007
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Results of Risk-based Analysis of Schedule and Cost

Description: Testimony issued by the Government Accountability Office with an abstract that begins "GAO testified before the Senate Subcommittee on the Legislative Branch, Committee on Appropriations to provide the results of a risk-based analysis of schedule and cost for the Capitol Visitor Center (CVC). Our remarks focused on (1) our assessment of the risks associated with the Architect of the Capitol's (AOC) December 2005 schedule, and our estimate of a time frame for opening the project to the public; and (2) the project's costs and funding, including the potential impact of scheduling issues that have arisen since the Subcommittee's November 16, 2005, hearing on the CVC project's schedule and cost."
Date: February 15, 2006
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Schedule Delays Continue; Reassessment Underway

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony discusses progress on the Capitol Visitor Center (CVC) project. Our remarks will focus on (1) the Architect of the Capitol's (AOC) progress in managing the project's schedule since the Subcommittee on the Legislative Branch, Senate Committee on Appropriations' July 14 hearing on the project; (2) our estimate of a general time frame for completing the base project's construction and the preliminary results of our assessment of the risks associated with AOC's July 2005 schedule for the base project; and (3) the project's costs and funding, including the potential impact of scheduling issues on cost. However, we will not, as originally planned, provide specific estimated completion dates because AOC's contractors revised the schedule in August to reflect recent delays, but AOC has not yet evaluated the revised schedule. AOC believes that the time added to the schedule by its contractors is unreasonable. Until AOC completes its evaluation and we assess it, any estimates of specific completion dates are, in our view, tentative and preliminary. Similarly, we will wait until the schedule is stabilized to update our November 2004 estimate of the cost to complete the project. Currently, AOC and its consultant, McDonough Bolyard Peck (MBP), are still developing their cost-to-complete estimates."
Date: September 15, 2005
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of June 27, 2007

Description: Testimony issued by the Government Accountability Office with an abstract that begins "The purpose of this testimony is to assist the Committees in monitoring progress on the Capitol Visitor Center (CVC) project. This testimony will focus on (1) the Architect of the Capitol's (AOC) construction progress since the last CVC hearing on April 24, 2007; and (2) the project's expected cost at completion and funding status. GAO's remarks are based on our review of schedules and financial reports for the CVC project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC construction site; and our discussions with the CVC team (AOC and its major CVC contractors), AOC's Chief Fire Marshal, and representatives from the U.S. Capitol Police. We also reviewed AOC's construction management contractor's periodic schedule assessments, potential change order log, and weekly reports on the progress of interior wall and floor stonework. In addition, we reviewed the contract modifications made to date."
Date: June 27, 2007
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of September 24, 2008

Description: Testimony issued by the Government Accountability Office with an abstract that begins "The purpose of this testimony is to assist the Subcommittee in monitoring progress on the Capitol Visitor Center (CVC) project. This testimony will focus on (1) the Architect of the Capitol's (AOC) construction progress since the last CVC hearing on July 8, 2008, and (2) the project's expected cost at completion and funding status."
Date: September 24, 2008
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of April 27, 2006

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony focuses on the Architect of the Capitol's progress in achieving selected project milestones and in managing the project's schedule since Congress's March 15, 2006, hearing on the project. As part of this discussion, we will address a number of key challenges and risks that continue to face the project, as well as actions AOC has taken or plans to take to address these risks. In addition, we will discuss the status of the project's costs and funding."
Date: April 27, 2006
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of June 27, 2008

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony is based on our review of schedules and financial reports for the CVC project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC construction site; and our discussions with the CVC team (AOC and its major CVC contractors) and AOC's Chief Fire Marshal. We also reviewed AOC's construction management contractor's periodic schedule assessments."
Date: July 8, 2008
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Costs

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony discusses the Architect of the Capitol's (AOC) progress in achieving selected project milestones and in managing the Capitol Visitor Center (CVC) project's schedule since Congress's June 14 hearing on the project. We will also discuss the project's costs and funding, including the potential cost impact of schedule-related issues. Our observations today are based on our review of schedules and financial reports for the CVC project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC construction site; and our discussions with AOC's Chief Fire Marshal and CVC project staff, including AOC, its major CVC contractors, and representatives of an AOC schedule consultant, McDonough Bolyard Peck (MBP). We did not perform an audit; rather, we performed our work to assist Congress in conducting its oversight activities."
Date: July 14, 2005
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Construction Expected to Be Completed within Current Budget Estimate

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony focuses on (1) the Architect of the Capitol's (AOC) construction progress since the last Capitol Visitor Center (CVC) hearing on September 24, 2008, and (2) the project's expected cost at completion and funding status. Today's remarks are based on our review of schedules and financial reports for the CVC project and related records maintained by AOC and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC; and our discussions with AOC."
Date: July 23, 2009
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of September 21, 2006

Description: Testimony issued by the Government Accountability Office with an abstract that begins "This testimony's aim is to assist the Senate Committee on Appropriations, Subcommittee on the Legislative Branch in monitoring progress on the Capitol Visitor Center (CVC) project. Our remarks will focus on (1) the Architect of the Capitol's (AOC) progress in achieving selected project milestones and in managing the project's schedule since the Subcommittee's August 2, 2006, hearing on the project; (2) our assessment of the project's currently scheduled completion date; and (3) an update on the project's expected cost at completion and funding situation. As part of this discussion, we will address a number of key challenges and risks that continue to face the project, as well as actions we believe that AOC will need to take to meet its currently scheduled completion date. This testimony is based on our review of schedules and financial reports for the CVC project and related records maintained by the AOC and its construction management contractor, Gilbane Building Company; our observations on the progress of work at the CVC construction site; and our discussions with the CVC team (AOC and its major CVC contractors), AOC's Chief Fire Marshal, and representatives from the U.S. Capitol Police. We also reviewed AOC's construction management contractor's periodic schedule assessments, potential change order log, and daily reports on the progress of interior wall and floor stonework. We retained a mechanical consulting engineering firm (Kincaid/Bryant) to help us assess the CVC team's progress in completing the project's heating, ventilation, and air-conditioning (HVAC) system. In addition, we reviewed the contract modifications made to date and the estimates of cost increases provided by AOC and its construction management contractor, including their estimates of the costs related to delays, and their preliminary cost estimates for recent changes to the CVC's fire ...
Date: September 21, 2006
Creator: United States. Government Accountability Office.
Partner: UNT Libraries Government Documents Department