298 Matching Results

Search Results

Advanced search parameters have been applied.

Downhole Power Generation and Wireless Communications for Intelligent Completions Applications, Quarterly Report: January - March 2005

Description: The wireless gauge has not been modified or upgraded during this report period. Tubel Tech is working with the DoE Rocky Mountain test center to create a CRADA to allow Tubel Tech to test its tool in a well at the test center.
Date: May 8, 2005
Creator: Tubel, Paul
Partner: UNT Libraries Government Documents Department

WETTABILITY AND PREDICTION OF OIL RECOVERY FROM RESERVOIRS DEVELOPED WITH MODERN DRILLING AND COMPLETION FLUIDS

Description: The objectives of this project are: (1) to improve understanding of the wettability alteration of mixed-wet rocks that results from contact with the components of synthetic oil-based drilling and completion fluids formulated to meet the needs of arctic drilling; (2) to investigate cleaning methods to reverse the wettability alteration of mixed-wet cores caused by contact with these SBM components; and (3) to develop new approaches to restoration of wetting that will permit the use of cores drilled with SBM formulations for valid studies of reservoir properties.
Date: January 1, 2006
Creator: Buckley, Jill S. & Morrow, Norman R.
Partner: UNT Libraries Government Documents Department

Increased oil production and reserves from improved completion techniques in the Bluebell field, Uinta Basin. Quarterly technical report, October 1, 1996--December 31, 1996

Description: The objective of this project is to increase oil production and reserves in the Uinta Basin by demonstrating improved completion techniques. Low productivity of Uinta Basin wells is caused by gross production intervals of several thousand feet that contain perforated thief zones, water-bearing zones, and unperforated oil-bearing intervals. Geologic and engineering characterization and computer simulation of the Green River and Wasatch formations in the Bluebell field will determine reservoir heterogeneities related to fractures and depositional trends. This will be followed by drilling and recompletion of several wells to demonstrate improved completion techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project. The recompletion of the Michelle Ute 7-1 well commenced and is the first step in the three-well demonstration. As part of the recompletion, the gross productive interval was logged, additional beds were perforated, and the entire interval was stimulated with a three-stage acid treatment. The operator attempted to stimulate the well at high pressure (about 10,000 pounds per square inch (psi) [68,950 kPa]) at three separate packer locations. But at each location the pressure would not hold. As a result, all three stages were pumped at a lower pressure (6500 psi maximum [44,820 kPa]) from one packer location. As of December 31, 1996, the operator was tripping in the hole with the production packer and tubing to begin swab testing the well.
Date: February 1, 1997
Creator: Morgan, C.D.
Partner: UNT Libraries Government Documents Department

DEVELOPMENT OF NEW DRILLING FLUIDS

Description: The goal of the project has been to develop new types of drill-in fluids (DIFs) and completion fluids (CFs) for use in natural gas reservoirs. Phase 1 of the project was a 24-month study to develop the concept of advanced type of fluids usable in well completions. Phase 1 tested this concept and created a kinetic mathematical model to accurately track the fluid's behavior under downhole conditions. Phase 2 includes tests of the new materials and practices. Work includes the preparation of new materials and the deployment of the new fluids and new practices to the field. The project addresses the special problem of formation damage issues related to the use of CFs and DIFs in open hole horizontal well completions. The concept of a ''removable filtercake'' has, as its basis, a mechanism to initiate or trigger the removal process. Our approach to developing such a mechanism is to identify the components of the filtercake and measure the change in the characteristics of these components when certain cleanup (filtercake removal) techniques are employed.
Date: August 1, 2003
Creator: Burnett, David B.
Partner: UNT Libraries Government Documents Department

Increased Oil Production and Reserves From Improved Completion Techniques in the Bluebell Field, Uinta Basin, Utah

Description: The Bluebell field is productive from the Tertiary lower Green River and Colton (Wasatch) Formations of the Uinta Basin, Utah. The productive interval consists of thousands of feet of interbedded fractured clastic and carbonate beds deposited in the ancestral Lake Uinta. Wells in the Bluebell field are typically completed by perforating 40 or more beds over 1000 to 3000 vertical ft (300-900 m), then stimulating the entire interval with hydrochloric acid. This technique is often referred to as the shot gun completion. Completion techniques used in the Bluebell field were discussed in detail in the Second Annual Report (Curtice, 1996). The shot-gun technique is believed to leave many potentially productive beds damaged and/or untreated, while allowing water-bearing and low-pressure (thief) zones to communicate with the wellbore. A two-year characterization study involved detailed examination of outcrop, core, well logs, surface and subsurface fractures, produced oil-field waters, engineering parameters of the two demonstration wells, and analysis of past completion techniques and effectiveness. The study was intended to improve the geologic characterization of the producing formations and thereby develop completion techniques specific to the producing beds or facies instead of a shot gun approach to stimulating all the beds. The characterization did not identify predictable-facies or predictable-fracture trends within the vertical stratigraphic column as originally hoped. Advanced logging techniques can identify productive beds in individual wells. A field-demonstration program was developed to use cased-hole advanced logging techniques in two wells and recompletion the wells at two different scales based on the logging. The first well was going to be completed at the interval scale using a multiple stage completion technique (about 500 ft [150 m] per stage). The second well will be recompleted at the bed-scale using bridge plug and packer to isolate three or more beds for stimulation. These recompletion will show ...
Date: April 1, 1998
Creator: Morgan, C.D. & Deo, M.D.
Partner: UNT Libraries Government Documents Department

Borehole Data Package for 1998 Wells Installed at Single-Shell Tank Waste Management Area TX-TY

Description: Four new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at the single-shell tank farm Waste Management Area (WMA) TX-TY during August through November of 1998 in fi,dfillment of Tri-Party Agreement (Eoology 1996) milestone M-24-38. The wells are 299-W1O-26, 299-W14-13, 299-W14-14, and 299-W15-40. Well 299-W1O-26 is located outside the east fence of the TY tank farm and replaces downgradient well299-W1O-18; well 299-W14-13 is located along the east fence near the northeast corner of the TX tank f- and replaces downgradient well 299-W14-12; well 299-W14-14 is located outside the east fence in the south ha.lfof the TX tank fiirm and is anew downgradient well; and well 299-W15-40 is located on the west side of the TX tank farm and is anew upgradient well. The locations of all wells in the monitoring network are shown on Figure 1. The groundwater monitoring plan for WMA TX-TY (Caggiano and Goodwin 1991) describes the hydrogeology of the 200 West Area and WMA TX-TY. An Interim Change Notice to the groundwater monitoring plan provides justification for the new wells. The new wells were constructed to the speciii- cations and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303. This document compiles &fiormation on the drilling and construction, well development pump instal- latio~ groundwater sampling, and sediment testing applicable to wells 299-W1O-26, 299-W14-13, 299-W14-14, and 299-W15-40. Appendix A contains the geologist's log, the Well Construction Sum- mary Repo~ and Well Summary Sheet (as-built diagram); Appendix B contains results of laboratory analyses of particle size distribution, p~ conductivity, calcium carbonate conten~ major cation and anion concentrations from 1:1 water: sediment extracts, and moisture conten~ Appendix C contains geophysical logs; and Appendix D contains the analytical results from groundwater samples obtained during well construction. Aqutier tests (slug tests) were performed on all the new ...
Date: March 23, 1999
Creator: Horton, DG & Hodges, FN
Partner: UNT Libraries Government Documents Department

Borehole Data Package for 1998 Wells Installed at Single-Shell Tank Waste Management Area T

Description: Two new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at the single-shell tank fm Waste Management Area (WMA) T in August through November of 1998 in fixlfilhnent of Tri-Party Agreement (Ecology 1996) Milestone M-24-37. The wells are 299-W1O-23 and 299-W1O-24. Well 299-W1O-23 repIaces well 299-W1O-15 and well 299-W1O-24 replaces well 299-WI 1-27; both new wells are located north of WMA T and are downgradient monitoring wells. The locations of alI wells in the extended monitoring network for WMA T are shown on Figure 1. The groundwater monitoring plan for WMA T (Caggiano and Goodwin 1991) describes the hydro- geology of the 200 West Area and WMA T. An Interim Change Notice to the groundwater monitoring plan provides justification for the new wells. The new wells were constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303. This document compiles tiormation on the ~lling and construction, well development pump install- ation, and sediment testing applicable to wells 299-W1O-23 and 299-W1O-24. Appendix A contains copies of the geologist's log, the Well Construction Summary Repo~ and Well Summary Sheet (as-built diagram); Appendix B contains results of laborato~ analyses of particIe size distribution, pHj conduc: tivi~, and moisture content Appendix C contains geophysical logs analyses; and Appendix D contains analytical results from groundwater samples obtained during well construction. Aqutier tests (slug tests) were performed on both new wells after well completions. Results of the aquifer tests will be reported elsewhere. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc., Richland, Washington.
Date: March 23, 1999
Creator: Horton, DG & Hodges, FN
Partner: UNT Libraries Government Documents Department

Increased Oil Production and Reserves from Improved Completion Techniques in the Bluebell Field, Uinta Basin, Utah

Description: The objective of the project is to increase oil production and reserves by the use of improved reservoir characterization and completion techniques in the Uinta Basin, Utah. To accomplish this objective, a two-year geologic and engineering characterization of the Bluebell field was conducted. The study evaluated surface and subsurface data, currently used completion techniques, and common production problems. It was determined that advanced case- and open-hole logs could be effective in determining productive beds and that stage-interval (about 500 ft [150 m] per stage) and bed-scale isolation completion techniques could result in improved well performance. In the first demonstration well (Michelle Ute well discussed in the previous technical report), dipole shear anisotropy (anisotropy) and dual-burst thermal decay time (TDT) logs were run before and isotope tracer log was run after the treatment. The logs were very helpful in characterizing the remaining hydrocarbon potential in the well. But, mechanical failure resulted in a poor recompletion and did not result in a significant improvement in the oil production from the well.
Date: April 28, 1999
Creator: Deo, M.D. & Morgan, C.D.
Partner: UNT Libraries Government Documents Department

Borehole Data Package for the 216-S-10 Pond and Ditch Well 299-W26-13

Description: One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at the 216-S-10 pond and ditch during November and December 1999 in fulfillment of Tri-Party Agreement (Ecology 1996) milestone M-24-42. The well is 299-W26-13 and is located at the northeast corner to the 216-S-10 pond, southwest of 200 West Area. The well is a new downgradient well in the monitoring network. Figure 1 shows the locations of all wells in the 216-S-10 pond and ditch monitoring network. The new well was constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, the groundwater monitoring plan for the 216-S-10 pond and ditch (Airhart et al. 1990), and the description of work for well drilling and installation. During drilling and construction of well 299-W26-13, sampling and analysis activities were done to support remedial action, closure decisions at treatment, storage and disposal facilities, and to confirm preliminary site conceptual models developed in the 200-CS-1 Work Plan (DOE/RL 1999). This document compiles information on the drilling and construction, well development, pump installation, and sediment and groundwater testing applicable to well 299-W26-13. Appendix A contains the Well Summary Sheet (as-built diagram), the Well Construction Summary Report, and the geologist's log. Appendix B contains results of field and laboratory determinations of physical and chemical properties of sediment samples. Appendix C contains borehole geophysical logs. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc., Richland, Washington. English units are used in this report to describe drilling and well completion activities because that is the system of units used by drillers to measure and report depths and well construction details. Conversion to metric is made by multiplying feet by 0.3048 to obtain meters or multiplying inches by 2.54 to obtain centimeters.
Date: June 1, 2000
Creator: Horton, Duane G; Williams, Barbara A & Cearlock, Christopher S
Partner: UNT Libraries Government Documents Department

Economic recovery of oil trapped at fan margins using high angle wells and multiple hydraulic fractures. Quarterly report, October 1--December 31, 1997

Description: This project attempts to demonstrate the effectiveness of exploiting thin-layered, low-energy deposits at the distal margin of a prograding turbidite complex through the use of hydraulically fractured horizontal or high-angle wells. The combination of a horizontal or high-angle well and hydraulic fracturing will allow greater pay exposure than can be achieved with conventional vertical wells while maintaining vertical communication between thin interbedded layers and the wellbore. A high-angle well will be drilled in the fan-margin portion of a slope-basin clastic reservoir and will be completed with multiple hydraulic-fracture treatments. Geologic modeling, reservoir characterization, and fine-grid reservoir simulation is used to select the well location and orientation. Design parameters for the hydraulic-fracture treatments are determined, in part, by fracturing an existing test well. Fracture azimuth is predicted by passive seismic monitoring of a fracture-stimulation treatment in the test well using logging tools in an offset well. The long radius, near horizontal well has been drilled. Swept-out sand intervals and a poor cement bond behind the 5 in. liner precluded two of the three originally planned hydraulic fracture treatments. All pay intervals behind the 5 in. liner were therefore perforated and stimulated with a non-acid reactive fluid. Following a short production period, the remaining pay intervals in the well, behind the 7 in. liner, were then perforated. The well was returned to production to observe production trends and pressure behavior prior to stimulation of the newer perforations.
Date: February 5, 1998
Creator: Laue, M.L.
Partner: UNT Libraries Government Documents Department

IMPROVED MISCIBLE NITROGEN FLOOD PERFORMANCE UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL LATERALS IN A CLASS I RESERVOIR - EAST BINGER (MARCHAND) UNIT

Description: Implementation of the work program of Budget Period 2 of the East Binger Unit (''EBU'') DOE Project continues. Major development work planned for the project includes the drilling of three horizontal production and one vertical injection wells, the conversion of five wells from production to injection service, and the expansion of injection capacity at the nitrogen management facility. Other work items include initiation of project monitoring and continued reservoir simulation. EBU 74G-2, the injection well planned to support the production of EBU 64-3H, has been drilled. Completion was underway at the time of this report. EBU 64-3H was fracture-stimulated during the period, further increasing production from this new horizontal well. Drilling of the final two wells of the pilot project is planned for 2003. Both are planned as horizontal producing wells. Work also began on projects aimed at increasing injection in the pilot area. The project to add compression and increase injection capacity at the nitrogen management facility was initiated, with completion targeted for March 2003. Additional producer-to-injector conversions are expected to be implemented around the same time. The revised history match of the simulation model has been completed, and work has begun to evaluate options with forecast simulations. The quality of the history match is significantly improved over the prior match. The predicted distribution of remaining reserves in the field is significantly changed. Decisions on projects planned for implementation later in Budget Period 2 will be guided by new forecasts.
Date: January 31, 2003
Creator: Sinner, Joe
Partner: UNT Libraries Government Documents Department

Increased Oil Production and Reserves from Improved Completion Techniques in the Bluebell Field, Uinta Basin, Utah

Description: The objective of this project is to increase oil production and reserves in the Uinta Basin by demonstrating improved completion techniques. Low productivity of Uinta Basin wells is caused by gross production intervals of several thousand feet that contain perforated thief zones, water-bearing zones, and unperforated oil-bearing intervals. Geologic and engineering characterization and computer simulation of the Green River and Wasatch Formations in the Bluebell field will determine reservoir heterogeneities related to fractures and depositional trends. This will be followed by drilling and recompletion of several wells to demonstrate improved completion techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project.
Date: November 1999
Creator: Morgan, Craig D.
Partner: UNT Libraries Government Documents Department

Feasibility of Optimizing Recovery & Reserves from a Mature & Geological Complex Multiple Turbidite Offshore Calif. Reservoir through the Drilling & Completion of a Trilateral Horizontal Well

Description: The main objective of this project is to devise an effective redevelopment strategy to combat producibility problems related to the Repetto turbidite sequences of the Carpinteria Field. The lack of adequate reservoir characterization, high-water cut production, and scaling problems have in the past contributed to the field's low productivity. To improve productivity and enhance recoverable reserves, the following specific goals are proposed: (1) Develop an integrated database of all existing data from work done by the former ownership group. (2) Expand reservoir drainage and reduce sand problems through horizontal well drilling and completion. (3) Operate and validate reservoirs' conceptual model by incorporating new data from the proposed trilateral well. (4) Transfer methodologies employed in geologic modeling and drilling multilateral wells to other operators with similar reservoirs.
Date: November 9, 1999
Creator: Coombs, Steven F.
Partner: UNT Libraries Government Documents Department

Increased oil production and reserves from improved completion techniques in the Bluebell Field, Uinta Basin, Utah. Quarterly technical progress report, July 1, 1995--September 30, 1995

Description: The objective of this project is to increase oil production and reserves in the Uinta Basin by demonstrating improved completion techniques. Low productivity of Uinta Basin wells is caused by gross production intervals of several thousand feet that contain perforated thief zones and water-bearing zones, and unperforated oil-bearing intervals. Geologic and engineering characterization and computer simulation of the Green River and Wasatch Formations in the Bluebell field will determine reservoir heterogeneities related to fractures and depositional trends. This will be followed by drilling and recompletion of several wells to demonstrate improved completion techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project.
Date: October 15, 1995
Creator: Allison, E. & Morgan, C.D.
Partner: UNT Libraries Government Documents Department

Increased Oil Production and Reserves from Improved Completion Techniques in the Bluebell Field, Uinta Basin, Utah

Description: The objective of this project is to increase oil production and reserves in the Uinta Basin by demonstrating improved completion techniques. Low productivity of Uinta Basin wells is caused by gross production intervals of several thousand feet that contain perforated thief zones, water-bearing zones, and unperforated oil-bearing intervals. Geologic and engineering characterization and computer simulation of the Green River and Wasatch Formations in the Bluebell field will determine reservoir heterogeneities related to fractures and depositional trends. This will be followed by drilling and recompletion of several wells to demonstrate improved completion techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project.
Date: November 1, 1999
Creator: Morgan, Craig D.
Partner: UNT Libraries Government Documents Department

Increased Oil Production and Reserves from Improved Completion Techniques in the Bluebell Field, Uinta Basin, Utah

Description: The objective of this project is to increase oil production and reserves in the Uinta Basin by demonstrating improved completion techniques. Low productivity of Uinta Basin wells is caused by gross production intervals of several thousand feet that contain perforated thief zones, water-bearing zones, and non-perforated oil-bearing intervals. Geologic and engineering characterization and computer simulation of the Green River and Wasatch Formations in the Bluebell field will determine reservoir heterogeneities related to fractures and depositional trends. This will be followed by drilling and recompletion of several wells to demonstrate improved completion techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project.
Date: November 1, 1999
Creator: Deo, Milind D. & Morgan, Craig D.
Partner: UNT Libraries Government Documents Department

Increased Oil Production and Reserves from Improved Completion Techniques in the Bluebell Field, Uinta Basin, Utah

Description: The objective of this project is to increase oil production and reserves in the Uinta Basin by demonstrating improved completion techniques. Low productivity of Uinta Basin wells is caused by gross production intervals of several thousand feet that contain perforated thief zones, water-bearing zones, and unperforated oil-bearing intervals. Geologic and engineering characterization and computer simulation of the Green River and Wasatch Formations in the Bluebell field will determine reservoir heterogeneities related to fractures and depositional trends. This will be followed by drilling and recompletion of several wells to demonstrate improved completion techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project.
Date: November 1, 1999
Creator: Morgan, Craig
Partner: UNT Libraries Government Documents Department

Feasibility of Optimizing Recovery & Reserves from a Mature & Geological Complex Multiple Turbidite Offshore Calif. Reservoir through the Drilling & Completion of a Trilateral Horizontal Well

Description: The main objective of this project is to devise an effective redevelopment strategy to combat producibility problems related to the Repetto turbidite sequences of the Carpinteria Field. The lack of adequate reservoir characterization, high-water cut production, and scaling problems have in the past contributed to the field's low productivity. To improve productivity and enhance recoverable reserves, the following specific goals are proposed: (1) Develop an integrated database of all existing data from work done by the former ownership group. (2) Expand reservoir drainage and reduce sand problems through horizontal well drilling and completion. (3) Operate and validate reservoirs' conceptual model by incorporating new data from the proposed trilateral well. (4) Transfer methodologies employed in geologic modeling and drilling multilateral wells to other operators with similar reservoirs.
Date: November 9, 1999
Creator: Coombs, Steven F.
Partner: UNT Libraries Government Documents Department

IMPROVED OIL RECOVERY FROM UPPER JURASSIC SMACKOVER CARBONATES THROUGH THE APPLICATION OF ADVANCED TECHNOLOGIES AT WOMACK HILL OIL FIELD, CHOCTAW AND CLARKE COUNTIES, ALABAMA, EASTERN GULF COASTAL PLAIN

Description: The principal research effort for Year 1 of the project is drilling an infill well in the Womack Hill Field, Choctaw and Clarke Counties, Alabama. The objectives of the project are to drill and core an infill well in Womack Hill Field; to utilize samples from the core to evaluate further the feasibility of implementing an immobilized enzyme technology project in the field; and to use the new information resulting from the drilling of the well to revise and modify the 3-D geologic model, to further modify the injection strategy for the existing pressure maintenance program, and to assess whether a second infill well should be drilled using lateral/multilateral well completions.
Date: December 6, 2004
Creator: Mancini, Ernest A.
Partner: UNT Libraries Government Documents Department

Downhole Power Generation and Wireless Communications for Intelligent Completions Applications

Description: Tubel Tech has been working with the DoE Rocky Mountain test center to create a CRADA which will allow Tubel Tech to test its wireless gauge in a well at the test center. The CRADA agreement should be completed by the next quarter and Tubel Tech expects to perform the final test on this project during the next quarter as well. The wireless gauge has not been modified or upgraded during this report period.
Date: November 7, 2005
Creator: Tubel, Paul
Partner: UNT Libraries Government Documents Department

Completion Report for Well Cluster ER-6-1

Description: Well Cluster ER-6-1 was constructed for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Division at the Nevada Test Site, Nye County, Nevada. This work was initiated as part of the Groundwater Characterization Project, now known as the Underground Test Area Project. The well cluster is located in southeastern Yucca Flat. Detailed lithologic descriptions with stratigraphic assignments for Well Cluster ER-6-1 are included in this report. These are based on composite drill cuttings collected every 3 meters and conventional core samples taken below 639 meters, supplemented by geophysical log data. Detailed petrographic, chemical, and mineralogical studies of rock samples were conducted on 11 samples to resolve complex interrelationships between several of the Tertiary tuff units. Additionally, paleontological analyses by the U.S. Geological Survey confirmed the stratigraphic assignments below 539 meters within the Paleozoic sedimentary section. All three wells in the Well ER-6-1 cluster were drilled within the Quaternary and Tertiary alluvium section, the Tertiary volcanic section, and into the Paleozoic sedimentary section.
Date: October 2004
Creator: Bechtel Nevada
Partner: UNT Libraries Government Documents Department

Completion Report for Well ER-7-1

Description: Well ER-7-1 was drilled for the U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in January and February 2003, as part of a hydrogeologic investigation program in Yucca Flat. A 47.0-centimeter surface hole was drilled and cased off to a depth of 541.0 meters below the surface. The hole diameter was then decreased to 31.8 centimeters for drilling to a total depth of 762.0 meters. Detailed lithologic descriptions with stratigraphic assignments are included in this report. These are based on composite drill cuttings collected every 3 meters, and 62 sidewall samples taken at various depths below 85.3 meters, supplemented by geophysical log data. Detailed petrographic, chemical, and mineralogical studies were conducted on 22 samples of cuttings. The well was collared in Quaternary surficial deposits and penetrated a thick section of Tertiary-age volcanic deposits before terminating in carbonate rocks of Paleozoic-age.
Date: November 2004
Creator: Bechtel Nevada
Partner: UNT Libraries Government Documents Department

IMPROVED OIL RECOVERY FROM UPPER JURASSIC SMACKOVER CARBONATES THROUGH THE APPLICATION OF ADVANCED TECHNOLOGIES AT WOMACK HILL OIL FIELD, CHOCTAW AND CLARKE COUNTIES, ALABAMA, EASTERN GULF COASTAL PLAIN

Description: The principal research effort for Year 1 of the project is drilling an infill well in the Womack Hill Field, Choctaw and Clarke Counties, Alabama. The objectives of the project are to drill and core an infill well in Womack Hill Field; to utilize samples from the core to evaluate further the feasibility of implementing an immobilized enzyme technology project in the field; and to use the new information resulting from the drilling of the well to revise and modify the 3-D geologic model, to further modify the injection strategy for the existing pressure maintenance program, and to assess whether a second infill well should be drilled using lateral/multilateral well completions.
Date: December 13, 2004
Creator: Mancini, Ernest A.
Partner: UNT Libraries Government Documents Department

Completion Report for Well ER-8-1

Description: Well ER-8-1 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in October and November of 2002 as part of a Hydrogeologic investigation program for the Yucca Flat/Climax Mine Corrective Action Unit in the northeastern portion of the Nevada Test Site. Well ER-8-1 is located at the north end of Yucca Flat approximately 580 meters south-southeast of the surface exposure of the Climax granitic intrusive. Detailed lithologic descriptions with stratigraphic assignments are included in this report. These are based on composite drill cuttings samples collected every 3 meters, and 21 sidewall samples taken at various depths between 351.1 and 573.0 meters, supplemented by incomplete geophysical log data. Detailed petrographic, geochemical, and mineralogical studies of rock samples were conducted on 22 samples of drill cuttings. Drilling began in tuffaceous alluvium, and the borehole penetrated Tertiary age bedded tuffs of the Volcanics of Oak Spring Butte and carbonate sediments of Paleozoic age, which were encountered at a depth of 334 meters. The borehole unexpectedly penetrated granite at the depth of 538.9 meters in which drilling was stopped. Contact metamorphic rocks and intrusive dikes associated with the Cretaceous-age granitic intrusive and at least one significant fault zone were encountered.
Date: November 2004
Creator: Bechtel Nevada
Partner: UNT Libraries Government Documents Department