Stability analysis of White Oak Dam

Description: White Oak Dam is located in the White Oak Creek watershed which provides the primary surface drainage for Oak Ridge National Laboratory. A stability analysis was made on the dam by Syed Ahmed in January 1994 which included an evaluation of the liquefaction potential of the embankment and foundation. This report evaluates the stability of the dam and includes comments on the report prepared by Ahmed. Slope stability analyses were performed on the dam and included cases for sudden drawdown, steady seepage, partial pool and earthquake. Results of the stability analyses indicate that the dam is stable and failure of the structure would not occur for the cases considered. The report prepared by Ahmed leads to the same conclusions as stated above. Review of the report finds that it is complete, well documented and conservative in its selection of soil parameters. The evaluation of the liquefaction potential is also complete and this report is in agreement with the findings that the dam and foundation are not susceptible to liquefaction.
Date: April 11, 1995
Partner: UNT Libraries Government Documents Department

1997 annual ground control operating plan for the Waste Isolation Pilot Plant

Description: This plan presents background information and a working guide to assist Mine Operations and Engineering in developing strategies for addressing ground control issues at the Waste Isolation Pilot Plant (WIPP). With the anticipated receipt of waste in late 1997, this document provides additional detail to Panel 1 activities and options. The plan also serves as a foundation document for development and revision of the annual long-term ground control plan. Section 2.0 documents the current status of all underground excavations with respect to location, geology, geometry, age, ground support, operational use, projected life, and physical conditions. Section 3.0 presents the methods used to evaluate ground conditions, including visual observations of the roof, ribs, and floor, inspection of observation holes, and review of instrumentation data. Section 4.0 lists several ground support options and specific applications of each. Section 5.0 discusses remedial ground control measures that have been implemented to date. Section 6.0 presents projections and recommendations for ground control actions based on the information in Sections 2.0 through 5.0 of this plan and on a rating of the critical nature of each specific area. Section 7.0 presents a summary statement, and Section 8.0 includes references. Appendix A provides an overview and critique of ground control systems that have been, or may be, used at the site. Because of the dynamic nature of the underground openings and associated geotechnical activities, this plan will be revised as additional data are incorporated.
Date: February 1, 1997
Partner: UNT Libraries Government Documents Department

Mine stability evaluation of panel 1 during waste emplacement operations at WIPP

Description: The specific objectives of the work were defined by the Environmental Evaluation Group (EEG) as follows: (1) assess the stability of panel 1 during the proposed operation of waste emplacement; (2) estimate the amount of time before room closure would be expected to transfer rock loads to the waste packages. The work consisted of (1) an analysis of geotechnical data and a review of the Department of Energy`s (DOE) plans for waste emplacement in panel 1, (2) an evaluation of ground conditions based on data analysis and observations of changes in ground conditions since the first evaluation in 1993 (USBM 1993), and (3) preparation of a report and presentation of the results to EEG staff. Excluded from this study are radiological safety issues and policies. The study is based on data provided by DOE and Westinghouse Electric Corporation (operator of the site) and conversations with DOE and Westinghouse personnel. MTI cannot independently verify the accuracy of the data within the scope of this study and recommends independent evaluations of data gathering, quality assurance procedures, and structural designs. The operator has the ultimate responsibility for structural designs and has expressed a strong commitment to ensuring worker safety.
Date: July 1, 1998
Creator: Maleki, H.
Partner: UNT Libraries Government Documents Department

ENHANCED CHARACTERIZATION OF THE REPOSITORY BLOCK REQUIREMENTS DOCUMENT (ECRB-RD)

Description: This Enhanced Characterization of the Repository Block Requirements Document (ECRB-RD) provides applicable design and construction requirements for the Enhanced Characterization of the Repository Block (ECRB) East-West Drift and its associated equipment. This document also identifies the applicable requirements from the Exploratory Studies Facilities Design Requirements (ESFDR) Document (YMPICM-00 19, Revision 2, ICN- 1) for design and construction of the ECRB East-West Drift, ground support, constructor support utilities and components. These requirements have been tailored specifically for the ECRB East-West Drift design and construction. The allocated requirements for the ECRB East-West Drift are in Sections III through VI. The requirements in sections III through VI contain requirement numbers from the ESFDR, Rev 2, ICN-1 for reference back to the ESFDR. Each requirement in the ECRB-RD also identifies a trace to the Site Design and Test Requirements Document (YMP/CM-0021, Rev. 2, ICN-1) and 10CFR60 similar to the style used in the ESFDR. These traces to 10CFR60 are consistent with the 1995 version of 10CFR60 used by the SD&TRD and the ESFDR. Those ESFDR requirements statements that were technically modified are identified as such and those that were derived as part of this allocation are also identified. An activity evaluation has been performed in accordance with QAP-2-0 and has determined that the QA program is applicable to this document. Therefore, the development of this document was performed in compliance with QAP-3-5, Revision 7, Development of Technical Documents and checked and reviewed in compliance with Section 5.3. This is consistent with the IOC from R. Stambaugh to M. Lugo on the subject of ECRB-RD, Revision 1, TDPP Applicability (LV.SEI.,RMS.03/98-0 12, Dated 3/12/98). The ECRB East-West Drift includes those excavated underground openings to support enhanced characterization testing activities for the repository block and provides potential extension for access to the Calico Hills formation. These openings ...
Date: March 18, 1998
Creator: Teraoka, G.M.
Partner: UNT Libraries Government Documents Department

BUSTED BUTTE TEST FACILITY GROUND SUPPORT CONFIRMATION ANALYSIS

Description: The main purpose and objective of this analysis is to confirm the validity of the ground support design for Busted Butte Test Facility (BBTF). The highwall stability and adequacy of highwall and tunnel ground support is addressed in this analysis. The design of the BBTF including the ground support system was performed in a separate document (Reference 5.3). Both in situ and seismic loads are considered in the evaluation of the highwall and the tunnel ground support system. In this analysis only the ground support designed in Reference 5.3 is addressed. The additional ground support installed (still work in progress) by the constructor is not addressed in this analysis. This additional ground support was evaluated by the A/E during a site visit and its findings and recommendations are addressed in this analysis.
Date: June 17, 1998
Creator: Bonabian, S.
Partner: UNT Libraries Government Documents Department

EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

Description: In this quarter, the field, theoretical and programming works have been performed toward achieving the research goals set in the proposal. The main accomplishments in this quarter included: (1) laboratory tests have been conducted, (2) with the added trendline analysis method, the accuracy of the data interpretation methodology will be improved and the interfaces and voids can be more reliably detected, (3) method to use torque to thrust ratio as indicator of rock relative hardness has also been explored, and (4) about 80% of the development work for the roof geology mapping program, MRGIS, has completed.
Date: January 15, 2003
Creator: Peng, Syd S.
Partner: UNT Libraries Government Documents Department

EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

Description: A one-year non-cost extension has been granted for this project. In this quarter, the field, theoretical and programming works have been performed toward achieving the research goals set in the proposal. The main accomplishments in this quarter included: (1) laboratory tests have been conducted, (2) with the added trendline analysis method, the accuracy of the data interpretation methodology will be improved and the interfaces and voids can be more reliably detected, (3) method to use torque to thrust ratio as indicator of rock relative hardness has also been explored, and (3) about 80% of the development work for the roof geology mapping program, MRGIS, has completed and a special version of the program is in the field testing stage.
Date: April 15, 2004
Creator: Peng, Syd S.
Partner: UNT Libraries Government Documents Department

ECRB ALCOVE AND NICHE GROUND SUPPORT ANALYSIS

Description: The purpose of the analysis is to provide design bases for Enhanced Characterization of the Repository Block (ECRB) alcove and niche ground support drawings. The objective is to evaluate the ESF Alcove Ground Support Analysis (Ref 5.1) to determine if the calculations technically bound the ECRB alcoves and to address specific differences in the conditions and constraints.
Date: May 9, 1999
Creator: Keifer, J.W.
Partner: UNT Libraries Government Documents Department

SOUTH RAMP 3.01.X AREA GROUND SUPPORT ANALYSIS

Description: The purpose of this analysis is to evaluate the stability and determine ground support requirements for the 3.01.X areas in the Exploratory Studies Facility (ESF) South Ramp. The 3.01.X area refers to the ESF tunnel portions that were constructed under Section 3.01.X of the ESF General Construction Specification (Reference 8.4). Four 3.01.X areas in the ESF Main Loop are covered in this analysis that extend from Station 60+15.28 to 60+49.22, 62+04.82 to 62+32.77, 75+21.02 to 75+28.38, and 76+63.08 to 77+41.23. The scope of the analysis is (1) to document the as-built configuration including existing voids and installed ground support, (2) to evaluate the existing ground conditions, (3) to determine applicable design loads, (4) to evaluate the stability and determine a ground support system, and (5) to analyze the recommended system.
Date: July 12, 1999
Creator: Bonabian, S.
Partner: UNT Libraries Government Documents Department

PERMANENT ROCKBOLT AND TEMPORARY CHANNEL INTERACTION ANALYSIS

Description: The purpose of this analysis is to evaluate the interaction of a quality assurance (QA) classified item (QA-1 and QA-5) with an item of temporary function (QA: NONE), in accordance with Requirement 8 of the Determination of Importance Evaluation (DIE) (Reference Section 5.1). This interaction analysis will be done by determining the forces on ''Williams'' rockbolts transferred from temporary function channels under maximum capacity loads, and ensuring that these loads do not compromise the critical characteristics of these rockbolts.
Date: March 14, 1995
Creator: Keifer, J. & Taylor, M.
Partner: UNT Libraries Government Documents Department

ESF SOUTH PORTAL BOX-CUT/HIGHWALL STABILITY ANALYSIS (SCPB:N/A)

Description: The main purpose and objective of this analysis is to design a Box-Cut at the ESF South Portal to accommodate the Tunnel Boring Machine's (TBM) exit at the conclusion of the ESF Main Loop construction. The stability of the Highwall and the sidewalls at the Box-Cut are assessed using analytical methods by numerical modeling techniques. A ground reinforcement system for the South Ramp Box-Cut slopes will be recommended. This report summarizes the results of the analyses and provides the details of the recommended ground reinforcement system for the Box-Cut slopes at the South Portal. The reinforcement design details are then incorporated into design output documents for implementation in the field. Method of excavation for the Box-Cut is also discussed and a recommendation is provided in this analysis.
Date: March 28, 1996
Creator: Bonabian, Saeed
Partner: UNT Libraries Government Documents Department

Ground Control System Description Document

Description: The Ground Control System contributes to the safe construction and operation of the subsurface facility, including accesses and waste emplacement drifts, by maintaining the configuration and stability of the openings during construction, development, emplacement, and caretaker modes for the duration of preclosure repository life. The Ground Control System consists of ground support structures installed within the subsurface excavated openings, any reinforcement made to the rock surrounding the opening, and inverts if designed as an integral part of the system. The Ground Control System maintains stability for the range of geologic conditions expected at the repository and for all expected loading conditions, including in situ rock, construction, operation, thermal, and seismic loads. The system maintains the size and geometry of operating envelopes for all openings, including alcoves, accesses, and emplacement drifts. The system provides for the installation and operation of sensors and equipment for any required inspection and monitoring. In addition, the Ground Control System provides protection against rockfall for all subsurface personnel, equipment, and the engineered barrier system, including the waste package during the preclosure period. The Ground Control System uses materials that are sufficiently maintainable and that retain the necessary engineering properties for the anticipated conditions of the preclosure service life. These materials are also compatible with postclosure waste isolation performance requirements of the repository. The Ground Control System interfaces with the Subsurface Facility System for operating envelopes, drift orientation, and excavated opening dimensions, Emplacement Drift System for material compatibility, Monitored Geologic Repository Operations Monitoring and Control System for ground control instrument readings, Waste Emplacement/Retrieval System to support waste emplacement operations, and the Subsurface Excavation System for ground control installation.
Date: July 31, 2001
Creator: Loros, Eric
Partner: UNT Libraries Government Documents Department

Subsurface Ventilation System Description Document

Description: The Subsurface Ventilation System supports the construction and operation of the subsurface repository by providing air for personnel and equipment and temperature control for the underground areas. Although the system is located underground, some equipment and features may be housed or located above ground. The system ventilates the underground by providing ambient air from the surface throughout the subsurface development and emplacement areas. The system provides fresh air for a safe work environment and supports potential retrieval operations by ventilating and cooling emplacement drifts. The system maintains compliance within the limits established for approved air quality standards. The system maintains separate ventilation between the development and waste emplacement areas. The system shall remove a portion of the heat generated by the waste packages during preclosure to support thermal goals. The system provides temperature control by reducing drift temperature to support potential retrieval operations. The ventilation system has the capability to ventilate selected drifts during emplacement and retrieval operations. The Subsurface Facility System is the main interface with the Subsurface Ventilation System. The location of the ducting, seals, filters, fans, emplacement doors, regulators, and electronic controls are within the envelope created by the Ground Control System in the Subsurface Facility System. The Subsurface Ventilation System also interfaces with the Subsurface Electrical System for power, the Monitored Geologic Repository Operations Monitoring and Control System to ensure proper and safe operation, the Safeguards and Security System for access to the emplacement drifts, the Subsurface Fire Protection System for fire safety, the Emplacement Drift System for repository performance, and the Backfill Emplacement and Subsurface Excavation Systems to support ventilation needs.
Date: July 25, 2001
Creator: Loros, Eric
Partner: UNT Libraries Government Documents Department

Waste Emplacement/Retrieval System Description Document

Description: The Waste Emplacement/Retrieval System transports Waste Packages (WPs) from the Waste Handling Building (WHB) to the subsurface area of emplacement, and emplaces the WPs once there. The Waste Emplacement/Retrieval System also, if necessary, removes some or all of the WPs from the underground and transports them to the surface. Lastly, the system is designed to remediate abnormal events involving the portions of the system supporting emplacement or retrieval. During emplacement operations, the system operates on the surface between the WHB and North Portal, and in the subsurface in the North Ramp, access mains, and emplacement drifts. During retrieval or abnormal conditions, the operations areas may also extend to a surface retrieval storage site and South Portal on the surface, and the South Ramp in the subsurface. A typical transport and emplacement operation involves the following sequence of events. A WP is loaded into a WP transporter at the WHB, and coupled to a pair of transport locomotives. The locomotives transport the WP from the WHB, down the North Ramp, and to the entrance of an emplacement drift. Once docked at the entrance of the emplacement drift, the WP is moved outside of the WP transporter, and engaged by a WP emplacement gantry. The WP emplacement gantry lifts the WP, and transports it to its emplacement location, where the WP is then lowered to its final resting position. The WP emplacement gantry remains in the drift while the WP transporter is returned to the WHB by the locomotives. When the transporter reaches the WHB, the sequence of operations is repeated. Retrieval of all the WPs, or a large group of WPs, under normal conditions is achieved by reversing the emplacement operations. Retrieval of a small set of WPs, under normal or abnormal conditions, is known as recovery. Recovery performed under abnormal ...
Date: July 25, 2001
Creator: Loros, Eric
Partner: UNT Libraries Government Documents Department

Management of dry flue gas desulfurization by-products in underground mines. Quarterly report, August 1--October 31, 1997

Description: The objective of this project was to develop and demonstrate two technologies for the placement of coal combustion by-products in abandoned underground coal mines, and to assess the environmental impact of these technologies for the management of CCB materials. The two technologies for the underground placement that were to be developed and demonstrated are: (1) pneumatic placement using virtually dry CCB products, and (2) hydraulic placement using a paste mixture of CCB products with about 70% solids. The period covered by this report is the second quarter of Phase 3 of the overall program. During this period over 8,000 tons of CCB mixtures was injected using the hydraulic paste technology. This amount of material virtually filled the underground opening around the injection well, and was deemed sufficient to demonstrate fully the hydraulic injection technology. By the end of this quarter about 2,000 tons of fly ash had been placed underground using the pneumatic placement technology. While the rate of injection of about 50 tons per hour met design criteria, problems were experienced in the delivery of fly ash to the pneumatic demonstration site. The source of the fly ash, the Archer Daniels Midland Company power plant at Decatur, Illinois is some distance from the demonstration site, and often sufficient tanker trucks are not available to haul enough fly ash to fully load the injection equipment. Further, on some occasions fly ash from the plant was not available. The injection well was plugged three times during the demonstration. This typically occurred due to cementation of the FBC ash in contact with water. After considerable deliberations and in consultation with the technical project officer, it was decided to stop further injection of CCB`s underground using the developed pneumatic technology.
Date: December 31, 1997
Creator: Chugh, Y.P.
Partner: UNT Libraries Government Documents Department

High volume-high value usage of flue gas desulfurization (FGD) by-products in underground mines: Phase 2 -- Field investigations. Quarterly report, October 1--December 31, 1997

Description: The field investigation phase of the project was essentially completed when grout placed into auger holes at the Lodestar Energy mine site during Summer 1997 was sampled. Mining had proceeded to a point where the strata overlying the coal was completely removed, thus exposing the grout-filled auger holes. All of the auger holes contained either grout from these experiments or shale that in-filled the non-grouted holes during the process of clearing the top surface of the coal. Eleven grouted holes were sampled, utilizing hammers and chisels, for physical (strength) testing, as well as chemical, mineralogical, and microscopical analysis. Upon arrival at the laboratory, moisture contents, densities, and void ratios were obtained before disturbing the samples, and after strength testing. Representative samples of each grout were then cut into flat-sided prisms, with a height:width ratio {approx}2, to be used for testing of unconfined compressive strength. In summary, all of the grouts had very good mechanical strength, ranging from 1000 psi to 2250 psi. The lowest compressive strength was recorded on a bed ash-based grout.
Date: August 1, 1998
Partner: UNT Libraries Government Documents Department

Using three dimensional structural simulations to study the interactions of multiple excavations in salt

Description: Three-dimensional quasistatic finite element codes are being used at Sandia National Laboratories to simulate the interactions of multiple large room and pillar mines in rock salt. The calculations presented in this paper are of a salt dome which contains multiple closely-spaced room and pillar mines. One of the mines was used as an oil storage facility, supported by the US DOE under the auspices of the Strategic Petroleum Reserve (SPR) program. The facility has recently been decommissioned due to the discovery of geotechnical instabilities. The model, validated by field observations, has resulted in a better understanding of the mechanisms which can threaten the stability of an underground excavation, as well as the structural interactions of multiple excavations. Although these calculations were performed in the specific interest of the SPR, the results should be of interest to mine designers concerned with the interactions of multiple mines excavated in a common formation.
Date: February 1, 1998
Creator: Hoffman, E.L. & Ehgartner, B.L.
Partner: UNT Libraries Government Documents Department

Longevity of Emplacement Drift Ground Support Materials for LA

Description: The purpose of this analysis report is to evaluate and document the inclusion or exclusion of the disruptive events features, events, and processes (FEPs) with respect to modeling used to support the total system performance assessment for license application (TSPA-LA). A screening decision, either ''Included'' or ''Excluded,'' is given for each FEP, along with the technical basis for screening decisions. This information is required by the U.S. Nuclear Regulatory Commission (NRC) at 10 CFR 63.114 (d), (e), and (f) [DIRS 156605]. The FEPs addressed in this report deal with both seismic and igneous disruptive events, such as fault displacements through the repository and an igneous intrusion into the repository. For included FEPs, this analysis summarizes the implementation of the FEP in TSPA-LA (i.e., how the FEP is included). For excluded FEPs, this analysis provides the technical basis for exclusion from TSPA-LA (i.e., why the FEP is excluded). Previous versions of this report were developed to support the total system performance assessments (TSPA) for various prior repository designs. This revision addresses the repository design for the license application (LA).
Date: September 16, 2003
Creator: Tang, D.
Partner: UNT Libraries Government Documents Department

Managing discovery risks--A Tevatron case study

Description: To meet the increasing need for higher performance, Management of Fermi National Accelerator Laboratory has undertaken various projects to improve systems associated with the Tevatron high-energy particle collider located at Batavia, Illinois. One of the larger projects is the Tevatron Beam Position Monitor (BPM) system. The objective of this project is to replace the existing BPM electronics and software system that was originally installed during early 1980s, along with the original construction of the Tevatron.The original system consists of 236 beam position monitors located around the underground tunnel of the accelerator. Above ground control systems are attached to these monitors using pickup cables. When the Tevatron collider is operational, signals received from the BPMs are used to perform a number of control and diagnostic tasks. The original system can only capture the proton signals from the collider. The new system, when fully operational, will be able to capture combined proton and antiproton signals and will be able to separate the antiproton signal from the combined signal at high resolution. This significant enhancement was beyond the range of technical capabilities when the Tevatron was constructed about two decades ago. To take advantage of exceptional progress made in the hardware and software area in past two decades, Department of Energy approved funding of the BPM electronics and software replacement project. The approximate length of the project is sixteen months with a budget of four million dollars not including overhead, escalation, and contingencies. Apart from cost and schedule risks, there are two major risks associated with this research and development project. The primary risk is the risk of discovery. Since the Tevatron beam path is highly complex, BPMs have to acquire and process a large amount of data. In this environment, analysis of data to separate antiproton signals is even more complex. Finding ...
Date: July 28, 2004
Creator: Banerjee, Bakul
Partner: UNT Libraries Government Documents Department

UNDERGROUNG PLACEMENT OF COAL PROCESSING WASTE AND COAL COMBUSTION BY-PRODUCTS BASED PASTE BACKFILL FOR ENHANCED MINING ECONOMICS

Description: This project has successfully demonstrated that the extraction ratio in a room-and-pillar panel at an Illinois mine can be increased from the current value of approximately 56% to about 64%, with backfilling done from the surface upon completion of all mining activities. This was achieved without significant ground control problems due to the increased extraction ratio. The mined-out areas were backfilled from the surface with gob, coal combustion by-products (CCBs), and fine coal processing waste (FCPW)-based paste backfill containing 65%-70% solids to minimize short-term and long-term surface deformations risk. This concept has the potential to increase mine productivity, reduce mining costs, manage large volumes of CCBs beneficially, and improve the miner's health, safety, and environment. Two injection holes were drilled over the demonstration panel to inject the paste backfill. Backfilling was started on August 11, 1999 through the first borehole. About 9,293 tons of paste backfill were injected through this borehole with a maximum flow distance of 300-ft underground. On September 27, 2000, backfilling operation was resumed through the second borehole with a mixture of F ash and FBC ash. A high-speed auger mixer (new technology) was used to mix solids with water. About 6,000 tons of paste backfill were injected underground through this hole. Underground backfilling using the ''Groutnet'' flow model was simulated. Studies indicate that grout flow over 300-foot distance is possible. Approximately 13,000 tons of grout may be pumped through a single hole. The effect of backfilling on the stability of the mine workings was analyzed using SIUPANEL.3D computer program and further verified using finite element analysis techniques. Stiffness of the backfill mix is most critical for enhancing the stability of mine workings. Mine openings do not have to be completely backfilled to enhance their stability. Backfill height of about 50% of the seam height is adequate ...
Date: June 1, 2002
Creator: Chugh, Y.P.; Biswas, D. & Deb, D.
Partner: UNT Libraries Government Documents Department

Ground Control for Non-Emplacement Drifts for LA

Description: The purpose of this calculation is to analyze the stability of repository non-emplacement drifts during the preclosure period, and to provide a final ground support method for non-emplacement drifts for the License Application (LA). This calculation will provide input for the development of LA documents. The scope of this calculation is limited to the non-emplacement drifts including access mains, ramps, exhaust mains, turnouts, intersections between access mains and turnouts, and intersections between exhaust mains and emplacement drifts, portals, TBM launch chambers, observation drift and test alcove in the performance confirmation (PC) facilities, etc. The calculation is limited to the non-emplacement drifts subjected to a combined loading of in-situ stress, seismic stress, and/or thermal stress. Other effects such as hydrological and chemical effects are not considered in this analysis.
Date: February 26, 2004
Creator: Tang, D.
Partner: UNT Libraries Government Documents Department

THERMAL TEST ALCOVE HEATED DRIFT GROUND SUPPORT ANALYSIS

Description: The main purpose and objective of this analysis is to analyze the stability of the Thermal Test Facility Heated Drift and to design a ground support system. The stability of the Heated Drift is analyzed considering in situ, seismic, and thermal loading conditions. A ground support system is recommended to provide a stable opening for the Heated Drift. This report summarizes the results of the analyses and provides the details of the recommended ground support system for the Heated Drift. The details of the ground support system are then incorporated into the design output documents for implementation in the field.
Date: October 3, 1996
Creator: Bonabian, S.
Partner: UNT Libraries Government Documents Department

TBV-322/TBD-325 RESOLUTION ANALYSIS: GEOTECHNICAL ROCK PROPERTIES

Description: The process of underground excavation design is being performed in several phases to satisfy the requirements of Yucca Mountain Site Characterization Project (YMP). These phases were conceptualized to satisfy increasingly focused requirements as the YMP progresses and more detailed site characterization data are acquired. At the time that initial design analyses were prepared, the rock mass parameters were derived from the exploratory core drillings, and as such their values were considered preliminary. Field evidence was needed to verify the magnitudes of these parameters. According to the respective YMP procedures, incomplete data that require further verification are flagged by the TBV (To Be Verified) designation and data that are not available are flagged by the TBD (To Be Determined) designation. Field mapping activities performed during the Exploratory Studies Facility (ESF) Main Loop (i.e., the North Ramp, Main Drift, and South Ramp) tunnel excavation resulted in accumulation of the field data that enlarge and complement the initial, core-derived rock property database. To date, a number of the ESF design confirmation analyses have been completed in a form of topical reports. These reports were prepared to satisfy the requirements of 10 CFR 60.141, ''Confirmation of Geotechnical and Design Parameters''. The design confirmation analyses are documentary in nature and provide a detailed account of the origin and derivation of rock mass parameters. The successive enlargement of the initial, core-derived rock property database created the need for development of meaningful procedures for data interpretation. In effect, each rock parameter has been represented by several values ranging in magnitudes. In a subsequent analysis (CRWMS M&O 1998a) the data were evaluated for consistency. The values of rock property data included in the topical analyses summarize both the initial core-derived and the field-obtained rock property data. Evaluation and verification of the data obtained following quality assurance procedures (qualified ...
Date: September 13, 1999
Creator: Mrugala, M. J.
Partner: UNT Libraries Government Documents Department