569 Matching Results

Search Results

Advanced search parameters have been applied.

Report of Flood, Oil Sheen, and fish Kill Incidents on East Fork Poplar Creek at the Oak Ridge Y-12 Plant

Description: Water quality and plant opemtion irriiormation provided by the Y-12 Plant strongly suggest that a dechlorinating agent, applied to the raw water released below the North-South Pipes was responsible for the toxicity resulting in the fish kill of July 24. Dissolved oxygen (DO) measurements in upper EFPC indicai e that low oxygen levels (3-5 ppm) occurred for a period of up to 30 min. This slug of low DO water traveling down EFPC to the lake could easily explain the massive fish kill and the resulting observations. Dissolved oxygen levels of 5.2 ppm or lower are documented as causing problems for warmwater fish species (Heath 1995). The presence of other stressors, including a range of petrochemicals, tends to lower resistance to low oxygen conditions. Given the sequence of events in upper EFPC in the few days prior to July 24, where extremely high flows were followed by inputs of a wide range of low concentrations of oils, the sensitivity to low DO conditions might be heightened. The possible toxic impact of ::he oils and other contaminants reaching EFPC as a result of the heavy rainfidl on July 22 doesn't appear significant enough to be the sole cause of the kill on July 24. Even during the height of the kill, a large school of fish remained immediately downstream of the North-South Pipes. If the toxicity of waters flowing through this outlet were the primary cause of the kill, then it would be expected that this school of fish would not have been present immediately below the pipes. Any impact of waters entering from other sources, such as pumping of basements WOUIC1 have produced a staggered pattern of mortality, with fishing dying in different localities at different times and rates. Further, it would be expected that the morta.lhy observed would have ...
Date: September 1, 1997
Creator: Skaggs, B.E.
Partner: UNT Libraries Government Documents Department

Independent review of Oak Ridge HCTW test program and development of seismic evaluation criteria

Description: Many of the existing buildings at the Oak Ridge Y-12 Plant are steel frame construction with unreinforced hollow clay tile infill walls (HCTW). The HCTW infill provides some lateral seismic resistance to the design/evaluation basis earthquake; however acceptance criteria for this construction must be developed. The basis for the development of seismic criteria is the Oak Ridge HCTW testing and analysis program and the target performance goals of DOE 5480.28 and DOE-STD-1020-94. This report documents and independent review of the testing and analysis program and development of recommended acceptance criteria for Oak Ridge HCTW construction. The HCTW test program included ``macro`` wall in-plane and out-of-plane tests, full-scale wall in-plane and out-of-plane tests, in-situ out-of-plane test, shake table tests, and masonry component tests.
Date: May 1, 1995
Partner: UNT Libraries Government Documents Department

Fiscal Year 1993 Well Plugging and Abandonment Program Summary Report Y-12 Plant, Oak Ridge, Tennessee

Description: This report is a synopsis of the progress of the well plugging and abandonment program at the Y-12 Plant, Oak Ridge, Tennessee, from October 1993 through August 1994. A total of 57 wells and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned in accordance with the Monitoring Well Plugging and Abandonment Plan for the U.S. Department of Energy, Y-12 Plant, Oak Ridge, Tennessee.
Date: September 1, 1994
Partner: UNT Libraries Government Documents Department

Resource Conservation and Recovery Act (RCRA) Closure Plan Summary for Interim reasctive Waste Treatment Area (IRWTA)

Description: This closure plan has been prepared for the interim Reactive Waste Treatment Area (IRWT'A) located at the Y-12 Pkmt in oak Ridge, Tennessee (Environmental Protection Agency [EPA] Identification TN 389-009-0001). The actions required to achieve closure of the IRWTA are outlined in this plan, which is being submitted in accordance with Tennessee Ruie 1200- 1-1 1-.0S(7) and Title 40, Code of Federal Regulations (CFR), Part 265, Subpart G. The IRWTA was used to treat waste sodium and potassium (NaK) that are regulated by the Resource Conservation and Recovery Act (RCRA). The location of the IRWT'A is shown in Figures 1 and 2, and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.
Date: July 1, 1997
Creator: Collins, E.T.
Partner: UNT Libraries Government Documents Department

Results of calendar year 1995 Well Inspection and Maintenance Program Y-12 Plant, Oak Ridge, Tennessee

Description: This document is a compendium of results of the 1995 Monitor Well Inspection and Maintenance Program at the US Department of Energy`s Oak Ridge Y-12 Plant. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the effective longevity of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant from August through December 1995.
Date: July 1, 1996
Creator: McMaster, B.W.
Partner: UNT Libraries Government Documents Department

Emergency Planning and Community Right-To-Know Act, Section 311

Description: The following information reflects changes in the lists of hazardous chemicals present at this facility in amounts equal to or greater than 10,000 pounds and extremely hazardous substances present in amounts equal to or greater than 500 pounds or its Threshold Planning Quantity, whichever was lowest. These lists represent the following: list of materials last reported in February 1995; materials to be deleted from list; materials to be added to list; and revised list of materials. The revised list of materials is a composite of the Y-12 Plant Emergency Planing and Community Right-to-Know Act Section 312 report prepared and submitted for calendar year 1995.
Date: March 1, 1996
Creator: Evans, R.A. & Martin, K.J.
Partner: UNT Libraries Government Documents Department

Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee

Description: This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance.
Date: September 1, 1995
Partner: UNT Libraries Government Documents Department

Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program (BMAP) Plan

Description: The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y- 12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional toxicity testing if initial results indicate low survival or reproduction) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is observed). By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.
Date: October 1, 1998
Creator: Adams, S. M.; Brandt, C. C.; Christensen, S. W.; Cicerone, D. S.; Greeley, M. S., Jr.; Hill, W. R. et al.
Partner: UNT Libraries Government Documents Department

Biological Monitoring Program for East Fork Poplar Creek

Description: In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Y-12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek; EFPC), in particular, the growth and propagation of aquatic life (Lear et al. 1989). A second objective of the BMAP is to document the ecological effects resulting from the implementation of a water pollution control program designed to eliminate direct discharges of wastewaters to EFPC and to minimize the inadvertent release of pollutants to the environment. Because of the complex nature of the discharges to EFPC and the temporal and spatial variability in the composition of the discharges, a comprehensive, integrated approach to biological monitoring was developed. A new permit was issued to the Y-12 Plant on April 28, 1995 and became effective on July 1, 1995. Biological monitoring continues to be required under the new permit. The BMAP consists of four major tasks that reflect different but complementary approaches to evaluating the effects of the Y-12 Plant discharges on the aquatic integrity of EFPC. These tasks are (1) toxicity monitoring, (2) biological indicator studies, (3) bioaccumulation studies, and (4) ecological surveys of the periphyton, benthic macroinvertebrate, and fish communities.
Date: September 9, 1998
Creator: Adams, S. M.; Beaty, T. W.; Brandt, C. C.; Christensen, S. W. & Cicerone, D. S.
Partner: UNT Libraries Government Documents Department

Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

Description: This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document.
Date: November 1993
Partner: UNT Libraries Government Documents Department

Monitoring Stresses on the Pv-4 Isostatic Press From 1960 to 1997

Description: The PV-4 isostatic press has a very large working volume (98 ft{sup 3}) that was designed for routine operations at internal pressures up to 30 ksi and is, therefore, a unique and valuable component of the U.S. DOE Y-12 manufacturing capability. More than 13,000 pressing operations have been conducted since initiation of operations in September 1960. The pressure vessel portion consists of three concentric cylinders of high-strength steel with the outer two cylinders shrink-fitted on the imermost cylinder to minimize tensile stresses on the inner surface of the vessel. The third, outermost cylinder consists of two sections; each section is one-half the length of the pressure vessel. The vessel is contained within a large frame which is made of T-1 steel. In 1982 and 1983 precision strain gauges were mounted at selected locations on the frame and the outer surface of the pressure vessel to monitor the operating stresses. Where possible, locations of the gauges mounted in 1982 and 1983 were at or near the same locations as the strain gauges mounted in 1960 to monitor stresses on the frame and vessel during preoperational testing and design verification of the press. This report presents the information obtained with these strain gauges for tests conducted in September 1960 prior to any operation of the press and for the period July 1983 to August 1997. On September 8 and 9, 1960, Sturm & Krouse used 120 strain gauges on the frame and 20 strain gauges on the outer surface of the pressure vessel to measure strains in PV-4 as a function of operating pressure from O to 33 ksi. Although the design maximum operating pressure of the press was 30 ksi, to provide a safety factor for operations at 30 ksi and to assure totally elastic behavior of the steel components of ...
Date: December 1, 1998
Creator: Adamski, R. E.; Frazier, J. L.; Horak, J. A.; Howard, D. C. & Kelley, D. K.
Partner: UNT Libraries Government Documents Department

Surveillance and maintenance report on decontamination and decommissioning and remedial action activities at the Oak Ridge Y-12 plant, Oak Ridge, Tennessee. Fiscal year 1996

Description: The Oak Ridge Y-12 Plant Decontamination and Decommissioning (D&D) and Remedial Action (RA) programs are part of the Environmental Restoration (ER) Division and are funded by the Office of Environmental Management (EM-40). Building 9201-4 (known as Alpha-4), three sites located within Building 9201-3 (the Oil Storage Tank, the Molten Salt Reactor Experiment Fuel Handling Facility, and the Coolant Salt Technology Facility), and Building 9419-1 (the Decontamination Facility) are currently the facilities at the Y-12 Plant included in the D&D program. The RA program provides surveillance and maintenance (S&M) and program management of ER sites at the Y-12 Plant, including selected sites listed in Appendix C of the Federal Facilities Agreement (FFA), sites listed in the Hazardous and Solid Waste Amendment (HSWA) permit Solid Waste Management Unit (SWM-U) list, and sites currently closed or undergoing post-closure activities under the Resource Conservation and Recovery Act of 1976 (RCRA) or the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This report communicates the status of the program plans and specific S&M activities for the D&D and RA programs.
Date: December 1996
Creator: King, H. L.; Sollenberger, M. L.; Sparkman, D. E.; Reynolds, R. M. & Wayland, G.S.
Partner: UNT Libraries Government Documents Department

Executive Order 12941 Implementation at the Oak Ridge National Laboratory

Description: Congress enacted the Earthquake Hazards Reduction Act of 1977 (Public Law 95-124, as amended) to reduce risks to life and property from future earthquakes in the US. To implement the provisions of the Act, the Interagency Committee on Seismic Safety in Construction (ICSSC) was chartered. Approximately thirty Federal agencies, including the Department of Energy (DOE), participate in the ICSSC. The ICSSC is chaired by the National Institute of Standards (NIST) which also provides the technical secretariat. EO 12941, Seismic Safety of Existing Federally Owned or Leased Buildings, were prepared and issued by the ICSSC to reduce the vulnerability to buildings owned or leased by agencies or departments for Federal use. This report documents the implementation of EO 12941 at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. ORNL is managed and operated by Lockheed Martin Energy Research, Inc. (LMER) for the DOE-Oak Ridge Operations Office (DOE-ORO). The ORNL building inventory includes buildings that are physically located at ORNL, East Tennessee Technology Park (ETTP), and the Oak Ridge Y-12 Plant. This report addresses buildings physically located at the ORNL plant site. ORNL buildings located at ETTP and Y-12 plant sites will be included in the EO 12941 implementation reports for those sites. The scope of this effort included revising the building inventory for ORNL that was prepared prior to the development of the DOE management plan, evaluating owned buildings not exempt from the requirements of EO 12941, estimating the costs associated with the rehabilitation of vulnerable non-exempt buildings, and preparing this report in the TR-17 prescribed format (CNPE 1996). These activities were performed in accordance with the DOE management plan and as applicable, Phase I - Screening Guidelines To Determine The Structures Exempt From Executive Order 12941 (CNPE 1995).
Date: August 1, 1998
Creator: Hunt, R.J.; Kroon, R.J. & Shaffer, K.E.
Partner: UNT Libraries Government Documents Department

Lessons learned in implementing IAEA safeguards on U.S. excess fissile materials, Oak Ridge Y-12 Plant

Description: Highly enriched uranium (HEU) at the Oak Ridge Y-12 Plant was the initial US excess fissile material to be placed under International Atomic Energy Agency (IAEA) safeguards. This presentation describes the setting in which the US offer was made and five lessons learned from that experience which are: Lesson 1--Things may happen quickly; Lesson 2--Facility and supporting areas must provide for need of the IAEA to perform their inspection activities; Lesson 3--Familiarize site personnel with IAEA safeguards; Lesson 4--Prepare for the initial inventory verification; and Lesson 5--Prepare for inspections.
Date: February 21, 1997
Creator: Whitaker, J.M.
Partner: UNT Libraries Government Documents Department

Construction quality assurance report for the Y-12 Construction/Demolition Landfill VII (CDL VII), Oak Ridge, Tennessee

Description: This Construction Quality Assurance (CQA) Report provides documentation that Bid Option 2 of the Y-12 Plant Construction Demolition Landfill 7 (CDL-7) was constructed in substantial compliance with the Tennessee Department of Environment and Conservation (TDEC) approved design, as indicated and specified in the permit drawings, approved changes, and specifications. CDL-7 is located in Anderson County on the south side of Chestnut Ridge, approximately 0.5 miles south of the Y-12 Plant in Oak Ridge, Tennessee. This report applies specifically to the limits of excavation for Area No. 1 portions of the perimeter maintenance road and drainage channel and Sedimentation Pond No. 3. A partial ``As-Built`` survey was performed and is included.
Date: November 1, 1994
Creator: Burton, P.M.
Partner: UNT Libraries Government Documents Department

Fiscal year 1995 well plugging and abandonment program Y-12 Plant, Oak Ridge, Tennessee

Description: This report is a synopsis of the progress of the well plugging and abandonment program at the Y-12 Plant, Oak Ridge, Tennessee, from September 1994 through August 1995. A total of 67 wells, piezometers, and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned if (1) its construction did not meet current standards (substandard construction); (2) it was irreparably damaged or had deteriorated beyond practical repair; (3) its location interfered with or otherwise impeded site operations, construction, or closure activities; or (4) special circumstances existed as defined on a case-by-case basis and approved by the Y-12 Plant Groundwater Protection Program (GWPP) Manager. This summary report contains: general geologic setting of the Y-12 Plant and vicinity; discussion of well plugging and abandonment methods, grouting procedures, and waste management practices (a Waste Management Plan for Drilling Activities is included in Appendix C); summaries of plugging and abandonment activities at each site; and quality assurance/quality control (QA/QC) and health and safety protocols used during the FY 1995 Plugging and Abandonment Program.
Date: September 1995
Partner: UNT Libraries Government Documents Department

Initial report on characterization of excess highly enriched uranium

Description: DOE`s Office of Fissile Materials Disposition assigned to this Y-12 division the task of preparing a report on the 174.4 metric tons of excess highly enriched U. Characterization included identification by category, gathering existing data (assay), defining the likely needed processing steps for prepping for transfer to a blending site, and developing a range of preliminary cost estimates for those steps. Focus is on making commercial reactor fuel as a final disposition path.
Date: July 1, 1996
Partner: UNT Libraries Government Documents Department

Calendar year 1993 groundwater quality report for the Chestnut Ridge Hydrogeologic Regime Y-12 Plant, Oak Ridge, Tennessee. 1993 Groundwater quality data interpretations and proposed program modifications

Description: This groundwater quality report (GWQR) contains an evaluation of the groundwater quality data obtained during the 1993 calendar year (CY) at several hazardous and non-hazardous waste management facilities associated with the US DOE Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee. The groundwater quality data are presented in Part 1 of the GWQR submitted by Martin Marietta Energy Systems, Inc. to the Tennessee Department of Environment and Conservation (TDEC) in February 1994. Groundwater quality data evaluated in this report were obtained at several hazardous and non-hazardous waste management sites located within the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Chestnut Ridge Regime encompasses a section of Chestnut Ridge south of the Y-12 Plant and is one of three hydrogeologic regimes defined for the purposes of groundwater quality monitoring at the plant. The Environmental Management Department of the Y-12 Plant Health, Safety, Environment, and Accountability Organization manages the groundwater monitoring activities in each regime as part of the Y-12 Plant Groundwater Protection Program (GWPP). The annual GWQR for the Chestnut Ridge Regime is completed in two parts. Part 1 consists primarily of data appendices and serves as a reference for the groundwater quality data obtained each CY under the lead of the Y-12 Plant GWPP. Because it contains information needed to comply with Resource Conservation and Recovery Act (RCRA) interim status assessment monitoring and reporting requirements, the Part 1 GWQR is submitted to the TDEC by the RCRA reporting deadline (March 1 of the following CY). Part 2 (this report) contains an evaluation of the data with respect to regime-wide groundwater quality, presents the findings and status of ongoing hydrogeologic studies, describes changes in monitoring priorities, and presents planned modifications to the groundwater sampling and analysis activities.
Date: September 1, 1994
Partner: UNT Libraries Government Documents Department

Biological Monitoring Program for East Fork Poplar Creek

Description: In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit a Biological Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Y- 12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek; EFPC), in particular, the growth and propagation of aquatic life (Lear et al. 1989). A second objective of the BMAP is to document the ecological effects resulting from the implementation of a water pollution control program designed to eliminate direct discharges of wastewaters to EFPC and to minimize the inadvertent release of pollutants to the environment. Because of the complex nature of the discharges to EFPC and the temporal and spatial variability in the composition of the discharges, a comprehensive, integrated approach to biological monitoring was developed. A new permit was issued to the Y-12 Plant on April 28, 1995 and became effective on July 1, 1995. Biological monitoring continues to be required under the new permit. The BMAP consists of four major tasks that reflect different but complementary approaches to evaluating the effects of the Y-12 Plant discharges on the aquatic integrity of EFPC. These tasks are (1) toxicity monitoring, (2) biological indicator studies, (3) bioaccumulation studies, and (4) ecological surveys of the periphyton, benthic macroinvertebrate, and fish communities.
Date: October 24, 1997
Creator: Adams, S. M.; Ashwood, T. L.; Beaty, T. W. & Brandt, C. C.
Partner: UNT Libraries Government Documents Department

Emergency Planning and Community Right-To-Know Act. Section 312 Tier Two report forms

Description: As required by Right-to-Know Laws and Pollution Prevention Requirements, the Y-12 Plant staff is submitting an unclassified version of the Tier-Two Forms. This report contains data for CY 1997 for all hazardous chemicals stored at the Y-12 Plant in quantities equal to or greater than 10,000 pounds and all extremely hazardous substances stored in quantities equal to or greater than 500 pounds or the threshold planning quantity, whichever is lower. Also included with this submittal is a key to the inventory, temperature, pressure, and container codes used on the report forms. This information is included to aid in the interpretation of the data presented. It is not necessary that the code information be forwarded to the referenced state and local agencies. Classified information supporting this document will be maintained on file for review by Q-cleared personnel.
Date: February 1, 1998
Creator: Evans, R.A.
Partner: UNT Libraries Government Documents Department